VCAT Volume 11 No 5

1. What if the RA gives you only a 12 month extension to a permit but you requested two years?

This was the question to be determined in Mahmood v Merri-bek CC [2023] VCAT 1183. Three previous extensions to the permit for multi-dwellings had been granted, but this was the first request by the new owner of the land.

Council submitted the Tribunal should follow the reasoning in Victton Pty Ltd v Melbourne CC [2020] VCAT 1233 because it has approved the request to extend the time and has not either failed to make a decision nor refused the application for an extension of time.

The Applicant submitted that Victton stands for the proposition that the Tribunal is deprived of jurisdiction even if Council decides to extend the commencement and completion of development by one day, which the Tribunal interpreted as meaning that such a decision would be tantamount to a refusal of the request for an extension of time.

Having considered the facts in the proceeding, and the submissions of the parties, the Tribunal concurred with the reasoning in Victton and its determination that the Tribunal does not have jurisdiction to consider the application for the following reasons:

  • there was no decision by Council to refuse the extension of time. Such a decision would invoke the Tribunal’s jurisdiction under section 81(1)(a) of the Planning and Environment Act 1987 (P&E Act);
  • there was no decision of Council failing to extend time within one month after the request for an extension of time was made. Such a decision would invoke the Tribunal’s jurisdiction under section 81(1)(b) of the P&E Act; and
  • the decision of Council was to approve an extension of time to commence and complete development under the permit. There is no provision under the P&E Act that allows for a review of a decision of a council to approve an extension of time to commence and complete development for a different period than was sought.

See also:

  • Guide to Planning Appeals: Permit > Extension of time

2. Is a food truck stop a food and drink premises?

In Unique Food Trucks Pty Ltd v Wyndham CC [2023] VCAT 1205, application was made for a food truck stop and ice cream shop on a former car dealership site in the Industrial 3 Zone (IN3Z).

Council was opposed to the application. Its grounds of refusal generally relate to the proposal’s inconsistency with the purpose of the IN3Z and the loss of land for industrial use. Council was concerned the proposal is excessive for the site and that it will generate unreasonable levels of traffic congestion, public safety, and local business viability issues. More particularly, Council considered the proposal does not provide adequate car parking for staff and customers and ‘end-of-trip’ shower and change room facilities associated with bicycle parking. Overall, Council considered the proposal does not contribute towards the orderly planning of the area.

An objector to the application, Craig Planner (true), is the owner/operator of a nursery/café/function centre that abuts the site to the west. He is concerned the proposal will conflict with the operation of his business, particularly with regard to lack of on-site parking, toilet facilities and conflict with his function centre which also operates in evening periods with competing demand for on-street parking and potential for parking conflict and traffic safety issues.

Council submitted the proposal for 12 separate food trucks and an ice cream shop was equivalent to 13 separate uses occurring on the site with an intensity of use not envisaged under the planning scheme. It contended that the proposal for multiple food trucks on the one site was not a type of take away food operation envisaged under the planning scheme and that the proposal should be considered as an innominate use.

In rejecting Council’s submissions on this matter, the Tribunal stated:

I do not accept this argument. Take away food premises is listed as not requiring a permit for use under the IN3Z. There are no conditions limiting its activity or location and the definition places no limits on the scale, intensity or on the number of take away food options that may be available on the land.

The proposal, as amended, now does not intend to provide for on-site dining or for on-site consumption of food and drink. Up to 10 seats may be made available for consumption on-site. This is provided for under the definition for a use that does not require a permit.

I find the proposal, as amended and described by the applicant, is for take away food premises and that a permit for use is not required. [40-42]

The Tribunal set aside Council’s decision. In relation to the industrial zoning of the land, the Tribunal considered that, if no permit is required for use given take away food premises does not require a permit for use under the IN3Z, policy references on the use of land for industrial purposes and for commercial land uses located outside of activity centres becomes somewhat irrelevant because there is no permit trigger under the zone to bring such policies into consideration.

See also:

  • Guide to Planning Appeals: Characterisation of use, Take away food premises

3. What compensation are you entitled to if there has been a previous payment?

In a complex compensation case considered by the Supreme Court in Kingston v Head, Transport for Victoria; Jomaring Pty Ltd v Head, Transport for Victoria [2023] VSC 618, the Court found that section 41(5) of the Land Acquisition and Compensation Act 1986 (LAC Act) is engaged in the proceedings, such that the compensation payable in respect of the present acquisitions (the relevant date being 29 March 2019) should be reduced due to the previous payments received by the previous claimants in 1984.

The subject land involved land required for the construction of the (now completed) Mordialloc Freeway.

In ascertaining whether section 41(5) of the LAC Act is engaged, the Court identified three questions to be determined:

  • Was compensation previously paid? – in issue is whether the payments made in 1984 ($166,680 and $366,000) were compensation or whether the monies paid should be properly characterised as something else.
  • Was compensation paid in respect of the land? – the land subject of the compensation needs to be identified. A comparison of the land for which compensation was paid and that land for which compensation is now to be paid under the acquisition needs to be conducted.
  • Was compensation made pursuant to Part 5 of the P&E Act – the previous monies paid must be capable of being classified as compensation paid pursuant to Part 5 of the P&E Act. Given the complicated legislative history concerning section 41(5) of the LAC Act, the question of whether the amendment to that provision made in February 1988 reflects a re‑enactment of the relevant legislation at law is to be considered – this turns on section 16(b) of the Interpretation of Legislation Act 1984 (ILA).

In respect of the first question, the Claimants argued that the previous payments are not to be properly characterised as payments of ‘compensation’ within the meaning of section 41(5). It was submitted that the previous payments were made pursuant to contract between parties as “a commercial matter to resolve the disputes between them”. However, in rejecting these submissions, the Court considered it is commonplace in land valuation compensation claims that a settlement of the claim is made following a negotiated process, rather than proceeding to a formal award. It stated: “There is just no evidence at all that there was any other claim in issue between the RCA and the Previous Claimants to be settled, which could be implied in the deed of release and the circumstances of the execution of the releases.”

In respect of the second question, the Court held it “was not in controversy“ that the lands in relation to the previous payments were made were constituted of the same lands which became (though in smaller form) the relevant acquired land.

In respect of the third question, the Claimants argued that the previous payments were not so paid – the P&E Act did not exist at the time the previous payments occurred. This necessitated analysis as to whether the relevant provisions were contained in the repealed Town and Country Planning Act 1961. The Court held:

In all the circumstances, the P&E Act represents a re‑enactment of the majority of the provisions of the TCP Act which pertained to planning matters, other than those that were inconsistent with the new more standardised and centralised system. This includes the matters regarding the assessment of compensation for planning blight in ss 41 and 42 of the TCP Act, which were re‑enacted (being modified and split into a greater number of sections) as the various provisions of Part 5 of the P&E Act, and in particular I note ss 98, 99, 102, 104, 106, 108, and 110 (further to what was described above at [192]). Section 43 of the TCP Act was re‑enacted with modifications as ss 111 and 112 of the P&E Act. [208]

Nor did the Court find a contrary intention which would override section 16(b) of the Interpretation of Legislation Act 1984.

See also: 

  • Guide to Planning Appeals: Compensation 

4. Being self-evidently correct

In yet another proceeding involving procedural issues concerning a proposed multi-level mixed use building in the Chapel Street Major Activity Centre, the Tribunal convened by the President in Box v Stonnington CC [2023] VCAT 1258 has dismissed an application by an objector that the Tribunal be reconstituted by the addition of at least one and preferably two sessional members who are specialist scientists.

The basis of the application was that a proper examination of the project’s compliance with the ESD principles requires an understanding of the science and computer modelling underpinning the tools on which the Applicant relies. Only then, it was argued, will VCAT be in a position to identify the flaws that purportedly exist in those tools.

Further submissions not in the original application made by the objector was the need for Tribunal member judicial independence, which is questionable given the appointments of members on the basis of fixed renewable terms which is contrary to the independence of a “court of a State”.

On the ‘serious’ question of judicial independence, the President observed that:

The difficulty with Dr Kirkham’s submission on this issue and, indeed, his submissions more generally, is that they proceed on the assumption that every proposition he advances is self-evidently correct. It follows that a failure to recognise that reality can only be explained by ignorance born of a lack of training, skill or comprehension, or something potentially more nefarious. [39]

The President was satisfied that it is well within the skill and experience of the presiding member to properly assess questions of relevance and, more particularly, bring an independent mind to any questions of the relevance of what was asserted are the political issues in the proceeding, and (if required) asses the reliability of any evidence that might be said to be infected by those issues.

On the question of the need for scientific qualifications, the President asserted all the member is required to do in this context is:

  • receive and assimilate the factual and expert evidence on the extent to which the proposal realises the principles of ESD stated in the planning scheme;
  • assess the weight and reliability of that evidence, including by critically examining any tools or models (such as the Green Star Scheme) on which the expert evidence relies;
  • receive relevant submissions on the reliability of the evidence; and
  • make the determination referred to above and provide reasons.

The President made it clear that it was not incumbent on the member to reach beyond the evidence adduced in the proceeding by, for example, undertaking his own qualitative and quantitative assessment of whether the proposal realises the principles of ESD identified in the planning scheme.

See also:

  • Guide to Planning Appeals: Appeals > Reconstitution of Tribunal

5. Strategic justification for an additional supermarket

In 723 Calder Highway Maiden Gully Pty Ltd v Greater Bendigo CC [2023] VCAT 1244, the Tribunal has supported a proposed supermarket and speciality shops in the Maiden Gully Town Centre, which is identified in the Maiden Gully PSP.

Objections were received from owners of two nearby supermarkets, albeit one of the supermarkets had not commenced use despite a permit granted in 2016.

Council was opposed to the application, but its concerns related to traffic and car parking. Local residents also objected to the proposal on amenity, traffic and car parking grounds.

In assessing whether the strategic justification exists for the proposal, the Tribunal considered competing economic evidence on whether the proposed supermarket would result in excessive supply of retail floor space.

However, the Tribunal was mindful about the section 1 categorisation of the use, stating that “the importance of a shop being a section 1 permit not required use in the Commercial 1 zone must not be overlooked when undertaking a balanced consideration of competing planning scheme provisions.”

In relation to the existing permit for the yet to be developed nearby supermarket, the Tribunal noted “its existence is not something that can reasonably be relied on to preclude the consideration of a similar “as of right” use in the Commercial 1 zone in a different part of the activity centre.”

It also observed the fact the permit had not been acted upon was also relevant, though stated that” the existence of the permit is not however a factor that persuades me to depart from my conclusion that the approval of the current proposal will contribute to the satisfactory implementation of the Council’s strategic objectives.”

Overall, the Tribunal found:

  • In addition to the review site’s Commercial 1 zoning and its designation as a Large Activity Centre (Future) the review site exhibits a number of characteristics that render it suitable for the development as proposed. These characteristics include:
    • It is a large, consolidated site with three street frontages including to the Calder Highway service road. It is a relatively unconstrained site and does not have immediate sensitive land use abuttals.
    • The site assumes a prominent location within the activity centre and consequently its development will contribute to the following relevant policy objectives:
    • It will concentrate major retail uses in a location that is highly accessible to the community.
    • It will contribute to growth and diversification giving communities access to a wide range of goods and services.
    • It will facilitate development of an expanded supermarket offer as the Maiden Gully Northeast growth area is developed.
  • Because of the above factors the proposal will advance the objectives of the ten minute neighbourhood. [75]

The Tribunal was also satisfied that traffic and car parking issues had been satisfactorily addressed.

See also:

  • Guide to Planning Appeals: Supermarket

6. More on the National Trust principle and the extent of the Tribunal’s jurisdiction

It may be recalled that in Myers v Southern Grampians SC (Red Dot) [2022] VCAT 695 a legal determination was made that:

  • the Tribunal did not have jurisdiction to consider the application for review under DDO‑6, having regard to the exemption from notice and objector appeal rights under that provision and section 82(3) of the Planning and Environment Act 1987 (P&E Act); and
  • the Tribunal, in considering the proposal overall, must take the grant of the permit under DDO‑6 as a matter that has been established. The weight to be given to the grant of a permit under DDO‑6 in the consideration of the ‘cover‑all’ permit is a matter for the Tribunal.

In Myers v Southern Grampians Shire Council [2023] VSC 658, the Appellants sought leave in the Supreme Court on the following two questions:

  • If the Tribunal was correct in finding that it did not have jurisdiction to consider whether the permit application the subject of review complied with the DDO‑6, did the Tribunal err in making a decision which had the effect of varying the Council’s decision under the DDO‑6.
  • Alternatively, whether the Tribunal erred in finding that it was not required or permitted to independently consider whether the application under review complied with the requirements of the DDO‑6 in the Southern Grampians Planning Scheme.

In granting leave, the Court accepted that the correct approach to integrated decision-making has been the subject of controversy and inconsistency of approach by the Tribunal, particularly where an application has been brought by an objector in an omnibus application in circumstances where a planning permission is exempt from objector appeal rights.

However, the Court held the Tribunal was not in error in its approach to the legal analysis, nor its application of that analysis to the decision or decisions on review before it. In summary, it found that:

  • In taking into account the relevant considerations required by the P&E Act, in particular by section 84B including the effect of Clauses 65 and 71.02, considerations relevant to an integrated decision-making approach do not extend the jurisdiction of the Tribunal to allow it to consider afresh the merits of the DDO-6. That decision of the responsible authority was ‘a given’. However, in exercising its discretion in respect of the permit triggers that were before the Tribunal, the DDO‑6 permission was a relevant consideration. What weight the Tribunal afforded the DDO‑6 permission was a matter for the Tribunal.
  • Neither an order amending the application plans, nor an order requiring changes to the plans to be endorsed by the responsible authority as part of the merits determination by the Tribunal, has the effect of varying a decision of the responsible authority which was not before the Tribunal (here the DDO‑6 decision of the responsible authority).
  • In an application where there are multiple permit triggers for a proposal overall, but the permission under review pursuant to the P&E Act and the Victorian Civil and Administrative Act 1998 (VCAT Act) is limited by operation of the exemptions applying to the review, the ambit of the Tribunal’s review enquiry will be restricted to the non‑exempt provisions. This approach is not inconsistent with integrated decision-making on the proposal overall. The respective decisions in Sweetvale Pty Ltd v Victorian Civil and Administrative Tribunal [2001] VSC 426; (2001) 18 VAR 411 — Sweetvale Pty Ltd and Anor v Victorian Civil and Administrative Tribunal & Ors [2003] VSCA 83 and Boroondara City Council v 1045 Burke Road Pty Ltd [2015] VSCA 27 are not inconsistent and can be read together as establishing an approach to the proper consideration of multiple permissions, but recognising the Tribunal’s jurisdictional limitations on review where there are exempt provisions in play.

It is worth noting that because of the Tribunal’s lack of jurisdiction in relation to DDO-6, the Court stated that its Order amending the plans only have force and effect to the extent of the application before it; namely the Rural Living Zone and Schedule 3 to the Environmental Significance Overlay. A consequence of this is a potential inconsistency between the plans upon which the Council made its decision under DDO‑6, and the amended plans in relation to the RLZ and ESO‑3.

Whilst acknowledging the observation made by the Appellants that with the benefit of hindsight, the ‘proper legal course’ of the proceeding would not have dealt with a Notice of Decision for the proposal as a whole, the Court was not persuaded that this is the only way in which multiple permissions within an omnibus permit application must be dealt with. It stated:

… I do not consider the effect of the amended plans being considered in the context of a limited review had the jurisdictional deficiency argued by the appellants.[110]

The Court noted that any inconsistency between the amended plans the Tribunal refers to in Condition 1, and the plans the Council referred to in its Notice of Decision can be remedied by:

  • the permit applicant seeking to amend the DDO-6 permit plans under section 72 of the P&E Act; or
  • by lodging plans in accordance with Condition 1 of the Council’s Notice of Decision which provides for amended plans to the satisfaction of the responsible authority.

See also:

  • Guide to Planning Appeals: National Trust Principle > Relevance of specific clauses and decision guidelines in the planning scheme with control trigger

7. Melbourne’s Telstra Pay Phone signage – another twist in the tail

In what has been a heavily litigated matter over a number of years, the Supreme Court found in Melbourne City Council v JCDecaux Australia Pty Ltd [2023] VSC 665 that the Tribunal erred in JCDecaux Australia Pty Ltd v Melbourne CC [2022] VCAT 248 in finding a permit was not required for the use and development of 47 single payphone cabinets incorporating a Telstra payphone, fixed and mobile communications network connections together with a 32” LCD screen on one side of the structure and on the other side a 75” LCD screen which is intended to display commercial advertising signage.

Prior to the Tribunal’s consideration of the matter, Amendment VC266 had been gazetted. This Amendment made changes to the Victoria Planning Provisions in all planning schemes across Victoria, including clauses 52.19, 62.01 and 62.02‑1.

Council contended that as a consequence of the changes introduced by Amendment VC226, there was no longer any exemption under the MPS that exempted buildings and works associated with a Telecommunications facility from the need to obtain a permit under other relevant provisions of the Melbourne Planning Scheme (MPS), including clauses 52.05, 37.04 and 43.01, if the requirements of clause 52.19 were met. The Court agreed with Council, stating that:

I accept that the differences between the operation of clause 52.19 prior to Amendment VC226 (which was the context in which the March 2022 Orders were made) and that which applied before the Tribunal in June 2023 was different and required a fresh look at the provisions of the planning scheme and the consequential permit triggers.

There is no concept of ancillary development. The terms ‘use’ and ‘development’ are used disjunctively in the Planning Act and are well understood as separate concepts. As Cavanough J states in APN Outdoor:

[28] First, the respondent submitted that the Act uses the terms ‘development’ and ‘use’ disjunctively. They are two distinct concepts with no overlap between them. The ongoing display of a sign after it has been erected must therefore be either development or use but cannot be both at the same time. This was common ground between the parties, and I agree that it is correct.

[29] Second, the respondent submitted that the concept of use refers to the purpose for which a development is used and not to the physical structure of the thing developed itself. I also accept this proposition.

The appellant submitted that these propositions are correct and there is a fundamental separation between ‘development’ and ‘use’ such that the characterisation of the use does not determine the task of analysing what development permissions are required because they are fundamentally different things. [27]

I agree. [46-49]

At the conclusion of the hearing the Court made orders granting leave to appeal and allowing the appeal, setting aside Orders 2 and 3 of the June 2023 Orders with the Appellant to provide a schedule setting out each application and permit required for the construction and/or putting up for display of a sign, pursuant to the applicable provisions of the MPS.

See also:

  • Guide to Planning Appeals: Telecommunications facility, Advertising signs

8. Balancing heritage and other considerations in a World Environs Heritage Area

In Royal Garden Manor Pty Ltd v Melbourne CC [2023] VCAT 1271, the Tribunal upheld a Council refusal to construct a part three, five and eight storey mixed use building at the north-west corner of Rathdowne and Victoria Streets, Carlton. The site is part of the World Environs Heritage Area (WHEA) associated with the Royal Exhibition Building.

The site currently forms low-rise building form. It once accommodated the Queens Coffee Palace that was constructed on part of the review site around 1889/90s and demolished around 1970/1.  The Applicant referred to this former building commenting that this site historically included a taller building form for much of the life of the Royal Exhibition Building and Carlton Gardens. However, the Tribunal found the existence of the coffee palace building from about 1890 to about 1970 to be of interest but not a matter that underpins the planning provisions that apply to the land.

While the site is in a WHEA, the Tribunal noted it is in the Mixed Use Zone that includes an objective to provide for housing at higher densities, and that local policy for this part of the Melbourne municipality is identified in an area where population growth is expected to be modest and there is specific direction to maintain a strong contrast in scale between the Hoddle Grid south of Victoria Street and Carlton.

In weighing up the competing policy considerations, the Tribunal stated:

As a balancing exercise we find the weight of policy and provisions for this site weigh more heavily toward maintaining a low to medium rise character, consistent with the heritage significance of sites in the WHEA area. While all sites should be used to their full potential, the planning scheme directs that in this location this potential is constrained. The planning scheme places greater emphasis on employment and accommodating housing growth in other parts of the municipality. (74]

Overall, the Tribunal’s findings were summarised as follows [at 6]:

  • The heritage and urban design policy weighs heavily against the review site’s potential derived from its proximity to the centre of Melbourne and the services of the area.
  • We find the exposure of the 8 storey form, and the forecourt facing Rathdowne Street, to be discordant elements that are contrary to the design objective in DDO6 and in policy at clause 11.03-6L-02 to reinforce and respond to the built form character of the area as being essentially of low-rise buildings around the CG.
  • We find the height, combined with the breadth of the building at its corner of Rathdowne and Victoria Streets too dominating for its location. This is particularly when viewed from Rathdowne Street, where the view will include the exposed 8 storey form to the north side of the ‘corner’ form, facing the forecourt.
  • With a reduced corner building height we find there is the need to better recess the upper levels behind this corner when viewed from both Rathdowne and Victoria Streets to accord with the objectives of DDO6 and associated design and heritage policy. The streets require different responses according to their sensitivity.
  • We find that the extent of higher building exposed to Rathdowne Street, while less in the northern section of the building, remains too abrupt for the lower rise surrounding built form and the low rise urban character sought for this area.
  • In Victoria Street we find a 4 storey street wall at the western end of Victoria Street with a 5 metre setback to upper form could be a reasonable outcome to an overall lower building form, more in keeping with the design objectives of DDO6, acknowledging that policy of the planning scheme provides for medium rise development in Victoria Street.
  • We are satisfied that the loss of glimpses and partial views of the REB flagpole, dome and drum from McKenzie Street are acceptable in context of the DDO6 provisions and the existing adopted WHEA management plan.
  • We do not make a definitive finding on what a maximum height for a future proposal might be. It will depend on the design response proposed.
  • We are not satisfied that the provision of resident car parking above the maximum provision set out in the Parking Overlay is sufficiently justified.
  • The proposed internal amenity for future occupants has some limitations in use of limited balconies and potentially excessive room depths to some dwellings.

The Tribunal declined nominating an acceptable height for the site, as this will be directed by the form and overall massing of a future building proposal.

See also:

  • Guide to Planning Appeals: Heritage > Weighing up of policy