VCAT Volume 12 No 5
1. Discretionary height controls: not a starting point but a desired outcome
In Derby Street Developer Pty Ltd v Yarra CC [2024] VCAT 1186, it was proposed to construct a seven storey building on land that is subject to a Design and Development Overlay (DDO) and Heritage Overlay (HO). The Tribunal’s decision makes some interesting commentary on the approach to discretionary height controls in Victoria’s performance based planning system.
The subject site and three other sites in the area are affected by DDO23, which was gazetted after the application was lodged. DDO23 replaced an interim DDO and:
- changed the preferred maximum building height from 20m to 14m; and
- changed the preferred street wall height from 14m to 11m.
In addition, the controls for properties in the Heritage Overlay were strengthened.
After the gazettal of the planning scheme amendment, the Permit Applicant amended plans that removed the eighth level and included an angled setback to the seventh level (the new ‘top level’) to reduce its impact in views from the east.
Council supported the development subject to a condition to delete two levels. Council’s heritage advisor recommended deleting four storeys.
Council submitted that the preferred metrics ‘mean something’ and should be followed generally, albeit not rigorously, given that they reflect the vision for the area. It considered that these metrics require a conservative response to adjacent and nearby heritage-listed properties.
The objector applicant relied on the vision established through DDO23’s preferred heights and massing to maintain some amenity to his property. He considered that DDO23’s preferred heights and massing strikes the balance between the conflicting objectives of urban consolidation, heritage and residential amenity.
The Permit Applicant submitted that DDO23 requires a building to respond to its design objectives rather than its preferred metrics. It considered that the Council has wrongfully applied the preferred metrics as if they were mandatory, which they are not.
Further, the Permit Applicant noted that the design objectives have not changed between the interim and permanent versions of DDO23. The implication is that this must ‘mean something’ about the preferred metrics.
Reflecting on the above submissions, the Tribunal stated:
We consider that all of the parties’ submissions are persuasive to some degree. We agree with the council that the preferred metrics must ‘mean something’, and we give them considerable weight. To this end, we acknowledge the Tribunal’s finding in 61 Victoria Parade Pty Ltd v Yarra CC [2022] VCAT 826 that:
[137] The preferred building height is not a ‘starting point’, it is a desired outcome that has statutory recognition in the provisions of the Planning Scheme. Preferred building heights in Design and Development Overlays (or other provisions of the Planning Scheme, such as schedules to zones or other overlays) should not be departed from lightly. They exist for a reason and, as is the case here with the VPBFF, are frequently underpinned by strategic analysis. They create an expectation for responsible authorities, applicants and the community of the built form which is expected to emerge over time to achieve the envisaged urban structure.
[138] If the preferred building height is to be exceeded there needs to be sufficient justification to do so. Without this, the ability to realise the vision which led to their introduction could, over time, be incrementally eroded or lost. This outcome should be avoided.
Separately, we agree with the applicant that a building that meets DDO23’s preferred metrics is likely to strike the balance that he refers to. This would not come as a surprise to the parties as we initiated a discussion based on this proposition during the hearing.
Finally, we agree with the respondent that DDO23 allows for variations to the preferred metrics if we are satisfied that its design objectives, amongst other things, are met.
This situation, where all submissions are persuasive to some degree, reflects the tension in the performance-based Victorian Planning system. The system encourages good design through requiring a proposal to meet design objectives but also attempts to provide certainty through preferred metrics. This approach of certainty with flexibility is embedded in provisions like DDO23. [34-37]
The Tribunal was satisfied that the building meets DDO23’s design objectives and that variations to other requirements of DDO23 are justified. It considered that:
- the preferred metrics of DDO23 create a building envelope of a three-storey base and a recessive fourth floor. In other words, the preferred metrics promote a relatively low-scale building in the overall context of DDO23; and
- the building will not adversely affect the overall urban design vision for the DDO23 area.
The Tribunal’s analysis on this matter as it pertains to discretionary height controls is similar to reasons in other decisions, including 61 Victoria Parade Pty Ltd v Yarra CC as quoted above, as well as Forza Capital AFT Forza Grosvenor Street Fund v Yarra CC [2022] VCAT 128, Oxford Mason Pty Ltd v Yarra CC [2022] VCAT 170 and DPG Management Services Pty Ltd v Yarra CC [2022] VCAT 52. Such an approach clearly states that discretionary height controls are not the starting point but a desired outcome.
See also:
- Guide to Planning Appeals: Height > Exercise of discretion
2. In the line of sight: whether a proposed dwelling should be relocated to mitigate risk from a shooting range
In Thrum v Greater Shepparton CC [2024] VCAT 1191, the Council approved a Notice of Decision to Grant a Permit for a dwelling on land in the Farming Zone and affected by a Land Subject to Inundation Overlay (LSIO). The approval included a condition that the dwelling be relocated outside the part of the land (which is almost all of it) in the LSIO. Council officers had recommended refusal of the application.
An objection to the proposal had been received from a nearby rifle club, which is located approximately 1.5 kilometres of the proposed dwelling site. The rifle club was concerned that the proposed dwelling site is within the potential line of fire, though submitted that the original positioning of the dwelling would not have been a problem.
Council called expert evidence who opined that the dwelling would be in a dangerous position due to the potential for ricocheting to occur, due to human error such as accidental discharge or an error in judgement when using a rifle. He considered that it would be possible for a projectile to pass over the stop butt into the ‘old range danger fallout area’ which is the area of the subject land in which the dwelling is proposed to be located. He also referred to trespassers using the rifle club in an incorrect and unlawful manner.
The Tribunal considered that the proposed dwelling’s location in the direct line of fire of the rifle range is relevant and that the Tribunal would fall into legal error if it treated that fact as if it were irrelevant. The key issue, then, is to assess what weight it gives to risk from use of the rifle club. The Tribunal stated:
It is the case that the decision guidelines of the FZ1 include whether the proposal is compatible with adjoining and nearby land uses, which is a relevant consideration. A similar strategy is included in clause 13.01-7S of the Scheme, the objective of which is to protect community amenity, human health and safety while facilitating uses with potential adverse off-site impacts.
As noted by Glossop, any potential land use conflict has been removed by the works undertaken by the RC and the buffer now being located completely within its property.
The council, and the Tribunal on review, is directed to consider the planning merits of an application and the acceptability of condition 1(a) from a planning perspective.
There is nothing in the planning controls or policies applying to the subject land that restricts the use of the land because of the activities of the RC. It is the responsibility of the RC to manage its activities so that they do not impact other properties. The relevant authority, Victoria Police, has confirmed that the RC land can be used in accordance with the conditions of its Certificate, without requiring overshoot permissions from the owner of the subject land.
Of course, all risk cannot be removed from a shooting range. Just as all risk cannot be removed from an amusement park or an industrial operation. The way to manage this, however, is to either require the use to cease, or not allow it to commence, or rely on the relevant authority to impose appropriate conditions to mitigate that risk. If it cannot be appropriately mitigated, the use should not proceed. It should not affect the use and development of surrounding land. [48-52]
The Tribunal deleted the condition requiring the relocation of the dwelling.
See also:
- Guide to Planning Appeals: Risk from a shooting range
3. Should a Supreme Court trial concerning the law of nuisance of a wind farm be split?
Eleven plaintiffs brought claims of nuisance in respect of ‘air pressure waves (perceived as sound, infrasound or vibration)’ allegedly emitted by turbines forming part of the Stockyard Hill Wind Farm.
The operator of the wind farm sought a split of the hearing pursuant to Rule 47.04 of the Supreme Court Rules, which provides:
47.04 Separate trial of question
The Court may order that–
(a) any question in a proceeding be tried before, at or after the trial of the proceeding, and may state the question or give directions as to the manner in which it shall be stated;
(b) different questions be tried at different times or places or by different modes of trial.
However, in Dridan v Stockyard Hill Wind Farm Pty Ltd [2024] VSC 773, the Court dismissed the application, noting that the discretion to order a split trial should be exercised ‘with great caution and only in a clear case’.
The Court found that:
- It could not be said with confidence at this early stage that the efficiencies to be gained from the split are beyond question. On the contrary, there appears to be a very real risk, by reason of the overlap in issues and evidence in respect of the questions of liability and relief, that there will be considerable inefficiencies as a result of the split.
- The uncertainty faced by the defendants in framing appropriate injunctive relief in the absence of findings of liability on some or all of the plaintiffs’ claims is either especially unusual, or insurmountably unfair, was not accepted. Further, the Court did not accept that the defendants will ultimately need to deal with innumerable permutations in outcome. The proceeding is at an early stage, with discovery in progress and the filing of lay and expert evidence still some time away.
See also:
- Guide to Planning Appeals: Amenity > Law of nuisance and amenity
4. Should a law of nuisance against a gold mine proceed to trial?
In another case involving the law of nuisance, McDonald v Fosterville Gold Mine [2025] VSC 1, two residents about three kilometers from the mine, claim nuisance from excessive noise.
The Defendant, the operator of the mine, claim that noise emitted by its operations is not unreasonable, as at all material times its operations were carried out in accordance with the terms of the permits and approvals granted by the relevant regulatory authorities. They therefore made an application for summary judgment pursuant to section 62 of the Civil Procedure Act 2010 (CPA) and/or a stay of the proceeding pursuant to reg 23.01 of the Supreme Court (General Civil Procedure) Rules 2015 on the basis that the Plaintiffs’ claims in this proceeding have no real prospect of success and/or are an abuse of process.
The Court concluded that the Plaintiffs’ claims in this proceeding should be permitted to proceed to trial. While it accepted that presently, the preponderance of the objective evidence suggests that the Plaintiffs’ case has some hurdles to overcome, in the current application, what the Defendant has effectively asked the Court to do is conduct a desk-top review of the expert evidence in substitution for a trial in order to conclude, on a summary basis, that the Plaintiffs’ claims have no real prospect of success, and there is no other reason why the proceeding should proceed to trial.
The Court considered the Defendant’s approach is contrary to settled authority. In Lysaght v Building Solutions Pty Ltd [2013] VSCA 158, the Court held that while the test in section 63 of the CPA is more liberal than the ‘hopeless’, or ‘bound to fail’ test that previously applied, the Court also said that ‘…it must be borne in mind that the power to terminate proceedings summarily should be exercised with caution and this should not be exercised unless it is clear that there is no real question to be tried’.
The Court also referred to the relatively recent decision of Uren v Bald Hill Wind Farm Pty Ltd [2022] VSC 145, which had some parallels with the current proceeding.
See also:
- Guide to Planning Appeals: Amenity > Law of nuisance and amenity
5. Whether a non-objector should be joined to a proceeding: the need to find the right route
In Hatten v Greater Geelong CC [2024] VCAT 1211, in an unfortunate scenario, an adjoining landowner’s work email blocked an email from Council regarding a proposed two dwelling development. How could the landowner get back in the game and become a party to the VCAT proceeding that had been brought by other objecting landowners?
The adjoining landowner sought leave pursuant to section 60(1)(b) of the Victorian Civil and Administrative Tribunal Act 1998 (VCAT Act) to be included as a joint applicant for review.
In Luther v Yarra Ranges SC [2008] VCAT 547, the Tribunal stated that the Tribunal may order that a person be joined as party to a proceeding under section 60 of the VCAT Act if the Tribunal considers that:
(a) the person ought to be bound by, or have the benefit of, an order of the Tribunal in the proceeding; or
(b) the person’s interests are affected by the proceeding; or
(c) for any other reason it is desirable that the person be joined as a party.
Having regard to Luther, the Tribunal held in the present case that paragraph (a) does not apply as none of the persons are in the category of being bound by or having the benefit of an order by the Tribunal. None of the people applying to be joined have indicated how their interests are affected by the proceeding. Therefore, the Tribunal was unable to form an opinion as to whether they should be joined under paragraph (b) and it was not persuaded that there is any other reason why it is desirable that the people should be joined as parties under paragraph (c).
The Tribunal noted the adjoining landowner is seeking to ‘piggy back’ onto this application for review. However, it considered that the appropriate process is for the adjoining landowner to seek leave to bring her own application for review under section 82B of the Planning and Environment Act 1987 (P&E Act). It noted that other parties do not appear to directly challenge that the adjoining landowner is an affected person because she is an adjoining owner to the south of the subject property. Also, the precondition that there were other objections received by the responsible authority is met. It is also open for the adjoining landowner to raise the matters about how notice was given by the Council and how she is affected by the permit application when seeking leave under section 82B of the P&E Act.
The Tribunal observed that it has previously held that it is not appropriate for a non-original objector to be joined as a joint applicant to an existing proceeding brought under section 82 of the P&E Act, for instance Cheal & Anor v Boroondara CC [2010] VCAT 195.
See also:
- Guide to Planning Appeals: Appeals > Joinder
6. What is the relevance of the Yarra River corridor controls that do not directly apply to the subject land? A different approach
A question of law was addressed by the Tribunal in Scoventure Pty Ltd v Yarra CC (Red Dot) [2024] VCAT 1207 as to the relevance of Clauses 12.03-1S and 12.03-1R of the Yarra Planning Scheme to the assessment of a proposal when overlay controls for the protection of the Yarra River corridor do not apply to land affected by the proposal.
The proposal was for the use and development of the land for a seven-to-eight storey office building in the Industrial 3 Zone.
A previous application for an eight storey building had been refused by the Tribunal in Shouman Pty Ltd v Yarra CC (Red Dot) [2022] VCAT 313. In that case, the Tribunal held that that the subject land is within the Yarra River corridor and that it was appropriate to give ‘considerable weight’ to the policies at Clauses 12.03-1S and 12.03-1R of the Scheme.
The legal opinion in Scoventure noted that Shouman was not addressing the issue of relevance as a question of law. Rather, in Shouman, following submissions being made by the Respondents, the Tribunal invited further written submissions from the Applicant and then the other parties as to the relevance and weight to be given to Clauses 12.03-1S and 12.03-1R of the Scheme, which the Tribunal then considered.
The Tribunal’s Red Dot summary in Scoventure states:
While in Shouman the Tribunal formed a view that the subject land formed part of the Yarra River corridor for the purposes of the policies, the legal determination is that the subject land is not part of the Yarra River corridor. However:
-
- Policy at clause 12.03-1R does not need to only apply to the Yarra River corridor for it to be relevant to the assessment of a permit application, nor does the Yarra River corridor need to be defined to include a particular parcel of private land in order for the policy to be taken into account in the assessment of a permission required on that private land.
-
- Therefore clauses 12.03-1S and 12.03-1R of the Yarra Planning Scheme may be relevant to the assessment of a permission involving land that is not in the Yarra River corridor.
-
- The weight to be given to the policies needs to consider the distance of a site from the Yarra River corridor and the potential visibility of the building by virtue of its height and mass, from the Yarra River corridor.
The Tribunal made reference to the principles enunciated in Viva Energy Australia Pty Ltd v City of Greater Geelong & Anor [2023] VSC 586, as well as Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191, Clifftop at Hepburn Pty Ltd v Hepburn SC [2023] VCAT 201 and Booth v Strathbogie SC [2023] VCAT 782 that “the planning policies that are to be taken into account in the exercise of any discretion under the Scheme are those that are relevant when viewing the permission sought through the lens of the purpose of the permission and its decision guidelines. That is, the decision-maker should ask ‘what is the purpose of that permission and what decision guidelines are to be taken into account in assessing that permission?’”
It is interesting to note that Council made a submission that Brunswick Investment and Clifftop can be distinguished on the basis that the Council does not seek to rely on the general direction in the purposes of the IN3Z to enliven policy in the Planning Policy Framework that is not relevant to the permission to construct a building on land in the Yarra River corridor; and further, distinguished Booth and the concerns expressed by the Tribunal regarding any land that is in a ‘designated bushfire prone area’ not being defined in Clause 13.02-1S of the Scheme because the Council submitted that the extent of the Yarra River corridor is clear from the 2016 Study.
As to the merits of the proposal, the Tribunal found it was acceptable. It also provided some analysis on the meaning of ‘mid-rise’ development. It stated:
Given the provisions of the Scheme, in context of the Panel report, our finding is that the proposal at seven to eight storeys is within the realm of what can be considered mid-rise where there is no overlay or zone provision applying to the Land that directs a more specific numeric to define ‘mid-rise’. [89]
See also:
- Guide to Planning Appeals: Policy > Scope of discretion
7. Successful challenge in the Supreme Court that an extension of permit was validly made
In Ibrahim v Greater Bendigo City Council [2025] VSC 6, the Permit Applicant for a child care centre successfully argued to the Supreme Court that the Tribunal in Ibrahim v Greater Bendigo CC [2024] VCAT 237 had erred in summarily dismissing an appeal lodged against the Council’s refusal to extend the time to complete a development.
The basis of Council’s position was that it had not received the request to extend time to complete the development. It advised the Applicant on 8 November 2023 that because it has no record of the request, the permit had expired and it could not make a decision on the matter.
The Applicant claimed that the request to extend the permit was made on 10 May 2023, which was contained within an affidavit tabled to the Tribunal.
In summarily dismissing the application, the Tribunal held that the application to VCAT should have been made within 60 days of the Council’s failure to determine the application, which meant the timeframe was ‘well before November’.
Even if the application had been considered to have made within time, on the assumption that the Council’s letter of 8 November 2023 was a deemed refusal, the Tribunal held the application was lodged one day late (should have been 7 January, not 8 January which is the date it was received by VCAT).
The Applicant’s grounds of appeal to the Court were:
- Did the Tribunal’s reasons sufficiently explain the process of reasoning by which it formed the opinion that the proceeding should be summarily dismissed because the application was misconceived?
- Was it reasonably open to the Tribunal to conclude that the application under section 81(1) of the Planning and Environment Act 1987 (P&E Act) was misconceived without making a finding on the question of whether that application was in fact made?
- In concluding that any application for review of the decision made 8 November 2023 was required to be made by Sunday 7 January 2024, did the Tribunal misdirect itself as to the operation of reg 34(1) of the Planning & Environment Regulations and section 44 of the Interpretation of Law Act 1984 (IL Act)?
The Court refused leave on grounds 1 and 2, noting that these two matters were not pursued vigorously by the Plaintiff.
As to ground 3, the Court held that there is no error in the Tribunal’s acceptance that, in the circumstances, the letter of 8 November 2023 was a deemed refusal based on the effect of section 4(2)(c) of the Victorian Civil and Administrative Act 1998 (VCAT Act) and, as a consequence, the review is properly brought pursuant to section 81(1)(a) of the P&E Act.
However, the Court considered the Tribunal misdirected itself as to the correct calculation of time in which the appeal was required to be lodged pursuant reg 34 of the P&E Regulations. This was because it failed to take into account the operation of section 44(3) of the IL Act. The calculation of the timeframe of 60 days terminated on 7 January 2024, which being a Sunday the expiry does not operate until the next business day, which was Monday 8 January 2024. This was the day the application was made.
In its concluding remarks, in an issue that practitioners should be aware of, the Court accepted that on a plain reading of section 81 of the P&E Act, the word ‘or’ between sub‑paragraphs (1)(a) and (1)(b) does not operate as a limitation (or a mutually exclusive choice) but as opportunities for review which may be triggered respectively by a refusal, or a deemed refusal in the case of (1)(a), or by a failure to determine the request in accordance with (1)(b).
The Court ordered that the proceeding be remitted to be heard and determined by a differently constituted Tribunal.
It would seem that despite Council being satisfied that a request was not made to extend the permit, or at least was not satisfied there was adequate proof, it was on the basis of the Tribunal and subsequently the Court acceptance that the request had been made on 10 May 2023 that kept the permit live (as it would have expired on 10 May 2024). Whilst the Applicant had 60 days to lodge an appeal against the failure to make a decision to extend the permit, which would have been 10 July, section 4(2)(c) or (d) of the VCAT Act was invoked to allow the lodgement of the appeal. The error was limited to the incorrect application of calculating the days to lodge a proceeding under section 44(3) of the IL Act.
See also:
- Guide to Planning Appeals: Permit > Extension of time to complete a development