VCAT Volume 12 No 2

1. Mandatory garden area controls: mandatory until they are not

A proposal to roof a pergola on one of a pair of townhouses has raised the question as to whether the mandatory garden area controls apply on an on-going basis.

In Tully v Moonee Valley CC [2024] VCAT 908, an application was made under section 149(1)(a) of the Planning and Environment Act 1987 (P&E Act) to review Council’s decision to refuse an application for secondary consent. The application sought to amend the plans to add a roof over an existing verandah and pergola. The plans to be amended were the development plans for the original two dwelling development. The dwellings had been constructed and were now each on their own lot.

The Council had refused the application on the basis that they understood the proposal to be prohibited. This was because the proposal reduced the garden area of the approved two-dwelling development to 27.6%, whereas the mandatory minimum garden area that applied to the original two dwelling application was 30%, given the lot size of 650m2.

Council submitted that having regard to Benedetti v Moonee Valley City Council [2005] VSC 434 and Box v Moreland CC (Red Dot) 2014 VCAT 246, a permit has an on-going effect. In Box, it was held that so long as a dwelling which benefitted from the original planning permit to construct two dwellings existed, Condition 2 continued to have effect. The fact that the dwelling in question was now a single dwelling on a lot greater than 300 square metres, rather than one of two dwellings on a single lot (for which a planning permit was originally required to construct), did not negate the fact that at the time the dwelling was constructed, it required a planning permit.

However, the Tribunal agreed with the Applicant’s submissions and found that the mandatory garden area was no longer applicable to the secondary consent application [paragraphs 21 to 24]:

…in the circumstances here, I find that it is misguided and incorrect for Council to simply assume that the GRZ ‘mandatory minimum garden area’ requirements continue to apply in a mandatory way to this ‘secondary consent’ application, in the same way that they did when the original permit applicant sought permission to develop the two dwellings on a lot.

That is to say, I find that the ‘mandatory minimum garden area’ requirement arising from the GRZ provisions is not an enduring requirement like the relevant planning permit conditions. Rather, the ‘mandatory minimum garden area’ requirements were simply mandatory planning scheme controls to simply be applied at the time of the original planning permit application. 

I am unaware of any text in the relevant ‘mandatory minimum garden area’ provisions in the GRZ which give any hint or indication that such provisions in effect have a ‘mandatory indefinite life’ after the approved development is actually built. If the draftpersons of the GRZ had intended that such provisions needed to be applied in a mandatory way not just to the original planning assessment but then over the life of the as-built approved development, this could have easily been spelt out in the relevant text (but this is not the case).

Similarly if you only focus on previous cases which involve this type of ‘secondary consent application’, I am unaware of any previous VCAT or Supreme Court decision supporting Council’s preferred position that the ‘mandatory minimum garden area’ requirements have a mandatory on-going and indefinite operation.

It appears to your editors that underpinning the Tribunal’s finding is that the new lot subject to the amended plans is under 400 square metres, which is the minimum lot size that triggers the mandatory garden area requirement.

At one level it seems incongruous that a secondary consent process can somehow expunge a mandatory requirement. However, it would appear that where the size of a new lot has been established by a subdivision permit, the implication is that a new planning unit is established which has the effect of ‘removing’ a hitherto mandatory requirement. Whether this was intended by the drafters of the provision is not known, however the impact of this decision reduces a prescribed amount of land dedicated for a garden area. This appears to run counter to Amendment VC110 where the explanatory report states the purpose of the amendment is “to protect the garden suburban character of existing urban areas”.  It is important to note that the Benedetti decision made clear that the ‘Condition 2’ process requiring approval to amend plans is an on-going obligation and that the Applicant in this case exercised their right to seek an amendment to an endorsed plan.

See also:

  • Guide to Planning Appeals: Garden area requirements

2. Natural ground level – more than two approaches

Over the years there has been two approaches to determine natural ground level (NGL). The first approach relies upon ground level immediately prior to the application for planning permit (‘existing ground level’ – see Shire of Gisborne v King and Anor [1994] VicRp 23; [1994] 1 VR 364; Lampard v Bayside CC [2005] VCAT 234; and Mrocki v Bayside CC (includes Summary) (Red Dot) [2015] VCAT 1731)

The second approach relies upon ground level before development of any kind (‘pre-development ground level’) – see Faversham Mews Pty Ltd v Boroondara CC [2016] VCAT 1954; SB&G – 40 Upper Heidelberg Road (Ivanhoe) Pty Ltd v Banyule CC [2018] VCAT 769; and Degenhardt v Mornington Peninsula SC [2023] VCAT 31.

In Coda One Pty Ltd v Stonnington CC [2024] VCAT 1022, a preliminary hearing was held to determine whether the proposed development exceeds the mandatory height limit as set out at Clause 32.08-11 of the Stonnington Planning Scheme, in circumstances where:

  • The land is in a Special Building Overlay, and therefore has a minimum floor level set by Melbourne Water; and,
  • There is a dispute as to whether any part of the land has a fall of more than 2.5 degrees over an 8 metre cross section of the site.

The Respondents, who were objectors to the application, considered the height exceeded the requirements of Clause 32.08-11.

The Applicant relied upon the evidence of a qualified and experienced land surveyor which was the only evidence before the Tribunal with respect to existing and natural or pre-development ground level. On that basis, the Applicant argued that following either the first or second approach in this case, yields the same outcome.

Having regard to the evidence, the Tribunal concluded that the existing ground levels in this case represent pre-development development levels or natural ground level of the land. Thus, the slope of the natural ground level of the land at various cross sections wider than 8 metres is 2.5 degrees or more. Accordingly, the proposal as shown on the decision plans does not exceed the mandatory height limit contained in cl 4 of schedule 10 to Clause 32.08 of the Scheme.

As to the two approaches in previous Tribunal decisions, it stated:

We disagree that there are two approaches in the decisions of the Tribunal with respect to natural ground level. In reviewing the decisions of the Tribunal relied upon by the parties, we conclude that each case turned on its facts, circumstances and the evidence before the Tribunal. 

Importantly, we agree that in considering the facts and circumstances of each case, matters such as manipulation of the land, previous land use and development and absurd or artificial outcomes are all relevant in the determination of natural ground level.

We also agree that as the ‘fact finder’ we may have to rely upon incomplete evidence, or interpolations or inferences. However, it is also important to acknowledge that the focus must be on evidence and what can be reasonably inferred or interpolated from that rather than supposition or bare assertions.

Further, in considering the evidence or material before the Tribunal, we must be satisfied on the balance of probabilities and not some higher standard set by parties. [88-91]

The Tribunal’s finding that there are more than two approaches to determine NGL may result in more complex hearings in the future, but as this case has made clear the extent of matters that affect NGL are complicated and varied.

See also:

  • Guide to Planning Appeals: Natural Ground Level

3. Clifftop at Hepburn – costs postscript

It may be recalled that in Clifftop at Hepburn Pty Ltd v Hepburn SC [2024] VCAT 433 the Tribunal granted a permit for a camping and caravan park. Bushfire risk was a key issue in the proceeding and the Tribunal joined the CFA as a party to the proceeding pursuant to section 60 of the Victorian Civil and Administrative Tribunal Act 1998 (VCAT Act). The CFA was a recommending referral authority.

The above case was a repeat appeal following an earlier decision where the Tribunal refused a permit (Clifftop at Hepburn Pty Ltd v Hepburn SC [2021] VCAT 546).

In Clifftop at Hepburn Pty Ltd v Hepburn SC (Costs) [2024] VCAT 952, the Applicant sought costs against the CFA and some third parties and a reimbursement of fees from the Council. The Applicant and Council reached an agreement on the reimbursement of fees.

The Applicant submitted costs ought to be made against the CFA because:

  • The CFA conducted the proceeding in a way that unnecessarily disadvantaged another party to the proceeding (section 109(3)(a) of the VCAT Act);
  • The CFA was responsible for prolonging unreasonably the time taken to complete the proceeding (section 109(3)(b) of the VCAT Act); and
  • The CFA’s legal representative made a claim that had no tenable basis in fact or law (section 109(3)(c) of the VCAT Act).

Further, the Applicant sought costs against the CFA on the basis that the CFA’s conduct in relation to the Pathways Plan resulted in unnecessary cost to the Applicant in needing to respond to submissions from the CFA made in response to the Tribunal’s order dated 22 September 2023. In short, the Applicant contended that once the CFA reviewed the practice day hearing transcript, that should have been the end of the CFA’s concerns regarding what had occurred at the practice day hearing held on 4 April 2023 (in the absence of the CFA’s legal representative). However, instead, the CFA filed further submissions on 20 October 2023, to which the Applicant then needed to respond.

The CFA did not make a submission on the costs application.

In deciding to award costs against the CFA, the Tribunal considered that there appeared to have been either a lack of communication, or a miscommunication, between the CFA and its legal representative as to what was said at the practice day hearing held on 4 April 2023, and its effect, has either caused or contributed to the CFA’s submissions on 20 October 2023. It stated:

…. there is an expectation that a party will conduct their case in an efficient manner and in a way that does not unnecessarily disadvantage other parties to the proceeding. This is especially so in proceedings of a longer duration. We accept that ultimately the applicant was put to expense that it need not have been given the CFA’s conduct, albeit there is nothing before us to suggest that the CFA was acting with malice. [78]

The Tribunal decided awarding costs against three third parties. It considered that it was not unreasonable for the parties to raise their issues, given the Tribunal is required to make a decision on the planning permit application as a whole, notwithstanding that it will give varying amounts of weight to the findings of the previous decision.

See also:

  • Guide to Planning Appeals: Costs > Conduct of parties

4. Claims that arboriculture theory is based upon ‘junk science’ dismissed

A seemingly very disgruntled Applicant that had been denied approval by a Council to remove a Liquid Amber tree adopted a unique approach in arguing his case to the Tribunal.

In AMNY Holdings Pty Ltd v Whitehorse CC [2024] VCAT 947, the Council had refused the removal of the aforementioned tree on a site in the Significant Landscape Overlay. Council called its arboriculturist to give evidence.

Despite the many attempts of the Applicant to discredit the witness, the Tribunal found that Council’s expert witness has the skills and expertise to properly assess the tree on the health and condition at the time of inspection. In accordance with Practice Note PNVCAT2, it found the evidence of the witness to be soundly based, complete, impartial, dispassionate and within the scope of his expertise.

The Applicant did not call an expert witness, claiming that arboriculture theory is based upon ‘junk science’. Further, the Applicant relied on the Daubert criteria, a rule used in the courts of United States of America to evaluate the admissibility and reliability of expert witness testimony.

The Applicant referred the Tribunal to at least 20 international journals and publications that analyse likelihood of tree failure, risk management, review of Quantified Tree Risk Assessment (‘QTRA’) or Tree Risk Assessment Qualification (‘TRAQ’) or VALID methodology, and mitigation of risk.

In dismissing the appeal, the Tribunal did not find that it was necessary for Council or their arborists to demonstrate compliance with the Daubert criteria, although it recognised that tree risk assessment models such as QTRA and TRAQ have been widely used by arboricultural practitioners.

Further, the Tribunal did not make any unfavourable inference based on the fact that a witness was not called, consistent with the decision Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298.

The Tribunal approached its task as follows. It

  • received facts and opinions about the tree’s condition and health;
  • assessed the weight and reliability of the evidence, including matters raised through cross-examination and direct questions that it had;
  • received submissions on what weight should be giving that evidence; and
  • made a determination based on the information before it.

See also:

  • Guide to Planning Appeals: Evidence, > Weight, Vegetation > Vegetation removal

5. Two two lot subdivision or four lot subdivision: implications on a public open space contribution

In Li v Whitehorse CC [2024] VCAT 999, the Applicant appealed a condition requiring payment of a public open space contribution of 4%. The subdivision permit that had been approved was for four lots.

The Applicant argued that they were exempt from a public open space contribution because the subdivision involved two lots on adjoining lots.

The Tribunal noted that the Applicants had not sought permission to subdivide each of the lots into two lots.

Noting that the Applicant’s arguments were not novel, the Tribunal was assisted by authorities brought to its attention by the Responsible Authority regarding either the effect of the exemption in analogous circumstances or how to characterise staged subdivisions each constructing two lots.

The Tribunal found the ‘land’ in the subdivision is the land comprising the combined area of the two lots. The ‘land’ in this context is that area. It is not relevant to the exemption that the land has already been subdivided into two lots. It is also not relevant to the exemption that the two lots are separately owned.

The Applicants put to the Tribunal that it should prefer ‘form’ over ‘substance’. The Tribunal stated:

In substance, the subdivision creates a number of lots that does not meet the exemption.

Even if I were to prefer ‘form’, the subdivision is not in the form of two two-lot subdivisions.

There is no lot boundary that is in the same position as the boundary between the two existing lots. The blue line passing horizontally through the middle of the land on the plan shows the existing title boundary between lots 110 & 111. It is apparent that parts of dwelling 3 are located in both lots. [13-14]

See also:

  • Guide to Planning Appeals: Public open space contributions > Exemptions

6. An expired permit for a sign fails to gain new approval

An applicant for floodlit promotional sky signs on a site that had been given approval for such signs previously, but had expired, may have had an expectation that approval would be forthcoming. However, in Maple Media Pty Ltd v Monash CC [2024] VCAT 964, the Tribunal refused a permit.

The expiry of the permit was confirmed in Maple Media Pty Ltd v Monash CC [2024] VCAT 399 (see editorial comment VCAT Vol 11 No 11). The original permit had been granted by the Tribunal in Maple Media Pty Ltd v Monash CC [2019] VCAT 79.

The matter before the Tribunal was a fresh application but required consideration as a ‘repeat’ appeal given the Tribunal decision to approve the original permit.

The signs were existing and the original approval was for retrospective approval.

The Applicant claimed that the proposed signs were essentially the same as that previously approved in the original decision. However, Council contended that following notification of the application concerns have been raised by local residents about visual impact of the signs and the effect of illumination on residential amenity. Council submitted that these objections, combined with the fact that the signs have now been erected, are significant changes relevant to the merits assessment.

Despite the Applicant’s contentions the signs were essentially the same, the Tribunal identified a number of discrepancies in the various plans that had been prepared as well as changes to the signs. It considered that the plans before it could not be identical to the plans that were before the previous Tribunal whether Revision B or C, due to the secondary consent process that occurred post decision. Post decision changes included the introduction of the substantial steel support structure that suspends the signs over and above the host building. It found that the introduction of the support structure is a significant change.

The Tribunal also noted that there had been a change to the policy framework since the original decision, particularly to local policy in Clause 15.01-1L-01 (Signs).

In refusing a permit on the merits, the Tribunal held:

  • The thickness of the sign supports when combined with the scale of the signs gives the appearance of the signs straddling the host building to its detriment when viewed from the intersection and the residential area to the south of the review site.
  • The offset of the signs from the host building on the steel supporting structure means that the signs have the appearance of being suspended against the sky and not seen within a context of commercial land use, which was unacceptable.
  • It was not persuaded that the impact of the direct views to the luminaries will be fully resolved by baffling because of the angle of view and the fact that you are lower than the sign looking up.

See also:

  • Guide to Planning Appeals: Advertising signs > Visual impacts in the built environment, Appeals > Repeat appeals

7. Impact of buildings and works for a function centre on existing use rights

In Anker v Yarra Ranges SC [2024] VCAT 1024, the Tribunal considered a number of questions of law concerning existing use rights.

The questions arose in the context of a review of Council’s decision to refuse to grant permission for buildings and works for a marquee and arbor structure and carparking/access works for a function centre on the subject land.

Question 1 is: Does Clause 51.02-4 provide a permit trigger for buildings and works?

Clause 51.02 is a provision that only applies to Green Wedge land and constitutes core planning provisions. The Tribunal found that Clause 51.02 regulates subdivision (being a form of development) in circumstances as provided in Clause 51.02-3 but does not otherwise generate a separate permit requirement i.e. as a trigger for buildings and works beyond applicable zone or overlay controls as relevant.

Question 2 is: Are the existing use rights established ‘by’ Clause 51.02?

The Tribunal found that the purpose of Clause 51.02-4, understood in the context of the provision as a whole, is to cover the circumstances where an existing use pertains to a use in the table of uses, to confirm that the same limitations apply as they would for the zone controls.

More specifically, it triggers the considerations for a section 3 use, regardless of the underlying section that would ordinarily apply to a use to be permitted.

To this extent, when Clause 51.02-4 refers to ‘a use right [being] established by these provisions’, it does not seek to usurp the role of Clause 63.

Question 3 is: What limitations or conditions apply (or do not apply) to the existing use right by operation of Clause 63.05 to this particular use?

The Tribunal accepted that the starting point is that the planning scheme cannot overstep the protections in section 6(3) of the Planning and Environment Act 1987 (P&E Act), and that only certain uses are protected.

However, it was not persuaded that there is any indication in the planning scheme or P&E Act that existing use rights are lost or extinguished (either generally or for an affected part of the land) by virtue of unauthorised buildings and works.

Instead, it held that there are provisions that relate to existing use rights being lost or extinguished by a cessation of the use (for more than two years) or where buildings and works are damaged or destroyed to a certain percentage such that the use cannot continue without them being reconstructed (in Clause 63.10).

Question 4 is: Is the application prohibited because the number of patrons may exceed those specified in the underlying planning controls?

The Tribunal found that the relevance of the patron number provisions in the table of uses in the zone and Clause 51.02 falls away once an existing use right has been established.

The existing use in this case has not been limited to particular patron numbers in the certificate of compliance. Therefore, its patron numbers ‘are at large’.

Question 5 is: Does the proposal for the sale and consumption of liquor constitute an alternative use pursuant to Clause 63.08 (with associated limitations)?

The Tribunal considered the threshold in Clause 63.08 is specifically confined to an ‘alternative use’. It held it should only properly be applied to a genuine alternative use, in the sense that the existing use is being replaced with another.

It considered this is consistent with the ordinary meaning of this term in its planning scheme context, as well as with the approach to applying existing use rights as liberally as the language allows, as espoused by the Tribunal and the courts.

In the current circumstances, the use of the land for a function centre would persist as the primary purpose of the use.

Question 6 is: What buildings and works controls apply to the proposal?

The Tribunal agreed with parties that the only applicable planning scheme controls in this instance which generate a requirement for buildings and works permission are contained within the Significant Landscape Overlay.

There is no other applicable permit ‘triggers’ within either the Green Wedge Zone or Clause 51.02.

Question 7 is: Is permission required (or able to be granted) for the sale and consumption of liquor under Clause 52.27 having regard to the extent of rights conferred by the existing use right?

The Tribunal considered that the formalised use of the subject land for the sale and consumption of liquor would be a new additional ‘use’, albeit one that is intended to supplement the existing use of the land for a function centre.

It noted Clause 52.27 is a stand-alone provision that requires a planning permit. In these circumstances, it would be a ‘stretch’ to say that it would offend principles pertaining to existing use rights to potentially regulate the supply of liquor to the property, such as conditions on hours of supply, patron numbers or the like.

This is particularly the case where the first dot point is relied on as the permit requirement – where a licence is required under the Liquor Control Reform Act 1998 i.e. in the first instance.

The function centre could continue to operate without restriction i.e. to enable any number of people to congregate at any time of day, but would only be confined in respect of the service of alcohol.

To this extent, the Tribunal found the protection in section 6(3) of the Act would remain effective.

See also:

  • Guide to Planning Appeals: Existing use rights > Buildings and works

8. Repair order made under Heritage Act confirmed

Following a lengthy hearing held over a number of days for a 18 month period, and ten months after the last hearing day, the Tribunal in Enkade Pty Ltd v Executive Director – Heritage Victoria [2024] VCAT 715 has affirmed a decision of the Executive Director – Heritage to issue a repair order requiring an owner to undertake works with respect to the registered place or registered object pursuant to the Heritage Act 2017 (Heritage Act).

The Tribunal identified a number of ‘eccentricities’ of the proceeding, which no doubt explains the length of time to complete the proceeding. Such eccentricities included the Covid-19 pandemic; an application for a Stay order; a failed compulsory conference; failure of attendance due to ill-health; alleged conflicts of interest; new submissions and new evidence at the reconvened hearing; negotiations between the Applicant and Heritage Victoria about items in the repair order; the interposing of witnesses to address submissions and criticisms raised by the Applicant; and the issuing new guidelines for permit exemptions in December 2022 by the State Government.

It was noted by the Tribunal that the relevant provisions in the Heritage Act place the onus of proof on an owner to satisfy the Tribunal on review, that it has not allowed the registered place or registered object to fall into disrepair, or that it has not failed to maintain a registered place or registered object to the extent that its conservation is threatened. (Tribunal emphasis).

The standard of proof is the balance of probabilities

Whilst the Applicant conceded the registered place is in a state of disrepair, the Applicant contested that it has allowed the registered place to fall into disrepair, or that it has failed to maintain the registered place to the extent that its conservation is threatened (Tribunal emphasis).

Despite being the owner since 1977, the Applicant is adamant that the registered place or registered object has been in a decrepit state for decades, before heritage protection laws applied since the 1970s, i.e. before it became the owner.

In attempting to prove impunity, the Applicant submitted that, amongst other things:

  • there have been numerous intervening acts over recent decades which prove they had not caused the state or condition of the registered place;
  • it has done more for the registered place than anyone, and relied on the various acts of maintenance and expenditure over the years in the upkeep of the registered place;
  • there was bad faith and interference with works on the part of the tenant of the registered place who reported the matter to the heritage regulator because they (as landlord) and tenant were in dispute; and
  • there is suspicion that tampering or damage has occurred at the registered place.

The Tribunal considered the Applicant’s conduct must be viewed through the lens of the repair order itself rather than the state of the registered place as a whole. Put another way, the registered place has fallen into disrepair or is in a condition where its conservation is threatened to the extent specified in the repair order only. It stated:

This means that unless the fact of disrepair or condition is challenged elsewhere, assuming there is no obvious error in the repair order, the Tribunal will assume that the works required in the repair order are appropriate.

It will depend on the facts and circumstances of each case whether the owner can point to other acts of maintenance to prove that it has discharged its responsibilities with respect to the items identified in a repair order. But any other acts of maintenance of themselves do not necessarily negate or prove the owner discharged its obligations for the items which have resulted in the registered place or registered object falling into disrepair or being in a condition where the extent of its conservation is threatened.

To illustrate the point, the gargoyles and the façade of the building at the registered place are both identified in the repair order as requiring works.

On review, it is appropriate for the Tribunal to ask:

    • did Enkade allow the gargoyles or the facade of the building to fall into their state of disrepair?; or (Tribunal emphasis)
    • did Enkade fail to maintain the gargoyles or the façade to the extent that their conservation is now threatened? (Tribunal emphasis)

Enkade submits because it undertook other acts of maintenance (such as replacing the roof and other items) and there were intervening factors, this proves it has not allowed the registered place to fall into disrepair, and it has not failed to maintain the registered place to the extent its conservation is threatened. (Tribunal emphasis)

Whilst the replacement of the roof is indeed an act of maintenance, this does not necessarily discharge Enkade’s responsibility to maintain the gargoyles or the façade which are external to and part of the heritage fabric of the building. That is, the replacement of the roof does not negate Enkade’s conduct if it has not maintained the gargoyles or the façade which are now in a state of disrepair. It would be nonsensical if Enkade’s conduct was assessed by its acts of maintenance on the registered place ‘at large’, and/or over decades, rather than through the lens of the items identified in repair order which are in disrepair or threatened. Otherwise, the state of the gargoyles for example (being a very important feature of the heritage fabric of the building) could be countenanced by the replacement of the roof, an element that is not mentioned in the repair order at all. The Victorian Parliament did not intend that owners of registered places or objects can avoid responsibility for repairs and maintenance in such a way.

The point being, that the assessment is not to ‘weigh up’ whether, on balance, other acts of maintenance over time negate the condition of the items in the repair order which are in disrepair or threatened. The task is to assess what was the owner’s conduct with respect to the items in the repair order given they have fallen into disrepair or are in a state where their conservation is now threatened. [23-29]

The Tribunal concluded as follows:

  • During the period in which the Applicant has owned the registered place, it has not ‘maintained’ the registered place to the extent that its conservation is threatened because it has not ‘preserved’ the items in the repair order, or ‘kept them in due condition’.
  • Thus, the only reasonable conclusion open to the Tribunal is that the owner has failed to maintain the registered place to the extent that its conservation is threatened.
  • Based on this finding alone, the Tribunal must confirm the repair order.

See also:

  • Guide to Planning Appeals: Heritage Act 2017, Repair order