VCAT Volume 11 No 9
1. Relevance and scope of considerations – the cases continue
It seems that more and more cases are having to address the complex and challenging issue of the rights of parties to make submissions – or affect the scope of submissions – on planning applications, which also affects the Tribunal’s (and Supreme Court’s) jurisdiction in making decisions on applications.
In the latest reporting period, there have been three more cases that have addressed the issue of relevance and scope of consideration: Kangaroo Rise (Bendigo) Pty Ltd v Greater Bendigo CC [2024] VCAT 207, Lane v Surf Coast SC [2024] VCAT 223 and Nasralla v Hobsons Bay CC [2024] VCAT 212.
As practitioners are aware, the earlier noteworthy that addressed the issue of relevance and scope of discretion include Sweetvale Pty Ltd v Victorian Civil and Administrative Tribunal [2001] VSC 426; (2001) 18 VAR 411, Sweetvale Pty Ltd and Anor v Victorian Civil and Administrative Tribunal & Ors [2003] VSCA 83, and most significant of all, National Trust of Australia (Vic) v Australian Temperance and General Mutual Life Assurance Society Ltd [1976] VicRp 60; [1976] VR 592 (from which the ‘National Trust’ principle emerged).
Other noteworthy cases have included:
- Boroondara City Council v 1045 Burke Road [2015] VSCA 15, which addressed the issue of the relevance of broader planning issues involving an application to demolish a building in the Heritage Overlay;
- Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191, which involved consideration of the relevance of transport policy to the grant of a planning permit in circumstances where no planning permit was required for a reduction in car parking under Clause 52.06;
- Clifftop at Hepburn Pty Ltd v Hepburn SC [2023] VCAT 201, which involved considerations of a third party’s right to make submission on bushfire impacts given the third party notice and review exemptions in the Bushfire Management Overlay;
- Booth v Strathbogie SC [2023] VCAT 782, which involved consideration on the relevance of bushfire risk on land designated as bushfire prone area under Building Act 1993;
- Viva Energy Australia v Greater Geelong CC (Red Dot) [2022] VCAT 326 and Viva Energy Australia Pty Ltd v City of Greater Geelong Council & Anor [2023] VSC 586, which involved the relevance of an application for subdivision on land in a Design and Development Overlay on an existing Major Hazard Facility; and
- Myers v Southern Grampians SC (Red Dot) [2022] VCAT 695 and Myers v Southern Grampians Shire Council [2023] VSC 658, which involved consideration of whether third parties (who were objectors to an application for Group accommodation) had rights to make submissions on matters pertaining to a Design and Development Overlay (DDO) that included exemptions from third party notice and review rights, and subsequently whether the Tribunal had jurisdiction to consider matters under the DDO given the appeal was a section 82 appeal only.
Below is a summary of the three recent cases referred to above that have addressed the issue of relevance and scope of consideration:
In Kangaroo Rise, which involved an application for a residential subdivision, the Tribunal held that an operator of a wastewater treatment plant, who had objected to the application because of concerns with access, could not make submissions on Clause 52.29-2 (create or alter access to a road in a Transport Road Zone 2 (TRZ2)) and Clause 52.29-2 (subdivide land adjacent to a road in a TRZ2).
Access to the proposed subdivision was from the Calder Highway (in the TRZ2) via an intersection with a side road. The Tribunal found the objection could not include submissions on the operation and safety of Calder Highway, but could on the effect or impact of the changes to the intersection of the side road and Calder Highway on its operation of the wastewater treatment plant. This was on the basis the proposed subdivision must meet requirements of Clause 56 and the decision guidelines of the General Residential Zone (GRZ), as contained in Clause 32.08-14. Permit triggers in the GRZ and Clause 56 do not have exemptions from notice and review rights.
In Lane, which involved a proposal for a single dwelling on land subject to a number of overlays, the Tribunal stated: Following Myers, the Tribunal may only issue a permit for the permissions that are before it. If I determine that it is appropriate to grant a permit for the construction of a dwelling under the NCO and ESO, that permit will not include the permissions or conditions related to the BMO.
In Nasralla, the Tribunal considered a refusal for two dwellings largely because of Council’s concerns with potential risk arising from the review site’s proximity to a Major Hazard Facility, the Qenos Olefins MHF. The review site is in WorkSafe’s Outer Safety Area of the MHF and it advised against the granting of a permit.
The Tribunal made an order requiring submissions regarding the relevance of the issues raised in the grounds of refusal to the permission required for the proposed development. Having regard to the submissions, it found that:
- The purpose of the Neighbourhood Residential Zone Schedule 6 (NRZ6) to implement the Municipal Planning Strategy and the Planning Policy Framework is not, of itself, a sufficient basis to require consideration of a planning policy in the decision-making for any particular discretion. This finding is based on the Brunswick Investment decision which found that the decision-maker must only consider the policies at State and local level that are relevant to the exercise of the discretion it has to determine, noting that policy in this statutory planning context is the servant and not the master.
- The purpose of the NRZ6, ‘to manage and ensure that development respects the identified neighbourhood character, heritage, environmental or landscape characteristics’ (editor emphasis), whilst accepting that the concept of ‘environmental characteristics’ might extend to, for instance, naturally occurring events such as flood or bushfire, or conditions of land that may or may not occur naturally, such as salinity or environmental contamination, the meaning of the term is also influenced by the context in which it is found. It noted the term ‘environmental’ is listed alongside ‘identified neighbourhood character, heritage… or landscape characteristics’. As such, what is meant by the term ‘environmental characteristics’ must be understood in light of the other listed concepts, with each of these concepts ‘having work to do’. Further, it noted these characteristics must be ‘identified’. In the present circumstances, there are no identified environmental characteristics or environmental objectives contained in Schedule 6 to the NRZ. There are no overlays applied to the land, let alone any environmental overlays. The Tribunal dismissed the Council’s submissions about the relevance of the Strategic Framework Plan in Clause 02.04 (which identifies the Qenos Olefins MHF), because it is not an identified environmental characteristic in the context of the third purpose of the NRZ.
- The decision guidelines contained in Clause 32.09-14, which include, inter alia, ‘the effect on the environment, human health and amenity of the area’ appears to be directed at the effect of the two dwellings on human health, not the other way round. It stated: The concerns expressed by WorkSafe that are related to a potential incident at the Qenos Olefins MHF may be an effect on the human health of an area but this is different to the effect on the human health of an area that the development of two dwellings on the Land might cause.
For similar reasons, the Tribunal found decision guidelines in Clause 65.01 and section 60 of the Planning and Environment Act 1987 argued by Council to be relevant not relevant because they were too broad to incorporate consideration of the policies in Clauses 13.07-1S and 13.07-2S of the Scheme.
The Tribunal made some observations on the Buffer Area Overlay (BAO), which is yet to be introduced in the Hobsons Bay Planning Scheme. It considered that if the BAO was incorporated into the Scheme, it would provide a framework within which assessment of these issues could occur. Where the BAO applied to a site, assessment under the BAO would include consideration of the statement of risk and the objectives to be achieved through the BAO, the decision guidelines in Clause 44.08‑7 of the BAO and application of State planning policy relevant to the BAO, including, for instance, Clauses 13.07-1S and 13.07‑2S of the Scheme. It stated:
What I will say is that it would appear that the BAO is the appropriate control to regulate this matter, and, in the absence of the BAO being applied to the Land, the policies in clauses 13.07-1S and 13.07-2S have nothing to attach to in terms of their assessment, given my earlier findings regarding those policies and the NRZ6. [215]
Relevance and jurisdiction have long been an issue of the planning system. However, recent cases, at least since the Court of Appeal case Boroondara City Council v 1045 Burke Road, have demonstrated that the matter is of increasing complexity, particularly where there are multiple permit triggers for the one application, and where exemptions from third party notice and review may apply to some permit triggers but not others. It also begs the question of how truly Victoria’s planning system is an integrated decision-making system, bearing in mind section 4(2)(c) of the P&E Act to:
to enable land use and development planning and policy to be easily integrated with environmental, social, economic, conservation and resource management policies at State, regional and municipal levels;
And Clause 71.02-1 of the Victoria Planning Provisions:
The Planning Policy Framework seeks to ensure that the objectives of planning in Victoria (as set out in section 4 of the Act) are fostered through appropriate land use and development planning policies and practices that integrate relevant environmental, social and economic factors in the interests of net community benefit and sustainable development.
See also:
- Guide to Planning Appeals: National Trust principle > Relevance of specific clauses and decision guidelines in the planning scheme with control trigger
2. Is a dental laboratory an industry?
In Bottomley v Boroondara CC [2024] VCAT 200, retrospective application was made for the use of land for industry (dental laboratory).
The permit applicant described the use as follows:
Dental laboratories typically manufacture dental items such as dentures, splints, crowns, bridges, implants, mouth guards and the like. Typically these are made using impressions provided by dental practitioners. These items typically are made by hand (and sometimes using 3D printers) and do not use toxic chemicals or dangerous products.
No dental treatments are done on the premises.
Industry is a section 2 permit-required use in the Commercial 1 Zone and is subject to a condition that it must not be a purpose listed in the table to Clause 53.10, which relates to Uses and Activities with potential adverse impacts.
The Tribunal considered there was uncertainty regarding the characterisation of the land use as either an innominate use being a dental laboratory or whether it more befittingly falls under the broader umbrella of industry as defined in Clause 73.03 due to manufacturing activity occurring with the making of dentures.
Council’s position, reinforced by a legal opinion that was tabled in the proceeding, was that the dental laboratory in making dentures fits within the concept of ‘any process of manufacture’. The Respondent, and objector to the application, agreed. The permit applicant did not dispute that the dental laboratory use is not an industry.
As to the matter of use, the Tribunal found:
Council’s view is that the dental laboratory involves the making of dental products. The making of many, if not all, of the dental products involves the mechanical and physical process of material gathering, assembly of parts and formation.
There was discussion about the scale of an industry, however, I accept that the scale of manufacturing associated with the dental laboratory is small and not of a scale that involves the use of a large factory building. I accept that manufacturing is occurring and that the making of dentures is a form of manufacturing, however, it is an activity that is clearly of a small scale with work on dental products that are small, and which utilises machinery that can comfortably be accommodated on desks similar to an office desk or benchtop.
Reference to industry invokes a broad range of activities and I am comfortable in including reference to dental laboratory in the permit preamble to ensure there is reference to the specific activities on the site and not the broader range of uses included in the definition of industry. [31-33]
Given the small scale of the operation and the nature of the manufacturing processes, the Tribunal held the use could not be categorised as ‘Printing and coating works with heated curing ovens’, which requires a threshold distance of 500 metres under Clause 53.10. It stated:
My views on this are supported by referring to the ‘Recommended separation distances for industrial residual air emissions (Publication 1518, Environment Protection Authority, March 2013)’ which is listed as a policy document under Clause 13.06-1S which includes in Table 1 reference to ‘Manufacture of products using fiberglass and resin’ and the scale of such industry at greater than 250 tonnes per year. Similarly for printing works, the reference is to such works emitting volatile organic compounds greater than 100 kilograms per day. These are substantial and truly industrial scale activities. The dental laboratory does not achieve these quantities of production or emissions.
I have taken a purposive approach to this issue and note that there is printing but on a relatively small scale and associated with 3D printing of denture moulds. This activity does not emit volatile organic compounds of large quantities. There is coating but on the basis of small-scale glazing and polishing and there is use of a curing furnace, but of a small domestic scale used for small items being denture moulds. [37-38]
See also:
- Guide to Planning Appeals: Characterisation of use, Industry
3. Modification to restrictive covenant will substantially injure beneficiaries
The Supreme Court held in 210 Hawthorn Road Pty Ltd v Ellinson & Ors [2024] VSC 61 that the modification of a single dwelling covenant to allow five dwellings will substantially injure persons entitled to the benefit of the covenant.
It may be recalled in an earlier decision involving the same covenant, 196 Hawthorn Road Pty Ltd v Duszniak [2020] VSC 235, the Court held the restriction was on-going.
In finding the proposed modification of the covenant would substantially injure the beneficiaries, it considered that:
- in assessing whether there will be substantial injury, the Court must compare the intended benefit to be conferred, and actually conferred by the covenant, with the benefits that remain after the proposed modification;
- this finding is made having regard to the fact that what is approved under a planning permit may change;
- the covenants on the Grandparent Title were not established on an ad hoc or piecemeal basis, indeed the original covenantor intended to protect Walworth Avenue from high density development;
- the Plaintiff’s submission that the neighbourhood should not be characterised as low density is rejected having regard to surrounding development;
- the single dwelling restriction or convention has not been widely ignored or varied on the Grandparent Title;
- the quiet character of Walworth Avenue would be disrupted by increased pedestrian and vehicular traffic, notwithstanding the proposed plans provide for underground parking; and
- the proposed modification would create a precedent for modification of the covenants – this is not a case where the horse has bolted.
See also:
- Guide to Planning Appeals: Restrictive covenant – Supreme Court cases
4. Co-located telecommunications facility (monopole) approved
The Tribunal remarked in Ventia Pty Ltd v Whittlesea CC [2024] VCAT 173 that “Unusually, the proposal is for a facility which includes, at its inception, the co-location of equipment for the three main telecommunication carriers – Optus, Vodaphone (TPG Telecom) and Telstra”.
The co-located facility was to replace two separate towers nearby. Notwithstanding, the Council refused the application due to the development presenting an unacceptable visual amenity impact to adjoining properties.
Whilst Council submitted that it supports the opportunity for greater network connectivity, it considers there is a need to balance the provision of upgraded facilities and protecting the amenity from such a visually intrusive structure. Council further submitted that an acceptable balance has not been achieved due to the inappropriate location and visually intrusive appearance in proximity to dwellings in a residential zone.
In setting aside the Council’s decision, the Tribunal stated:
By virtue of its height relative to its surroundings, the monopole will be a prominent element on the skyline when viewed from adjacent dwellings and within the public realm, such as within Japonica Street and Plenty Road. However, we find the monopole to be a benign structure. By this we mean that it is not created to draw attention to itself – it contains no moving parts or lights and will be finished in a subdued grey colour. There will not be people regularly coming and going from the compound. Whilst the eye might be drawn to it by virtue of its discordant height, one’s gaze would not likely linger. As such, it is a feature that would readily be absorbed as part of the robust, utilitarian setting of the major road intersection in which it is to be located.
We find there will not be any unacceptable public realm amenity impacts. The only adverse impact on the amenity of the area is the visibility from 31 and 33 Japonica Street. [43-44]
In balancing decision making in favour of net community benefit, the Tribunal found:
- the planning scheme supports the provision of telecommunications facilities with minimal impact on the amenity of the area;
- the planning scheme seeks to facilitate an effective state-wide telecommunications network, including its orderly development, extension and maintenance;
- the planning scheme seeks to ensure that the telecommunications needs of business, domestic, entertainment and community services are met; and
- there is an identified need for this proposal to locally replace recently removed and soon to be decommissioned services in this community, a fact which is not disputed by any of the parties to this proceeding.
See also:
- Guide to Planning Appeals: Telecommunications facility > Co-location, Visual impact
5. Supreme Court upholds Tribunal definition of ‘materials recycling’
It may be recalled that in Mobius Materials Recovery Pty Ltd v Kingston CC [2023] VCAT 575 (editorial comment VCAT Vol 10 No 10) the Tribunal held the use of the land to process surplus materials in the form of coarse mulch is defined as Material recycling as found in the Victoria Planning Provisions.
In Kingston City Council v Mobius Materials Recovery Pty Ltd [2024] VSC 134, the Responsible Authority challenged the Tribunal’s decision. It argued that:
- the Tribunal had given insufficient reasons for its determination that the transfer station condition had been met;
- the coarse timber mulch was not ‘surplus materials’ for the purposes of the Transfer station definition because as a valuable product it ceased to be surplus;
- the temporary storage of coarse timber mulch was a part of the process of Materials recycling use and therefore could not be a separate use ‘in conjunction with’ the Materials recycling use;
- the coarse timber mulch was not ‘recycled or used elsewhere’ for the purposes of the definition of Transfer station because it was on the land for the purposes of processing; and
- the finer grade mulch was an end product and could not be described as ‘surplus materials’ and so neither its temporary storage or ‘use elsewhere’ could be relied upon to meet the definition of Transfer station.
In response to each contention, the Court held that:
- The Tribunal’s reasons deal with the specific contentions which were before the Tribunal;
- There was no reason to construe the phrase ‘surplus materials’ differently in the Materials recycling definition and the Transfer station definition – if the coarse timber mulch is ‘surplus materials’ when it is being processed, as the Council accepts it was, then it simply makes no sense to suggest that it is not ‘surplus materials’ because its temporary storage is for the purpose of processing;
- ‘Temporarily store’ in the definition of Transfer station describes the same activity as ‘store’ in the definition of Materials recycling;
- Each of ‘collect, consolidate, temporarily store, sort or recover’ in the definition of Transfer station are preparatory activities ‘before transfer’ for disposal, recycling or use. In the case of ‘store’ this is emphasised by the use of the adverb ‘temporarily’;
- By way of contrast ‘dismantle, treat, process, store, recycle, or sell’ are in effect forms of ‘disposal, recycling or use’; and
- Thus properly construed ‘store’ in the definition of Materials recycling does not include ‘temporary storage’ prior to transfer for use but connotes something more permanent.
- The planning scheme specifically contemplates Materials recycling being in conjunction with a Transfer station and the definition of ‘in conjunction with’ is referrable to two uses on the same land. If ‘elsewhere’ meant other than on the land then arguably a Materials recycling facility could never be in conjunction with a Transfer station.
See also:
- Guide to Planning Appeals: Characterisation of use, Materials recycling
6. Extension to 16-year old permit granted
It is highly unusual for a 16-year old permit to be granted another extension, however this is what occurred in Sixty High Pty Ltd atf Bonadio Family Trust No 5 & atf Mercuri Investment Trust v Darebin CC [2024] VCAT 259.
The permit granted in 2006 was for an 11 storey mixed use building in the Preston Major Activity Centre. The Council refused the Applicant’s eighth extension for a permit.
The Applicant explained the difficulties associated with commencing the development, which included complex contamination issues identified during an environmental audit and the COVID pandemic and significant cost rises. In addition, the Tribunal was informed the developer was negotiating with a social housing provider.
In considering the criteria established in Kantor v Murrindindi Shire Council (18 AATR 285) and AMV Homes Pty Ltd v Moreland CC [2015] VCAT 1699, the Tribunal held that:
- Whilst it is recognised that a modern day permit issued under the present controls may result in dwellings afforded additional internal amenity due to the introduction of BADs and ESD assessment, it was satisfied that the internal amenity afforded to the existing approved dwellings would not be so detrimental that it would warrant the refusal of the extension of time request;
- Whilst little physical buildings have progressed since prior to Covid-19 pandemic, it was considered that the project has not been abandoned or neglected and therefore warehousing was not a significant factor;
- The particular contamination issue and process for environmental audit leads to an extenuating circumstance and a genuine reason for an extension of time; and
- The extension of time could not be approved on the basis that social housing may be delivered on the site, however given the material submitted to the Tribunal, including the MOU, is encouraging and demonstrates a commitment to realise the project. By pivoting from private housing to social housing shows a willingness to complete the project and craft a way to make it happen.
As to impact of the COVID pandemic, the Tribunal stated “If this was the only intervening factor put to me, I may have formed a different view.”
The Tribunal stated that with the significant amount of time that had elapsed,:
Whilst naturally decision makers will be uncomfortable with extending a permit originally issued in 2006, but when considering Kantor principles more broadly, I do not consider that the total time elapsed is fatal to the extension of time request given current planning policy directions will be achieved. [58]
See also:
- Guide to Planning Appeals: Permit > Extension to permit
7. Tribunal’s jurisdiction to approve a Development Plan
In Parklea Berwick Pty Ltd v Casey CC [2024] VCAT 287, the following legal question was considered by the Tribunal:
- Does the Tribunal have jurisdiction to consider the application under Section 149(1)(a) of the Planning and Environment Act 1987 (P&E Act) where a responsible authority has expressed satisfaction with a Development Plan?
The Applicant submitted that applying section 149(1)(a) of the P&E Act to the relevant facts in this proceeding, the Tribunal has jurisdiction to hear the proceeding because:
- The Applicant, as a developer of land directly affected by the matter, is a “specified person”;
- Council, acting as a responsible authority, is a “specified body”;
- the “decision” of a “specified body” here was the Council decision on 16 May 2023. That is the decision under review.
- Clause 43.04-2 states that a permit must not be granted until a development plan has been prepared to the satisfaction of the Responsible Authority.
In supporting its submission, the Applicant referred to three cases, Glenavon Pastoral (Vic) Pty Ltd v Golden Plains SC (Red Dot) [2005] VCAT 1095, Jocelyn Meadows Pty Ltd v Casey CC [2004] VCAT 2627 and Camberwell Grammar School v Boroondara CC [2019] VCAT 1449.
Council did not provide a submission on the legal question, but baving heard the Applicant’s submissions, submitted the issue of the Tribunal’s jurisdiction is relatively ‘straight forward’: it can be satisfied of it; it can consent to it; or it can approve it. In addition, a council can be dissatisfied with a development plan such as to refuse it or fail to make a decision within the prescribed time.
In consideration of its jurisdiction, the Tribunal was satisfied that Council has:
- made a ‘decision’ in relation to a ‘matter’;
- the ‘decision’ is to approve the Manuka Road Development Plan;
- the ‘matter’ is the Manuka Road Development Plan;
- the Manuka Road Development Plan must be done (or prepared) to Council’s satisfaction; and
- the Council was satisfied of the Manuka Road Development Plan and approved it on 16 May 2023.
Hence, the Tribunal answered the question in the affirmative.
Once jurisdiction is established, it is then at large and notably, section 84B of the P&E Act sets out what the Tribunal must consider in determining the application for review. However, given the number of changes sought to that document by each party, the Tribunal considered whether it could make orders that set aside Council’s decision on and substitute its own decision, if it was not satisfied that varying the decision is appropriate.
Having regard to a number of authorities, including Secretary, Department of Environment, Energy and Climate Action v Hanson Construction Materials Pty Ltd [2023] VSC 353, Mond v Perkins Architects Pty Ltd [2013] VSC 455 and ID-FLK Gisborne Pty Ltd Macedon Ranges SC (Red Dot) [2019] VCAT 1336, the Tribunal held:
Simply expressed, VCAT has the power to consider an alternative version of a Development Plan in order to properly exercise its functions on review. This means that it can allow, in its discretion, a party to file or produce an alternative version of the Development Plan at any time in the proceeding as part of that process. [32]
In exercising its powers, the Tribunal refused to approve the Development Plan. Its concerns included:
- It disagreed with the drafting approach in the approved Development Plan, finding that it is not reflective of what is required by the Development Plan Overlay Schedule 24 and, in effect, overreaches into seeking to control matters that should be left to the discretion of the responsible authority when a future planning permit application is lodged;
- It found that no version of the Development Plan contains all of the information required by the DPO24. In the absence of the provision of that information, it was impossible to approve any version of the Development Plan;
- It was not concerned about the utilisation of a table listing the required reports and assessment as ‘background documents’ so long as the conditions content of these reports is incorporated into the Development Plan. All versions of the Development Plan adopt this approach, however, no version incorporates all findings or conditions or recommendations of each of the ‘background documents’ or states that there are no findings or conditions or recommendations in such document; and
- It did not support the use of standardised headings that do not reflect the headings in the DPO24. To this end, it disagreed with the drafting in the approved Development Plan and support the October Draft, to the extent that it reflects the requirements as headings in the DPO24.
Further, the Tribunal expressed concern with elements of the Development Plan, including tree management, defendable space to address bushfire risk, lot layout, drainage and some road and car parking issues.