VCAT Volume 12 No 7

1. Here’s looking at you – dealing with objectors’ overlooking concerns

Two recent cases highlight the concern some neighbours have about overlooking and the effect on their amenity. It comes at a time with the approval of Amendment VC267, which has removed bedroom windows from the meaning of habitable room windows meaning that overlooking from bedroom windows is no longer a relevant privacy consideration.

In James v Darebin CC [2025] VCAT 99, the Tribunal determined to vary Council’s decision to address the objector’s concerns on overlooking. It determined to increase the height of the common boundary fence and to delete the notation that the screening of a habitable room window have a maximum 25% transparency (so as to avoid confusion and inconsistency with the design detail of the louvre screen shown on plan sheet TP05).

It may be recalled that the matter was previously considered in a preliminary hearing James v Darebin CC [2024] VCAT 805 (editorial comment VCAT Vol 11 No 16), where the Tribunal refused Council’s application that the objector’s appeal be summarily dismissed pursuant to section 75 of the Victorian Civil and Administrative Act 1998 (VCAT Act) on the basis that the codified standard of B22 (overlooking) was not met.

In the earlier preliminary hearing, the Tribunal invited the Responsible Authority to reconsider its decision in this proceeding pursuant to section 51A(1) of the VCAT Act. Whilst Council did reconsider its decision, it did not change its position about the acceptability of the extent of overlooking from the proposed development.

The Tribunal noted with some consternation that in reconsidering its decision the Council failed to explicitly reference the decision guidelines at Clause 55.04-6, nor did it include an analysis of the proposal by considering the ‘existing extent of overlooking into the secluded private open space’ (of the objector’s property) as described in the third decision guideline. Further, no express reference was made to whether habitable room windows and the deck are located and designed to avoid the direct views in paragraph 1 of standard B22.

The Tribunal also stated that it was regrettable that Council officers did not undertake an inspection of the subject property and the objector’s backyard.

As to the merits about addressing the objector’s concerns about overlooking, the Tribunal considered that the proposed 1.8m high fence relied upon to obscure views into the existing secluded private open space (SPOS) would have a relative height of 1.37m and 1.47m above the Finished Floor Level (FFL) of the two indoor rooms and deck at ground level respectively. Whilst this would achieve good levels of amenity and internal daylight for future occupants of the development, it would result in a significant increase in available views into the objector’s SPOS, particularly from proposed indoor areas, compared to those presently available above the existing (average) 1.66m boundary fence height.

It therefore required that a boundary fence constructed to a height of 2.1m above existing ground level, which would have a relative height of at least 1.67m above FFL of indoor areas and 1.77m above the deck.

With respect to overlooking from the first floor bedroom, the Tribunal noted the louvre treatment to the window is to have 80mm gaps between 20mm wide louvre slats, so that as a proportion of the screened face of the window, the openings between the louvres results in transparency of 80%. Accordingly, the Tribunal considered the proposed louvre screen does not meet the prescribed 25% transparency requirements of a ‘fixed external screen’ (though noted this only applies to the management of direct views into a habitable room window, but not SPOS, of an existing dwelling).

The Tribunal did not support the use of obscure glazing to this window, stating that the effect on internal amenity would be oppressive and outweigh any additional benefits for the objector’s amenity and privacy.

In Tran v Darebin CC [2025] VCAT 119, the Tribunal at a practice day hearing refused an application lodged by the permit applicant that an objector’s concerns on overlooking be summarily dismissed.

The Council had issued a Notice of Decision for the use and development of a two storey mixed use building comprised of three dwellings and a retail premises (take-away and food and drink premises) and a reduction in the statutory car parking requirement.

The subject land is included in the Commercial 1 Zone (C1Z) and Development Contributions Plan Overlay (DCPO). The Applicant resides on the opposite corner of the review site, which is included in the General Residential Zone 2 (GRZ2).

The permit applicant sought a practice day hearing on the basis the applicant for review has no grounds of appeal given the proposal is fully compliant with the relevant standard.

However, it was common ground at the hearing that:

  • Clause 55 of the planning scheme does not specify that it applies to land included in the C1Z;
  • there are decision guidelines in Clause 34.01-9 in the C1Z that the responsible authority must consider for a permit application including, as appropriate, namely:
    • ‘Consideration of overlooking and overshadowing as a result of building or works affecting adjoining land in a General Residential Zone…’;
    • The objectives, standards and decision guidelines of Clause 54 and Clause 55….’; and
  • the issue of whether the overlooking objective in clause 55 is met is relevant to the exercise of discretion, but it is a question of weight for consideration at the hearing on the merits.

In refusing to summarily dismiss the application, the Tribunal stated:

In light of the submissions, concession made and lack of detail, I do not consider it is appropriate to strike out or summarily dismiss the application for review.

The decision guidelines in clause 34.01-8 of the C1Z set out the matters which must be considered, as appropriate. The parties agree that the applicant’s concerns / objection relating to overlooking (and consequent privacy impacts) remain a matter for debate at the hearing on the merits when VCAT considers whether to uphold the responsible authority’s decision to grant a permit. This will include what weight should be given to the respondent’s proposition that the standard for overlooking set out in clause 55 of the planning scheme has been exceeded for the applicant’s property. These are matters for the Tribunal comprised to consider the application for review at the main hearing. [26-27]

The matter is to proceed to a compulsory conference.

As the objector in this proceeding is mainly concerned about overlooking from balconies rather than bedrooms, it would appear that despite the approval of VC267 the objector’s concerns remain relevant.

It is also worth noting that the ‘deemed to comply’ Clause 55 standards do not appear to apply to the C1Z decision guidelines. The decision guidelines merely require consideration of “The objectives, standards and decision guidelines of Clause 54 and Clause 55.” Reference to Clause 57 has been added following approval of VC267.

See also:

  • Guide to Planning Appeals: Amenity > Overlooking

2. Cancellation of permits

Two recent cases highlight circumstances where it may be appropriate to cancel a permit and the relevant statutory provisions that apply.

In the first case, Miles v Hobsons Bay CC (Red Dot) [2025] VCAT 151, the Tribunal considered a request from an adjoining property owner that a permit be cancelled on the basis that she had not been notified of the application. Council conceded that it had failed to notify the adjoining property owner of the application.

The permit applicant lodged a fresh permit application and notice was duly given to the adjoining property owner who lodged an objection against the grant of a permit. The Council issued a Notice of Decision to Grant a Permit that included a condition that the earlier permit be cancelled.

The adjoining property owner sought a review of the decision to grant a permit and also requested the Tribunal to cancel the 2023 permit. The Tribunal approved the permit which included the cancellation condition.

The adjoining property owner submitted that she was forced to request that the Tribunal cancel the 2023 permit because neither the Council nor the permit applicant made a request to cancel the 2023 permit. Council then sought the agreement of the adjoining property owner and the permit applicant to either request the Tribunal to determine the proceeding on the basis of documents (ie without a hearing) or to consent to the Tribunal making an order to cancel the 2023 permit and to vacate the hearing. However, the adjoining property owner did not consent to either course of action and the Tribunal was therefore required to hear and determine the proceeding.

In assessing the adjoining property owner’s request, the Tribunal considered whether there had been a ‘material mis-statement or concealment of fact in relation to the application for the permit’ (‘mis-statement ground’) pursuant to section 89(1)(b)(i) of the Planning and Environment Act 1987 (P&E Act) and ‘material mistake in relation to the grant of the permit’ (‘mistake ground’) pursuant to section 89(1)(b)(iii) of the P&E Act.

Alleged mis-statements and mistakes included errors in the calculation of the garden area; concealment of the sustainability report forming part of the application documents because it was missing from the online information; a mis-statement in the area of secluded private open space; errors in the Council’s delegate’s report for the 2024 permit because the calculations in private open space in dwellings 2 and 3 differ from those in the delegate’s report for the 2023 permit; errors in the area of the subject land and total building floor area in the sustainability report that accompanied the application for the 2023 permit; and building over an easement.

The Tribunal concluded that the 2023 permit could not be cancelled on any of the mis-statement grounds or the mistake grounds.

Council submitted that even if the notice grounds, mis-statement grounds or mistake grounds did not justify cancelling the 2023 permit, the 2023 permit should nevertheless be cancelled because section 87(1)(d) of the P&E Act provides:

The Tribunal may cancel or amend any permit if it considers that there has been—

…

(d) any material change of circumstances which has occurred since the grant of the permit; ..

However, the Tribunal did not think this approach was legally possible. It stated:

In my opinion, the Tribunal may not cancel a permit on the change of circumstances ground on a request by a person under section 89.

The Council’s submission errs in not reading section 87 of the PE Act as a whole. Section 87(3) provides:

The Tribunal may cancel or amend a permit at the request of—

(a) the responsible authority; or

(b) any person under section 89; or

(c) a referral authority; or

(d) the owner or occupier of the land concerned; or

(e) any person who is entitled to use or develop the land concerned.

I construe section 87(3) as meaning that all the grounds in section 87(1) may be relied by the persons specified in paragraphs (a), (c), (d) and (e) in section 87(3), but not by the person specified in paragraph (b). The legislature has limited the grounds available to a person under section 89 to the grounds in section 89(1)(a) or (b). Those grounds do not include the change of circumstances ground.

The Tribunal noted that the Council or the permit applicant could apply under section 87 to request cancellation of the 2023 permit on the change of circumstances ground, but that is not the request that was subject to determination in this proceeding.

The Tribunal stated in its red dot summary:

The decision is a reminder to responsible authorities and those intending to act on a permit that, if the permit includes a cancellation condition, a request by a person under section 89 to cancel another permit on section 87(1)(d) grounds will not succeed. The Tribunal may only cancel a permit on those grounds by one of the persons specified in section 87(3)(a), (c), (d) or (e).

In the second case, One.Be Productions Pty Ltd v Merri-bek CC [2025] VCAT 171, the Responsible Authority imposed a condition on a permit requiring the cancellation of an earlier permit that had been approved for the site. This can be done pursuant to section 62(2)(d) of the P&E Act.

Notwithstanding the power conferred on responsible authorities under the above section of the P&E Act, the Tribunal noted that the list of matters under section 87(1) of the P&E Act that limit the Tribunal’s power to cancel or amend a permit does not expressly refer to a condition on a permit imposed under section 62(2)(d). However, the Tribunal was satisfied that the issue of the 2024 permit containing condition 40 is a material change of circumstance since the grant of the 2019 permit and that as a result the 2019 permit should be cancelled. 

See also:

  • Guide to Planning Appeals: Permit > Cancellation of permit > cancellation of earlier permits

3. Can a tenant amend a section 173 Agreement?

In Luxor Corporation Pty Ltd v Brimbank CC [2025] VCAT 180, the owners of land subject to a section 173 Agreement sought declarations pursuant to sections 149A and 149B of the Planning and Environment Act 1987 (P&E Act) that the purported approval by the Council to vary the agreement was invalid and of no effect.

The variation to the Agreement was sought by the tenant to operate a function centre from the land. The tenant was the respondent in the VCAT proceeding.

The central dispute addressed by the Tribunal was the meaning of ‘owner’ in the section 173 Agreement. The Applicant contended that ‘owner’ as it is used in the s 173 Agreement means the registered proprietor of the land, whereas the Respondent and Council contended that ‘owner’ includes the occupier of the land, in this case the Respondent as the tenant under the lease.

Given the recitals of the Agreement, the Tribunal found that reference to ‘owner’ in the clauses of the Agreement means the registered proprietor. Owner cannot have one meaning in one clause and another meaning in another clause, it must be given a consistent meaning throughout the Agreement.

The Tribunal also found, having regard to TPSC Pty Ltd v Kingston City Council [2018] VSC 313 and Secretary to the Department of Economic Development, Jobs, Transport and Resources v MG Pastoral Company Pty Ltd [2016] VSC 187, the P&E Act is an important contextual consideration for the Agreement because it is the statutory scheme from which the agreement emanates. Notably, agreements made under section 173 of the P&E Act can only be entered into by an owner of land or a person in anticipation of becoming an owner of the land.

The Tribunal granted the declarations sought on the basis the variation to the Agreement had not been sought by the owner and therefore Council’s purported decision was invalid and of no effect.

See also:

  • Guide to Planning Appeals: Section 173 Agreements > Contractual interpretations

4. Is it appropriate to allow two childcare centres on adjoining sites?

In Singh v Casey CC [2025] VCAT 186, an owner of a childcare centre to be constructed on an adjoining site to a proposed childcare centre challenged Council’s decision to approve the proposal.

The Applicant was critical of Council’s assessment of the proposed child care centre on the basis that it has not considered the impact of having two child care centres operating on adjoining sites, and that two child care centres will create an unacceptable cumulative impact.

Council’s local policy on child care centres contains a number of locational criteria in determining the appropriateness of this use in residential areas. One criterion is that larger centres that cater for in excess of 40 children abut or have direct access to a road in a road zone.

As the proposed child care centre will have more than 40 children, the Applicant submitted that the child care centre should not be proposed on the subject site, which is designated as a collector road. It was further submitted that when combined with the approved child care centre on the adjoining property, the number of children is five times that referred to by Clause 22.02 of the scheme.

In dismissing the objector’s concerns, the Tribunal stated:

Notwithstanding the above performance standard directs child care centres with more than 40 children to sites with access to the road zone, I find that the site’s location on a collector road instead of a road zone will maintain the orderly planning of the area. I have been assisted by the evidence of Mr Fairlie that confirms that the capacity of Huon Park Drive is one that can accommodate a non-residential use and that the intersection with South Gippsland Highway will facilitate safe traffic movements.

In relation to other locational attributes, I am persuaded that the location of the proposed child care centre adjacent to another approved child care centre results in an appropriate town planning outcome. The co-location of the two child care centres will minimise impact to residential interfaces whilst forming a small hub with the parkland across the road. Despite the suggestion of the applicant, relevant policy does not suggest that a school should or must be provided in this small hub.

Notably, this case has not raised potential noise impacts to the nearby residential properties and the application has included acoustic fencing to mitigate against noise disruption to nearby residential properties. [25-27]

The Tribunal also dismissed the objector’s concerns that no information or analysis had occurred in relation to whether the proposed child care centre fulfils a demonstrated local community need, as required by Clause 22.02 of the scheme.

See also:

  • Guide to Planning Appeals: Childcare centres > Adjoining sites

5. Does a failure to pay an application fee affect the ability to lodge an application for review?

In 210 Fussell Street Pty Ltd v Ballarat CC (Red Dot) [2025] VCAT 199, an issue arose at a practice day hearing as to whether the application for review lodged under section 79 (failure to decide) of the Planning and Environment Act 1987 (P&E Act) had been lodged prematurely.

After the application was lodged, the Council sent a Request for Further Information (RFI) letter that also identified a number of concerns with the proposal.

A key issue in the proceeding was whether the RFI was given to the Applicant in the prescribed time. If it was, then the application for review was lodged prematurely because the responsible authority had not in fact failed to make a decision for the purposes of section 79 of the P&E Act.

Council contended that the prescribed time for the purposes of making a request for information under section 54(1) of the P&E Act is to be calculated from the date that a permit application is ‘validly made’ to the responsible authority and this event only occurs on the date that a permit applicant provides all of the matters listed in section 47(1) of the P&E Act to the responsible authority. This conclusion is, in turn, based on classification of the requirements in section 47(1) of the P&E Act as ‘mandatory’ and the submission that as Parliament has said that the prescribed fee (amongst other things) must accompany a permit application, failure to comply with this mandatory requirement means that the prescribed time under regulation 18 does not commence until satisfaction with all the requirements of section 47(1) of the P&E Act.

In dismissing Council’s contentions, the Tribunal held:

  • The interpretation contended for by the Council does not give effect to the language of both regulations 18 and 32 of the Planning and Environment Regulations 2015. The relevant time periods in regulation 18 and 32 are both calculated from ‘the day on which the responsible authority receives the application’. Receipt of an application is a different thing to ‘compliance with all of the requirements of section 47(1) of the P&E Act’ or ‘receipt of a validly made application under section 47(1) of the P&E Act’.
  • The language of section 47(1) of the P&E Act makes it clear that there is a distinction between what constitutes the application itself and those things that are required to accompany the application. This finding is consistent with Salvo Property Pty Ltd v Melbourne CC [2019] VCAT 1362 and ML Design v Boroondara CC (Red Dot) [2005] VCAT 2088.
  • The task of the Tribunal is not to simply classify a provision as being either ‘mandatory’, ‘obligatory’ or ‘directory’ but it is to also then consider what are the consequences of a failure to comply with such a requirement. Classifying the requirements of section 47(1) of the P&E Act as ‘mandatory’ as has been done by the responsible authority in this matter sidetracks the true enquiry to be made. This is because that classification alone is not the complete answer to whether an application that does not comply with the requirements of section 47(1) of the P&E Act somehow nullifies or invalidates the making of an application by a permit applicant such that no application was in fact received by the responsible authority. The Tribunal referred to Tasker and Others v Fullwood and Others [1978] 1 NSWLR 20 and Hall v Minister for Immigration & Multicultural Affairs [2000] FCA 415 in addressing this matter.

On the facts of the matter, the Tribunal found that the RFI was not given to the Applicant in the time prescribed under regulation 18 of the P&E Regulations and is therefore not a request for information given under section 54(1) of the P&E Act.

The Tribunal’s decision in this matter is consistent with previous authorities that have addressed this type of issue. It is important that responsible authorities are aware that despite concerns whether all administrative steps with the lodgement of an application have been followed, it is the language of the legislation and regulations that determines whether an application is validly made.

See also:

  • Guide to Planning Appeals: Permit > Application for permit > Further information > Time limits

6. Are separate enforcement orders required for alleged breaches of a planning scheme on adjoining land?

In Casey CC v Banks [2025] VCAT 126, the Council had sought an enforcement order in relation to two adjoining properties. One property is in the Low Density Residential Zone (LDRZ) and was allegedly being used for the storage and repairs to motor vehicles and the other property is in the Green Wedge Zone (GWZ) and was allegedly being used for the storage of motor vehicles. Each property is in separate ownership.

After the application was lodged with the Tribunal, the Tribunal emailed the Council requesting it to lodge two separate applications for enforcement order.

Council resisted the request to lodge two separate applications and submitted that the Tribunal does not have any discretion not to ‘accept’ the application as lodged. It referred to a number of cases to support its submissions.

Whilst the Tribunal accepted there might be instances where an application for enforcement order is lodged in respect of a plural, rather than a singular, parcel of land, landowner, occupier, issue or remedy, it considered in the present situation there is not a commonality of event that is the breach. It stated:

Where an enforcement order is issued in relation to multiple parcels of land that are owned by the same person/respondent and constitute one planning unit, the drafting of a clear and easily understood enforcement order will need to occur cognisant of the different parcels of land involved. The reasons for this include that each parcel of land might be separately disposed of in the future, with the enforcement order still in place and binding the future owner/occupier of that land. I accept that this is something that might be able to be addressed with careful drafting.

However, where an enforcement order is issued in relation to multiple parcels of land that form one planning unit but which are owned by different landowners, this drafting might become far more challenging. This is because with different landowners comes:

    1. an increased potential for different respondents who might each have different obligations under different orders made against their different parcels of land; or
    2. the prospect that one respondent who is found to be responsible for the breach will need to access other land that they do not own but which is involved in the breach, in order to comply with the enforcement orders. [38-39]

The Tribunal’s Order required a second application for enforcement order to deal with same should the Council wish to continue the matter.

See also:

  • Guide to Planning Appeals: Enforcement Order > Separate parcels of land

7. How to proceed with a consent order on a Residential Noise Improvement Notice 

Section 172 of the Environment Protection Act 2017 provides:

A council may issue a person with a residential noise improvement notice if the council reasonably believes that the person— 

(a) has contravened a provision of this Part or the regulations relating to the emission of noise from residential premises in circumstances that make it likely that the contravention is continuing or will re-occur; or

(b) is likely to contravene a provision of this Part or the regulations relating to the emission of noise from residential premises.

In Lang v Merri-bek CC [2025] VCAT 205, the Council issued a Residential Noise Improvement Notice (RNIN) due to excessive noise from amplified music. The residents of the subject land are musicians, including students, regular musicians and hobbyists.

At the hearing, the parties sought consent orders from the Tribunal following negotiations on addressing the amount and timing of the noise. However, the Tribunal expressed concern about the ambit of section 51(2)(d) of the Victorian Civil and Administrative Act 1998 (VCAT Act) to impose the directions and recommendation sought by the parties.

The Tribunal considered the preferable way forward is for the Tribunal to set aside the decision to issue the RNIN and to remit the matter back to the Council using section 51(2)(d) of the VCAT Act. It stated:

Our key concern in relation to the ability of the Tribunal to make the orders sought is the request that the Tribunal direct the council to make a particular decision in the future.

In asking the Tribunal to remit the proceedings with a direction that council must make a particular decision in accordance with the consent order, in effect the parties are asking the Tribunal to fetter the discretion of the council, requiring the council to issue a new notice on the stated terms. Under the first direction, the council is not left with any discretion and cannot choose not to issue the notice, or not to issue the notice on those terms, if it considered that was the appropriate course of action in the circumstances at that time. 

Whilst we are mindful that the first direction forms part of the consent position reached by the parties, we do not have to give effect to the proposed consent order in full, noting that ultimately this order is being issued by the Tribunal and the Tribunal must be satisfied that the order is appropriate.

Notwithstanding the silence of the VCAT Act as to the ambit of s 51(2)(d) of the VCAT Act, we regard it to be an important consideration that any decision accords with principles of administrative law, including that the Tribunal should not fetter the discretion of another statutory decision-maker in a future decision that is yet to be made. As the first proposed direction would do that, we are not prepared to impose that direction.

We observe that in other instances where the Tribunal has utilised the power in s 51(2)(d) of the VCAT Act, it has done so either in the absence of directions or recommendations, or, imposed directions for certain documents or relevant issues to be taken into account in the decision-maker’s decision-making process but not that a particular outcome eventuate from the decision-maker’s future assessment (Tribunal emphasis) [30-34]

The Tribunal noted that the cases referred to by the parties ordered remittal without directions or recommendations to the decision-maker. Such cases include Denver Estate v Hepburn SC [2022] VCAT 388 and AG Dennis Pty Ltd v Department Head DEDJTR [2015] VCAT 1753.

Notwithstanding the above cases, the Tribunal noted that in Moora Moora Pty Ltd v PrimeSafe [2013] VCAT 997 the Tribunal ordered remittal with an express direction that an approval for a licence be issued and not contain a particular condition.

The Tribunal regarded Moora Moora to turn on its particular facts and context, which are distinguishable from the current proceeding, particularly given in the current proceeding there is agreement between the parties as to the nature of the problem and that the Applicant should undertake certain measures to address the problem, subject to further investigation being conducted to modify or change those measures.

Accordingly, the Tribunal was not prepared to make the consent order whereby the decision maker must issue a new notice in the form proposed. Instead, it included the terms of the proposed consent orders in its written reasons so as a record what the parties agreed should occur. It considered that this ‘recording’ of the parties’ proposed consent position should provide comfort to each party as to how they have openly agreed this situation should proceed.

See also:

  • Guide to Planning Appeals: Environment Protection Act 2017 > Residential Noise Improvement Notice, Appeals > Consent Order