VCAT Volume 12 No 8
1. Relevant considerations and flood impacts: the need for planning controls
Issues concerning the Tribunal’s jurisdiction and relevant considerations continue to be raised in Tribunal cases. Two recent cases address the relevance of flood impacts. The two cases are also noteworthy for the commentary on the option that planning authorities have in introducing planning scheme amendments on flood controls.
In Kiyagan v Baw Baw SC [2025] VCAT 206, the Tribunal held that Council’s grounds of refusal relating to flooding is an irrelevant consideration due to there being no flood-related overlays applying to the site. The Catchment Management Authority’s (CMA) request to be made a party to the appeal was also refused, despite objecting to the application.
Whilst a flood study had identified the site as flood prone, the Council had abandoned a planning scheme amendment in September 2022 to introduce flood overlays to the site. This decision was made contrary to Council officer’s recommendation to refer submissions to a Panel hearing.
The Tribunal noted that questions as to how planning decision makers should interpret the Planning and Environment Act 1987 (P&E Act) and planning schemes to discern the relevant considerations for each application are not new, and “have been brought into sharper focus by recent decisions of the Courts and Tribunal.”
In particular, the Tribunal considered the present case is similar to the Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191 scenario in that there are a number of provisions in the Victorian Planning Provisions and the Baw Baw Planning Scheme which would have required consideration of flooding but have not been enacted so as to apply to the review site and consequently the decision under review. It is the absence of those controls applying to the land which was important to this decision.
On the basis of the relevant cases, the Tribunal considered that the CMA and the Council needed to demonstrate a clear link between the permissions required under the planning scheme and the general and policy provisions they seek to rely on. Without specific permit triggers, and the fact that the Council had abandoned a planning scheme amendment to introduce a flood control, the Tribunal stated:
It is however reasonable to record that the very matters the Council as responsible authority wishes to be considered are those which it declined to introduce into the Scheme in its role as planning authority under the PE Act. There is a process for amending a planning scheme. This is generally a public process. The requirements are set out in the PE Act.
Had I taken a different view of this matter and allowed the Council and the CMA to approach the matter on the basis each advocated for, that would have served to undermine the importance of ensuring that expectations regarding technical matters such as flooding are clearly set out in the planning scheme. To allow these matters to be assessed essentially on the basis of the work done for amendment L144 but without it having been tested or implemented would undermine the integrity of the planning scheme amendment process set out in the PE Act.
This decision ought not to be taken to undermine the importance of flood impact being considered where the risk has been demonstrated to exist and recognised in the planning scheme. Nor should it be taken to suggest that implementing such provisions is without practical difficulty particularly given the dynamic nature of flood risk which may change over time. It is, however, important that the requirements which apply to land are transparently identified in the planning scheme for the benefit of owners, purchasers and decisions-makers alike. [116-118]
In Maddock v Strathbogie SC [2025] VCAT 250, the Council issued a Notice of Decision to Grant a Planning Permit for the use and development of land for a camping and caravan park, restaurant, place of assembly, two lot subdivision, creation of easement and removal of native vegetation.
The site is in the Farming Zone. A small part of the site is in the Flood Overlay (FO), though both the Council and CMA are aware that potential flooding impacts on the land are more extensive than the current application of the FO.
The Tribunal considered that there were two issues for determination:
- whether the Applicant can make submissions, call evidence or raise flood risk under the FO; and
- whether the applicant can make submissions about flood risk under any other provisions of the scheme.
With respect to the first issue, the Tribunal considered the facts are analogous to the pertinent facts before the Supreme Court in Myers v Southern Grampians Shire Council [2023] VSC 658. Whilst there is a notable difference being the source of the exemption in the relevant scheme (in Myers, the exemption arose in DDO6, in the current proceeding it is contained in the FO), the analysis of the exemption is identical in that:
- VCAT is a creature of statute, and its review jurisdiction is provided in section 42 of the Victorian Civil and Administrative Tribunal Act 1998 (VCAT Act);
- Section 6 of the P&E Act sets out matters which may be provided for in a scheme. Section 6(kc) of the P&E Act set out classes of applications for permits exempted wholly or in part from section 52(1) and set out notice requirements (if any) to apply in place of the requirements of that subsection. Section 6(kd) of the P&E Act set out classes of applications the decisions on which are exempted from the requirements of section 64(1), (2) and (3) and section 82(1);
- Section 82(3) of the P&E Act operates to limit VCAT’s jurisdiction to review under the permission not subject to any third party notice and review rights. Thus, VCAT cannot consider the permit granted under the FO in this proceeding because that decision is not amenable to review at VCAT; and
- Council’s decision under the FO is ‘a given’ and in considering the application that is before it, VCAT may give the permission granted under the FO the weight it considers is appropriate in the final determination of the proceeding.
On the second issue, the Tribunal held that the Applicant cannot make submissions, lead evidence or raise issues with respect to flooding for that part of the land not subject to the FO because flood risk is not a matter that arises under the Farming Zone, sections 60(1)(e) and 84B of the P&E Act and Cls 65 or 71.02 of the scheme.
Both the Council and CMA are aware that a greater proportion of the land is subject to flooding. However, to date the Council as the planning authority has not progressed any planning scheme amendment to address the knowledge it has about flood risk. The Tribunal stated:
That leaves everyone in this proceeding including VCAT in a difficult position. However, VCAT must apply the law as it exists at the time it makes its decision.
However, I am also cognisant that this is a situation where the tools exist to ensure that flood risk can be assessed through the planning scheme process. Noting that this requires steps to be taken by the planning authority. Such a process creates certainty and fairness to all those involved and simplifies assessment of applications in the planning regime.
Rather than requiring amendments to the application to delete reference to flood risk, I consider my determination of the question to be clear and thus, it appropriate to confirm the current dates for the compulsory conference and hearing. [128-130]
Your editors note that preparing flood studies and introducing flood controls in planning schemes is a very expensive and time-consuming exercise. Whilst some funding has been made available by the State Government to prepare flood studies and assist in the introduction of flood controls, the Government has not prioritised such amendments like it has with major development that contributes to economic development and housing. Flood controls can also be controversial as landowners sometimes perceive such controls can affect their development rights. Concerns about increases in insurance premiums are also common in submissions on flood controls. However, without appropriate flood controls in place, it is clear that the Tribunal’s jurisdiction to deal with potential flood impacts is curtailed.
See also:
- Guide to Planning Appeals: National Trust Principle > Relevance of specific clauses and decision guidelines in the planning scheme with control trigger, Flood risk
2. The complexities of identifying flood risk
Whereas the above two cases concerned the relevance of flood risk and the rights of parties to make submissions on flood impacts, the case of 51 Hardiman Pty Ltd v Melbourne CC & Ors [2025] VCAT 222 demonstrates the complexities of identifying potential flood risks from a proposed development under a flood control.
The proposal was for an eight-storey residential apartment building in central Melbourne. The subject land is in the Land Subject to Inundation (LSIO).
The Tribunal observed the proceedings were heard over numerous days, the subject of three conclave processes with detailed evidence on flood hydrology, flood hydraulics, joint probability analysis of riverine and coastal processes, flood risk and flood mitigation.
Post-hearing, numerous further submissions and documents were lodged with the Tribunal, at its request, through a series of interim orders that were invariably triggered by requests from the Tribunal for additional information such as a flood matrix table or, as a result of proposed and gazetted changes to the Melbourne Planning Scheme, such as the exhibition of proposed Amendment C417 and the gazettal of Amendment C384, or as a result of Tribunal and Supreme Court decisions handed down since the conclusion of the hearing.
One of the areas of dispute concerned projected changes associated with climate change to the year 2100 rather than about flood hazard under current conditions. The Applicant did not accept Melbourne Water’s recommended 1% AEP 2100 flood level submitting it was too high. The Applicant sought to manage the population at risk by removing them from exposure to the flood hazard through elevating the building’s habitable floors above what they considered to be an appropriate flood level supported by a suitable freeboard and to mitigate risks due to human behaviour by implementing a Flood Risk Management Plan (FRMP).
Overall, the Tribunal found that the level of uncertainty persuaded it “not to support this proposal at this point in time.” Whilst acknowledging the site is in the Macaulay major urban renewal precinct where there is strong strategic support and direction for higher density residential and mixed use development, it accepted Council’s proposition that it is not a case of anything goes. The site will be constrained by flooding and the LSIO3 requires safety to life to be considered.
See also:
- Guide to Planning Appeals: Flood risk
3. Notice under Reg 37 of the Subdivision (Procedures) Regulations 2021
Regulation 37 of the Subdivision (Procedures) Regulations 2021 (SP Regulations) provides:
An application to VCAT under section 36(1) of the Act may be made within 30 days after the day on which the applicant gives the owner of the land that is burdened or to be burdened by the easement a notice of intention to apply.
In View Bank Homes 1 Pty Ltd v Whittlesea CC [2025] VCAT 261, a practice day hearing was held to consider whether a Notice of Intention to apply for leave to acquire an easement had been given to the relevant owner of the land. Notice of Intention had not been given to the Respondent.
The Applicant contended that:
- the language of ‘may be made’ is not couched as a prerequisite or requirement which must be done prior to an application being made to the Tribunal;
- the intent of the regulation is to inform the landowner of the land to be burdened by the easement of any forthcoming application; and
- even if it is determined that the compliance with regulation 37 of the SP Regulations is a precondition to an application being made to the Tribunal under section 36(1) of the Subdivision Act 1988, the Tribunal may disregard any noncompliance with that regulation where it is in the interests of justice to do so.
In rejecting the Applicant’s submissions, the Tribunal held:
- Regulation 37 confers an opportunity on a person to make application to the Tribunal under section 36(1) of the Subdivision Act.
- The timing of when an application is to be made is clear from the unambiguous language used. If an application is to be made, it may be made within a 30-day period after a Notice of Intention to make such an application is given to the owner of land burdened or to be burdened. Grammatically what ‘may be made’ is the application to the Tribunal and not the Notice of Intention to make such an application.
- This interpretation is consistent with the purpose of regulation 37 which is not only to provide notice to an owner of land that is burdened or to be burdened that a person is contemplating making an application under section 36 of the Subdivision Act to the Tribunal but also to provide the burdened owner with certainty as to when such an application will be made, if it is to be made. Without such time limitation, a burdened owner will be left in a state of uncertainty as to whether a discussion with an adjoining owner some months or even years previously may manifest itself in an application to the Tribunal at the timing and convenience of the adjoining owner. The Applicant’s interpretation does not result in a fair outcome for all stakeholders in this process.
The Tribunal therefore found that the Applicant was required to give the owner of the adjoining property Notice of Intention to apply to the Tribunal under section 36(1) of the Subdivision Act and such notice was required to be given within the 30 day period prior to the date of making the application under section 36(1) of the Subdivision Act.
See also:
- Guide to Planning Appeals: Subdivision (Procedures) Regulations 2021
4. Does a reduction in the number of dwellings justify a refusal during the housing crisis?
Both the Federal and State Governments are pursuing many initiatives to address the housing shortage. The Victorian State Government is also pursuing a number of changes to planning policies and controls to streamline planning processes to deliver more housing, such as Amendment VC267 which expands the deemed to comply provisions to facilitate residential development. Does that mean every development should maximise the number of dwellings?
In Coda One Pty Ltd v Stonnington CC [2025] VCAT 258, the Tribunal considered a proposal for a new three storey building containing five three-bedroom dwellings with basement car parking.
The site is currently developed with 10 one bedroom apartments. The Council and objectors submitted that the proposal should not gain any policy weighting benefits of housing supply versus respecting neighbourhood character, an argument supported by the Tribunal. However, in setting aside the Responsible Authority’s decision to refuse the application, it stated:
…. this proposal will result in a net loss of homes on this site. At face value, this is at odds with the recent Victorian Government focus on the need for more housing including affordable housing. It is an issue that was raised by Council and the respondents, particularly in submitting that this proposal should not get any weighing benefit in the balancing of competing policy objectives (i.e. balancing housing consolidation policy with neighbourhood character policy). The net loss of homes appears at odds with current planning policies including:
-
- the housing supply general strategies at clause 16.01-1L-01 that include encouraging residential infill development that maintains a balance of dwelling types in established residential areas;
- the statement in clause 02.03-5 that a rapid increase in house prices and land values is driving a need for increased housing capacity that is affordable and accessible; and
-
- the following strategic directions for housing at clause 02.03-5:
- Accommodate the projected population, in particular making provision of increased numbers of smaller households.
- Maintain housing diversity and provide housing choice to meet the future needs of Stonnington’s population, including for families, young people, smaller households, older people and people living with a disability.
- the following strategic directions for housing at clause 02.03-5:
I accept the existing building on the site can be demolished at any time without the need for any planning permission. It contains 10 one bedroom apartments, but the applicant and its expert witnesses say these apartments are old and do not meet modern standards. There is some truth in this as these apartments are small, have limited car parking and offer no private open space (for example, a balcony). Nevertheless, if this development proceeds, 10 existing affordable one bedroom apartments will be lost and will be replaced with five three bedroom apartments.
Back in 2023, the Tribunal observed at paragraph 170 of Creative Property Developments Pty Ltd v Stonnington CC [2023] VCAT 691 that:
While I agree that the provision of medium density housing in well serviced locations like this one has strengthened policy backing since the permit was originally granted, the form of accommodation proposed would see a halving of the number of dwellings from 18 to 9 with larger three bedroom apartments now proposed. I also accept that differently configured apartments would respond to consumer preferences, but it could be equally said that a loss of nine dwellings in such a well serviced location is a matter that weighs against this proposal. …
This is a pertinent observation that is equally applicable in this case. The applicant orally acknowledged in the hearing that there is a desire at both State and local government levels for more housing, for more affordable housing, and for accommodation for smaller households. However, the applicant submits that not every site has to meet those broad housing objectives, and not every development has to contribute to new housing or housing in the same way as has existed before. The applicant emphasises that the existing building is old, ageing and not fit for purpose for today’s housing standards. The applicant acknowledges that this proposal for three bedroom dwellings with private open space and car parking will appeal to a different residential market to what has existed on this site in the past. However, the applicant submits residential development must be realistic and viable, and three bedroom apartments can appeal to a range of household sizes and provide a different choice of apartment.
There is no policy in the planning scheme that requires a new residential development to maintain affordable housing.
There is no policy in the planning scheme that requires a new residential development to maintain the number of homes on a site or to maintain the current mix of homes on a site.
So, whilst this proposal appears to be somewhat at odds with the significant changes being made to town planning and housing industries, I am unable to conclude that this is an unacceptable residential development because of these factors. I do agree, however, with the submissions by Council and the residents that this proposal does not gain any policy weighting benefits of housing supply versus respecting neighbourhood character. [7-13]
Your editors note that the subject site is located in the wealthy suburb of Toorak where the feasibility of larger apartment sizes with fewer dwellings is likely to be more marketable for the area than the single bedroom apartment typology it replaces.
See also:
- Guide to Planning Appeals: Underdevelopment
5. Does a condition requiring a traffic impact report before commencement of buildings and works affect when the report must be submitted?
In 723 Calder Highway Maiden Gully Pty Ltd v Head, Transport for Victoria (Department of Transport and Planning) [2025] VCAT 255, the Tribunal considered a dispute as to whether a condition requiring a Transport Impact Assessment Report (TIAR) should be submitted prior to commencement of the buildings and/or works unless otherwise agreed in writing by Head, Transport for Victoria (Head TfV).
The condition was on a permit for development of a supermarket, 11 speciality retail shops and food and beverage outlets, a licensed premises (bottle shop) and associated car park and loading areas.
The Head, TfV refused to approve the TIAR because it was not satisfied with the information within the report.
Council’s submitted the words “unless otherwise agreed in writing by Head, Transport for Victoria” refer only to the temporal aspect of the clause. That is, the Head, TfV can agree in writing to an alternative time to “Prior to the commencement of the buildings and/or works’”. Further, Council submitted this was a threshold issue that removes the discretion of the Head, TfV, and the Tribunal on review, to vary the requirements in subclauses in the condition.
On the other hand, the Applicant submitted that both Head TfV and the Council failed to read the permit holistically. In summary, it submitted:
- it would make no sense to vary the timing of the completion of the TIAR, as you would not want it approved after commencement of buildings and works;
- the Head, TfV has always sought discretion in approving the TIAR but is now seeking to ‘pick and choose’ within the conditions, and it called no evidence nor supported its position with case law as to why the head clause should be read so narrowly; and
- if the condition was meant to be read literally, as not allowing discretion, then it is now internally inconsistent. The Head, TfV now does not seek condition 30(b)(v) relating to the four-way intersection at Calder Highway/Maiden Gully Road to be addressed in the TIAR. A mandatory reading of the condition would suggest it must be considered.
The Tribunal considered it would be illogical for the head clause to limit the Head, TfV’s discretion only to timing in condition 30 and it should be read in the broader context of the condition and wider planning permit. The TIAR (and functional layout plan in condition 30(c)) need to be approved prior to the commencement of buildings and/or works, and it would be surprising for the head clause to countenance the Head, TfV approving the TIAR and functional layout plans after buildings and works have commenced.
Further, the Tribunal considered it was apparent that consideration of the TIAR requires a degree of flexibility and discretion. In particular, it noted that condition 30(b)(v) requires consideration of the so called ‘fourth leg’ on the Calder Highway/Maiden Gully Road intersection, which is the ultimate extension of Carolyn Way northeast to the intersection to create a four-way signalised intersection. The TIAR outlines parameters agreed with the Head, TfV for the traffic analysis and states:
- The modelling should not include the 4-way signalised intersection of Maiden Gully Road/Calder Highway/Carolyn Way, as this is not a likely outcome within the determined timeframe.
The Tribunal noted the Head, TfV did not dispute this point. It stated that “This alone indicates discretion for the Head, TfV to vary the requirements in the permit condition. It is somewhat surprising that the Head, TfV is comfortable with discretion on this element, but continues to argue that overall it does not have discretion under the head clause of condition 30.”
The Tribunal approved the TIAR observing that it is not the role of the Applicant to address all local road network deficiencies, but to focus on the network impacts of the additional traffic generated, and traffic movements, from the use and development.
See also:
- Guide to Planning Appeals: Conditions > Traffic report
6. The perils in relying on AI
An objector’s AI search on Tribunal procedures nearly came unstuck in Bangholme Investments Pty Ltd v Greater Dandenong CC [2025] VCAT 290.
The objector received notice of the application for review which included a copy of the Tribunal’s order which stated that an objector must complete a Statement of Grounds if they wish to become a party to the proceeding and pay the relevant fee.
He did not lodge his statement of grounds and pay the prescribed fee by the date stated in the Tribunal’s order. He said that he did not properly understand the process and that he was expecting that he would receive further information from the Council about the Tribunal’s process.
Not having heard anything, he then filed a number of documents with the Tribunal which explained his position and his reasons for filing his statement of grounds out of time. These included his correspondence with the Council and the results of an artificial intelligence search (‘AI search’) he conducted. He said the AI search inferred that the Council was supposed to notify objectors.
However, the Tribunal noted the result of the AI search was plainly incorrect. The objector had already received notification of the application from the Applicant including the information he needed about the steps he was required to take to become a party to the application. In hindsight, the Tribunal noted the objector readily accepted the proposition that reading the documentation provided to him rather than conducting AI searches would have been a preferable course.
Notwithstanding the objector’s misguided approach in finding information about the Tribunal’s procedures, the Tribunal found that it was broadly desirable that he be joined as a party on the basis he lives in the local area and has an interest in the regularisation of the use of the land in a prominent location in this area. There was already one objector to the proceeding.
The Tribunal considered the objector fortunate in that there is already a proceeding on foot and that this is an application for review of the failure of the Responsible Authority to decide an application. If this had been an application under section 82 of the Planning and Environment Act 1987 (P&E Act) for a review of a notice of decision to grant a permit the considerations would have been different. It is likely that a permit would have issued before he had lodged his application. Even if it had not issued, it is likely that the Tribunal would have required further persuasion to look past the lateness of his engagement with the process where the Applicant would otherwise have an expectation that it would be granted a permit but for a late application. That is, however, not this case.
See also:
- Guide to Planning Appeals: Appeals > Late applications
6. Whether dwelling generally in accordance with Development Plan – the implications of approving an earlier subdivision
A relatively straightforward application to construct a dwelling and remove native vegetation in Ritchie v Bass Coast SC [2025] VCAT 292 raised complex legal issues as to whether conditions on a subdivision permit are spent; whether conditions on a subdivision permit survive registration of a plan of subdivision; and whether the proposal is generally in accordance with approved Development Plan.
The subject land comprises two lots separated by a road. Total land area is 3.909ha. The land is in the Rural Living Zone and in a Development Plan Overlay (DPO).
Council refused the application because the proposal is not generally in accordance with the Development Plan and is inconsistent with Clause 3.0 of Schedule 1 of the DPO in that a wetlands area must be developed on the land in accordance with a program to the satisfaction of the responsible authority.
The Applicant challenged the Council’s grounds of refusal. In addition, the Applicant submitted that the Council’s role in the approval of creation of the land (through approving the plan of subdivision) prevents the Council from now asserting that the proposal is inconsistent with DPO1 and the Development Plan.
On the question as to whether the proposal is generally in accordance with theDevelopment Plan, the Tribunal found that in the specific circumstances of the case, where the Council has certified a plan of subdivision that, on its face appears to not be generally in accordance with the Development Plan, the fact of certification of that subdivision plan by the Council means that the subdivision plan must be generally in accordance with the approved development (editor emphasis). By logical extension, accordingly, it was found that:
- the proposal does not need to contain a reserve or wetlands area on the land in order for it to be generally in accordance with the Development Plan; and
- the proposal to construct a dwelling (including an outbuilding) and to remove native vegetation is generally in accordance with the Development Plan.
As to whether the conditions on a subdivision permit survived registration of a plan of subdivision and whether the conditions of subdivision are spent, the Tribunal found that, on the basis the certificate of title for the land does not set aside or demarcate the wetlands area as a reserve or common property, nor is the certificate of title subject to any encumbrance or restriction requiring the land to be developed with a wetlands area:
- Council cannot now rely on the conditions of the 2002 Permit to impose an encumbrance or impediment on the land in the form of a requirement to develop a wetlands on the land, because this was not imposed by the Plan of Subdivision through which the title for the land issued; and
- Notwithstanding what might have been the intention of the Council at one time in relation to the creation of common property or a reserve in this subdivisional area, given what has arisen as a consequence of the registration of the various plans of subdivision, such intentions are unrealised. Nor, it would seem, has the Council taken any other steps to rectify this situation in the last 23 years (i.e. since the issue of the 2002 Permit).
In addressing the conditions of subdivision had survived or were spent, having regard to a number of authorities, including Benedetti v Moonee Valley City Council (No 1) [2005] VSC 434, Manderson v Wright [2016] VSC 677, Khan v VCAT [2018] VSCA 351, Zaric & Ors v City of Greater Dandenong [2022] VSC 680 and Hillpalm Pty Ltd v Heaven’s Door Pty Ltd [2004] HCA 59, the Tribunal considered that the cases relied upon stand for the proposition that, broadly speaking, conditions on a subdivision permit that either require action prior to the certification of a plan of subdivision or the issue of a statement of compliance, or otherwise are related to the carrying out of the subdivision works themselves, will not survive the registration of the plan of subdivision. This is because the subject matter of those conditions will be spent once the certification or statement of compliance is issued, given the issue of those approvals by a council are confirmation that the council is satisfied that the associated requirements of the Subdivision Act are met.
Practitioners are encouraged to read the findings of the Tribunal in this proceeding having regard to the particular circumstances of the case.