VCAT Volume 11 No 16

1. How to measure overlooking in B22

An objector to a multi-unit development successfully argued to the Tribunal that a Council’s interpretation on Standard B22 in Clause 55 was incorrect and that more needed to be done to address his concerns about overlooking.

In James v Darebin CC [2024] VCAT 805, a preliminary hearing was held to consider the Council’s application that the Objector’s appeal be summarily dismissed under section 75 of the Victorian Civil and Administrative Act 1998 (VCAT Act).

The proposal was for three two storey dwellings. The subject site abutted the Objector’s property at the rear. The rear elevation of the third dwelling has ground floor habitable room windows and a deck. It was proposed to construct a 1.8 metre high fence on the rear property boundary.

Council sought the matter be summarily dismissed on the basis that that the codified nature of standard B22 in Clause 55 means that this review application is not valid, and this is not a matter to be determined by the Tribunal.  It contended that no further consideration of overlooking from the ground floor of Unit 3 is required because:

  • the floor levels of Unit 3’s ground floor and deck are not more than 800mm higher than the ground level; and
  • a proposed fence to a height of 1.8 metres is shown on the plans.

Paragraph 6 of standard B22 states:

This standard does not apply to a new habitable room window, balcony, terrace, deck or patio which faces a property boundary where there is a visual barrier at least 1.8 metres high and the floor level of the habitable room, balcony, terrace, deck or patio is less than 0.8 metres above ground level at the boundary.

The Council submitted that the wording of this last paragraph and its reference to ‘a property boundary where there is a visual barrier’ means ‘logic dictates that the 1.8 metres is measured at the property boundary’.

However, the Tribunal agreed with the Objector’s submission as follows:

Standard B22, which comprises a definition of how overlooking is to be limited (Paragraphs 1 & 2) and measures to be applied to the design of the building to achieve this (Paragraphs 3-5) does not apply to the habitable spaces of a proposed new development that face a property boundary when two conditions are met:

    1. The floor level of the habitable space facing the property boundary is less than 0.8 m above ground level measured at the boundary i.e. habitable spaces on the ground floor of a proposed development
    2. There is a visual barrier at least 1.8 m high [in relation to what?]

Note:

it does not say that the visual barrier is to be located on the boundary.

it does not say that the height of the visual barrier is to be measured from ground level.

The Tribunal held:

Mr James’ reading of paragraph 6 makes sense. This is particularly so when one considers how overlooking is assessed if the floor level is greater than 800mm above ground level at the boundary. In that circumstance, the overlooking potential is then assessed on the basis of the proposed floor level. Also, standard B22 uses the phrase ‘at least 1.8 metres high’, which suggests the visual barrier may need to be higher. This suggestion is indicative of the need for the visual barrier to be effective and, hence, that it needs to respond to the particular circumstances of the proposal and the adjoining SPOS.

For these reasons, I agree with Mr James that the exemption in paragraph 6 of standard B22 is not achieved in this case. There is no proposed visual barrier to a height of at least 1.8 metres as measured from the floor level, which is the point of measurement contained in paragraph 1 of standard B22. [50-51]

Even if the Tribunal was wrong on its interpretation, it considered Council still has to be satisfied that the overlooking objective is met.

The Tribunal invited the Responsible Authority to reconsider its decision in this proceeding pursuant to section 51A(1) of the VCAT Act.

The Tribunal observed that Council’s interpretation of B22 is based on a common understanding as to what is intended by the content of Clause 55 and its overlooking provision, and that the Objector had looked at this provision with a fresh set of eyes and had demonstrated that ‘the devil is in the detail’ of the wording and construction of Clause 55.04-6. In other words, its application does not accord with the long held understanding and approach often applied by architects and town planners to accord with the standard B22 exemption (i.e. a 1.8 metre boundary fence).

The Tribunal’s decision in this matter has important implications on how planners should approach overlooking in B22.

See also:

  • Guide to Planning Appeals: ResCode > B22 (Overlooking)

2. Section 39 challenge timeframe starts with the date of the Panel direction, not the date of the Panel report

In Rockford Constant Velocity Pty v Melbourne City Council [2024] VSC 343, the Supreme Court dismissed an appeal against a Tribunal decision that considered a section 39 Planning and Environment Act 1987 (P&E Act) challenge to a Panel ruling.  The Panel refused to allow the Appellants an opportunity respond to a submission made by Melbourne Water (MW). The Appellants waited until delivery of the Panel’s report to seek review of the ruling by the Tribunal.

The Panel was appointed to advise on Amendment C384 to the Melbourne Planning Scheme concerning the imposition and alteration of controls and proposed a new Land Subject to Inundation Overlay (LSIO) or a Special Building Overlay (SBO) over certain land within the Arden Structure Plan 2022.

On or about 29 November 2021, the Appellants filed submissions to Am C384. On or about 2 August 2022, their submissions were referred by the Council to an independent planning panel pursuant to section 23 of the P&E Act. The Minister for Planning appointed a panel to hear the submissions and a hearing was conducted in October 2022.

The Appellants relied on written evidence who raised a number of technical questions around the strategic basis and underlying modelling relating to the proposed flooding and drainage controls.

On or about 26 October 2022, the Panel requested that MW file responses to questions raised by the Appellants’ expert witnesses and on 28 October, the last day of the Panel Hearing, MW filed its written response.

On 28 October 2022, the Appellants orally requested an opportunity to respond to MW’s written response. After standing down the proceeding for a short time to consider the Appellants’ submission in this regard, the Panel refused the request, giving oral reasons for its decision. The Appellants requested written reasons for the refusal.

After the Panel Report was made available to them on 10 January 2023, the Appellants lodged an application to the Tribunal on 10 February 2023.

The appeal was brought to the Tribunal under section 39(1) of the P&E Act:

A person who is substantially or materially affected by a failure of the Minister, a planning authority or a panel to comply with Division 1 or 2 or this Division or Part 8 in relation to an amendment which has not been approved may, not later than one month after becoming aware of the failure refer the matter to the Tribunal for its determination.

The Tribunal summarily dismissed the application for review, refusing to exercise its discretion to extend the time.

The question of law before the Court concerned what the expression ‘the failure’ means in the phrase ‘not later than one month after becoming aware of the failure’.

The Appellants alleged that the correct interpretation of section 39(1) is that ‘failure’ in the phrase ‘not later than one month after becoming aware of that failure’ must be read with regard to the effect of that failure on the Appellants (ie. the failure to apply a relevant statutory provision that substantially or materially affected the Appellants).

The Court held that the appeal was required to be filed as soon as the Appellant became aware of the failure to afford natural justice to it.  That is, the right of appeal from the ‘failure’ arose when the Panel made its ruling at the hearing.  This was because the ‘substantial or material’ effect of the failure to accord procedural fairness to the Appellants was known by them at the time at which they were denied an opportunity to make submissions and, as such, was not logically dependent upon them receiving the final Panel Report.

In construing section 39 in its legislative context, the Court considered an important point was the expectation inherent in setting a one-month timeframe. The statute required prompt attention to the procedural defect so that the course can be corrected if necessary, and significant further delay and cost prevented.  The most timely consideration of a procedural defect and the Tribunal’s remedial action, if required, ought take place at the earliest time rather than to permit time and cost being incurred unnecessarily by awaiting the Panel’s report.

The merits impact was not the driving force. Time runs once the applicant gains the requisite knowledge about the alleged defect in procedure.

See also:

  • Guide to Planning Appeals: Planning schemes (Amendments to planning schemes) > Section 39 reviews

3. Relevance of Aboriginal cultural heritage in a solar farm application

What is the relevance of Aboriginal cultural heritage for a solar farm application when a Cultural Heritage Management Plan (CHMP) is not required and there are no explicit permit triggers requiring consideration of Aboriginal cultural heritage?

In Paterson v Minister for Planning [2024] VCAT 761, which involved an application for a 4.99 megawatt (MW) solar energy facility, utility installation and ancillary infrastructure with the removal of native vegetation on a 53 hectare property in the Farming Zone, a neighbouring objector raised concerns about impacts on Aboriginal cultural heritage (amongst several other issues, including need, landscape impacts, visual impacts and compliance with policy).

In addressing the question of relevance of Aboriginal cultural heritage, the Tribunal decision provides detailed analysis on relevant and irrelevant consideration and the question of weight. It stated:

The relevance of issues in a planning application is never clear cut. The relevance of issues will depend upon the nature of a particular proposal, the context of the particular site and its surrounds, and the content of the PPF. [11]

 And further:

Overall, it is ultimately a question of weight rather than relevance, weight being a matter for the ultimate decision-maker. This is a question of planning discretion rather than legal interpretation. [163]

The Tribunal considered that Aboriginal cultural heritage policy is relevant given Clause 15.02-3 (Aboriginal cultural heritage) and Clause 53.13-3 (Renewable Energy Facility Other Than a Wind Energy Facility). This latter clause calls up the Solar Energy Facilities Design and Development Guideline October 2022 (the Guidelines). This clause lists the decision guidelines the responsible authority ‘must consider as appropriate’ for a solar energy facility, including:

  • The Municipal Planning Strategy and the Planning Policy Framework
  • The aforementioned Guidelines
  • Aboriginal cultural heritage as per the Guidelines.

The Tribunal stated:

In this case, the site is located in a farming area and there is a recognised area of Aboriginal cultural heritage located approximately 440 metres northeast of the portion of the site’s northern boundary where this solar energy facility is proposed. The Aboriginal cultural heritage policy at clause 15.03-2S sets out the objective and strategies to be achieved throughout Victoria. The MPS specifically recognises Aboriginal cultural heritage and promotes its protection and conservation. The parties recognise there are traditional owner values associated with this recognised area about 440 metres from this site, and that the broader surrounds warrant consideration under the Aboriginal cultural heritage planning policy at clause 15.03-2S. Of particular relevance to this consideration is this clause’s objective ‘to ensure the protection and conservation of places of Aboriginal cultural heritage significance’, and the strategy ‘to provide for the protection and conservation of pre-contact and post-contact Aboriginal cultural heritage places’. I agree with the parties that consideration of this policy is of relevance in this case. This is so given the circumstances where there is no mandatory CHMP required, but it is known that the Registered Aboriginal Party (the RAP) considers the context of the recognised grinding groove area has significance within the broader landscape. The RAP also considers there is a high likelihood that other archaeological surface or subsurface deposits are present in the landscape. [38]

As to the weight that should be given to Aboriginal cultural heritage will depend on the circumstances of the particular proceeding, with the Tribunal noting that:

  • there is no planning permission required under a particular control, so policies related to that control/issue are not relevant; and/or
  • there are no references in the purpose or the decision guidelines of a particular control to the issue being raised, therefore planning policy sought to be relied upon about that issue is not relevant.

Further, the Tribunal noted that Aboriginal cultural heritage is primarily regulated through other legislation.

Having regard to the legislative framework and the evidence provided to the Tribunal, the Tribunal concluded whilst Aboriginal cultural heritage was relevant the proposal should not be refused on this policy ground. It held:

  • In this case there is no prerequisite for intangible heritage values to be dealt with before a permit is granted.
  • No mandatory CHMP is required for this solar energy facility.
  • A permit can be granted even if a voluntary CHMP is being prepared and not yet finalised for this proposal.
  • A permit can also be granted even if there is no voluntary CHMP.
  • It is not for this Tribunal or a Responsible Authority to consider and determine the merits of a proposal based on Aboriginal intangible heritage. The consideration of this can only be achieved by engaging with the Traditional Owners.
  • For these reasons, there is no legal barrier to the grant of a permit for this proposal.
  • Furthermore, in the circumstance where there is other legislation protecting Aboriginal cultural heritage both in terms of the tangible and intangible heritage values, the Tribunal was not persuaded that it is appropriate for a planning permit to manage and protect such cultural heritage values.

See also:

  • Guide to Planning Appeals: Aboriginal cultural heritage

4. Whether works involved a deviation of a waterway under the Water Act

In Taungurung Land and Waters Council v Goulburn Murray Water [2024] VCAT 573, Taungurung Land and Waters Council (Aboriginal Corporation), sought a review of the Goulburn Murray Water (GMW) decision as delegate of the Minister of Water to issue the licence for works to deviate (temporarily or permanently) a waterway and an application under section 51 of the Water Act 1989 (Water Act) to take and use water or to operate the works.

GMW had issued a licence to Rubicon Station Pty Ltd to construct works to allow water from Rubicon River to operate a hydro-electric scheme on their land.

No licence had been granted under section 51 to take and use the water from Rubicon River.

A preliminary hearing was heard to consider four questions of law:

  1. Whether the works the subject of the Decision are, or include, works to deviate a waterway?
  2. Whether GWM had authority, pursuant to the instrument of delegation, to make the Decision?
  3. Whether, on proper construction of section 69(2) of the Water Act, there was a “related application under Part 4” before GWM at the time it made the Decision?
  4. Whether, if there was a “related application under Part 4” before GMW at the time it made the Decision, GWM was required to defer the making of the Decision pursuant to section 69(2) of the Water Act?

On Question 1, the Tribunal held that the works do not change the course of the Rubicon River on the basis, inter alia, that 56% of flows on an average year are proposed to be directed out of the Rubicon River, however the water will return to the river and there is simply less water between the intake and outtake structures.

On Question 2, given the answer to Question 1 is No, the answer to Question 2 is Yes.

On Question 3, the Tribunal held that at all material times there was a related application and both Rubicon and GMW treated, processed and reviewed the two applications as if they were related applications including the applications being made at the same time, both being refused in 2018, causing publication in newspapers, sending referrals to various bodies and referring to the section 51 application in the assessment of the section 67 application.

On Question 4, the Tribunal held that pursuant to section 69(3)(a) once the decision maker decides there is a related application under Part 4 of the Water Act, the decision maker must refuse an application under section 67 if the related application is refused. Further, that pursuant to section 69(2) discretion to consider an application under section 67 is removed until the related application under Part 4 is decided.

The Tribunal considered that this interpretation “allows a harmonious integration of the provisions of s69 of the Water Act.”

The Tribunal did not make a declaration in this matter and held there was no practical utility in the circumstances as it does not dispose of the proceeding, distinguishing SBI Landfill Pty Ltd v Environment Protection Authority [2023] VCAT 417.

Further, the Tribunal considered that it was not in the interest of justice to exercise its discretion under Clause 62, schedule 1 of the VCAT Act.

The Tribunal determined to set aside the decision of the GMW to issue the licence and remitted the matter for reconsideration in accordance with the relevant provisions of the Water Act.

See also:

  • Guide to Planning Appeals: Water Act 1989 > Challenge to Authority decision

5. Traffic concerns scuttle a Dan Murphy’s and convenience restaurant

It is fair to say that it is not too often that traffic engineers’ evidence is widely divergent and where the Tribunal concludes traffic evidence is unsatisfactory.

In Princes Wattle Pty Ltd v Wyndham CC [2024] VCAT 753, the Council had opposed an application for two two-storey buildings containing two shops in one of the buildings (a bottle shop and shop), and a convenience restaurant and four other separate tenancies for the purpose of shops in the other. One of the buildings was to be a Dan Murphy’s liquor shop.

Council’s concerns were in relation to traffic, urban design and social impacts.

Both the Applicant and Council called traffic experts. The two experts reached different findings in relation to gaps in traffic flow along Princes Highway. This was a significant issue because the inability to exit the site would lead to traffic congestion within the site. The Tribunal stated:

We are not persuaded that the evidence of either traffic witness is sufficiently reliable. More particularly, we are not persuaded that the evidence of Mr Furness is reliable enough for us to be persuaded to an acceptable degree that the proposal will not cause traffic issues.

The issues we have with the reliability of Mr Safi’s evidence include the fact that Mr Safi did not, in his written evidence statement, state the exact number of gaps in the traffic flow that he observed, nor the method by which he undertook these observations. This information was elicited only through cross examination. This is in contrast to other specific observations he made at the times of his inspections and which were specifically recorded in his evidence statement.

We do not infer that such information was deliberately omitted, just that the evidence in the written statement was not as fulsome as it might have been, where such information is critical to an analysis of traffic impacts to Princes Highway, and where this is one of the central issues in dispute in this case.

The existence of gaps in traffic flow on a green signal phase at the intersection, is highly relevant to our consideration of traffic and access in this case. This is because:

    • The number of vehicles estimated to exit the site at the peak period (72 by Mr Safi and 79 by Mr Furness) is greater than the gaps accounted for by Mr Safi (60 ‘courtesy’ gaps only, not gaps in traffic flow otherwise) but less than what Mr Furness states (117 excluding courtesy gaps).
    • We have concerns with the layout of the internal access and car parking for other reasons which will be explored further in our reasons.
    • The criticality of the existence of such gaps has the possibility of exacerbating the other issues we have with internal access and parking layout.
    • Given the volume of estimated exiting vehicles at the peak period, there needs to be sufficient gaps to allow those vehicles to exit and not create queueing, and other consequential issues on or adjacent to the site.

We are also not persuaded that the evidence of Mr Furness is satisfactory for us to be persuaded that exit movements from the site, and queueing within the site at the Princes Highway exit point, would be acceptable. [57-61]

The Tribunal considered that more observations should be undertaken over a longer time period (such as multiple weeks), encompassing multiple days which would likely provide a much better indication of what was more likely to occur under traffic conditions over the course of weeks, or months and be more representative of traffic conditions more generally.

In relation to urban design, the Tribunal was concerned with the lack of pedestrian connectivity along Princes Highway (which was an explicit objective in the PSP). It stated:

In our view, this is relevant to the level of activation and pedestrian weather protection required for Princes Highway, as a high-quality pedestrian environment may in-fact induce increased pedestrian activity.

Any future application should consider how the proposal will interface with Princes Highway having regard to the strategic vision and objectives contained in the PSP insofar as they relate to Princes Highway. [102-103]

The Tribunal did not consider there to be adverse social impacts by the grant of a permit of the Dan Murphy’s. It stated:

There were no ‘locational’ issues that were brought to our attention, that might warrant closer examination of whether the grant or a permit for a liquor licence might have social impacts on other specific land uses in the immediate area, such as the existence of facilities for people who are homeless or experiencing disadvantage; drug and alcohol support services; family violence support services; hospitals or other health facilities; nursing homes; schools or other educational facilities.

Further, we have not been persuaded that the land is located in an area of any particular vulnerability or special character that would make a packaged liquor licence on the land and unacceptable outcome, or that the grant of a permit will have any significant social or economic impact. Whilst Ms Peterson’s evidence was that the demographics of Werribee is mixed, with areas of significant disadvantage, she said that there are already several existing packaged liquor retail outlets in the Werribee area, as well as online sales points locally and that this proposal will not necessarily add to the consumption of alcohol, rather, provide further choice. [159-160]

It will be interesting to see what results emerge should more comprehensive traffic counts be undertaken.

See also:

  • Guide to Planning Appeals: Evidence, Traffic, Economic and social effects > Social impacts

6. Whether public open space contribution is double dipping

In Drouin Highfields Pty Ltd v Baw Baw SC [2024] VCAT 773, the Tribunal considered a dispute between the Council and the developer in relation to a public open space contribution required for a residential subdivision of 74 lots.

The public open space contribution was required as one of 109 conditions (!) on the permit. Condition 43 in the approved permit reads as follows:

Before Statement of Compliance for each stage, a Public Open Space Contribution equivalent to the value of 4.5% of the Net Developable Area must be paid to the satisfaction of the Responsible Authority in accordance with the Subdivision Act 1988. Land in lieu of monetary contribution or a combination of both can be provided if agreed to by the Responsible Authority. Any land that is provided must be unencumbered and must be in a location satisfactory to the Responsible Authority.

The dispute was essentially about the timing of the provision of a public open space contribution on the subject site versus the contribution required for the whole property, as well as a dispute about the nature of the contribution, whether it be land, cash or a combination.

The Applicant contended that if it is required to make a contribution for the subject site subdivision would result in ‘double dipping’ by Council on the basis that at some point in the future Council will receive the land public open space contribution for the whole property, thus resulting in an over-collection and effectively a second contribution of open space for the subject site.

As well as the double dipping argument, the Applicant considered the approved condition 43 is unlawful as the schedule to Clause 53.01 only allows for a land contribution (‘area’) rather than a cash contribution.

Council contended that collecting the public open space contribution for stage 1 and 2 is mandatory and that there are suitable equalisation measures in the planning scheme and PSP that will enable the landowner to contribute the correct amount (4.5%) over time for the whole property.

In supporting a change to the relevant condition, the Tribunal stated:

In my view requiring a public open space contribution now for the subject site when the planning scheme clearly identifies how open space will be provided in the immediate area would be a poor planning outcome. In my view it would not be the ‘reasonably practical result’ sought by Deputy President Gibson. (see Melbourne CC v Minister for Planning (includes summary) (Red Dot) [2015] VCAT 370 [33-35])

The mandatory requirement for the public open space contribution is not in dispute, and as indicated earlier in these reasons timing of the contribution is the key issue. The contribution of the public open space identified through the PSP, in time, will meet the requirements of the planning scheme for the whole property. This in my view would be the acceptable planning outcome and the conditions on the planning permit should enable this outcome.

The facts and circumstances in this case are just those which sections 18A(2)(c) and 21(1)(b)(ii) working together in the SD Act are designed to address. Council acknowledged as much in their submission subject to some concerns about the form of agreement.

The SD Act does not provide for a specific form of agreement, but to my mind it is logical that a section 173 agreement under the PE Act as proposed by the applicant would be appropriate. In the circumstances in this case the whole property is in one ownership. The applicant proposed a section 173 agreement in its condition 43 to apply to the whole of 100 Buln Buln Road; if for some reason the subdivision of the balance land does not occur the current or future landowner will still be obligated to provide the clause 53.01 contribution for the subject site.

I note Council’s concern that the condition as proposed has a degree of specificity such that room for negotiation and agreement between the applicant and responsible authority would be significantly curtailed. I accept in the circumstances it is not desirable to impose such an ‘agreement’. [46-50]

See also:

  • Guide to Planning Appeals: Public open space contributions > Cash or land

7. Large residential development in proximity to MHF approved – the problem with Clause 13.02-7S

We have commented on a number of cases in recent years on proposed residential developments in proximity to Major Hazard Facilities (MHFs), especially around the petrol-chemical plants in Hobsons Bay and Maribyrnong.

In Edenville Corio Pty Ltd v Greater Geelong CC [2024] VCAT 794, the Tribunal considered a proposal for 107 dwellings on a former government primary school site in proximity to a petrol refinery in Corio. WorkSafe objected to the proposal because the site is within the Outer Safety Area (OSA).

The Tribunal noted there is no permit trigger that specifically enlivens Clause 13.02-7S, which it found problematic as the purpose of the clause is to both ensure the ongoing viability of an MHF and to minimise the potential for human and property exposure to risk from incidents at an MHF. It stated:

We consider it is counterintuitive to include clause 13.02-7S in the planning scheme and then for it have no power in a situation where it should be of most utility. We also note the position in Nasralla that if clause 13.02-7S were to be enlivened separate from a specific trigger, then the utility of applying an overlay for development such as the BAO would be significantly reduced. [42]

The Applicant called an expert witness on the potential risk. In finding the proposal to be acceptable, the Tribunal stated:

In the context of the ISA and OSA, along with the fact that the MHF operates in accordance with its Safety Case that has been approved by WorkSafe, we accept Mr Lee’s evidence that:

    • The risk to the subject site from an explosion at the MHF is very low and the fatality risk from all sources would be expected to be contained to an acceptable level within the ISA.
    • The location of HF release is likely to be at the processing plant area of the refinery, in the order of 1,380 metres from the subject site as shown in figure 4. Consequently, there is no credible scenario where a release of HF vapour could impact the review site at a level that would result in fatality.
    • There is a marginal increase in societal risk to the subject site but that this risk is at an acceptable level.

We accept there will be a small increase in societal risk. This must be balanced against a significant increase in much needed housing in an existing residential area and the housing increase must be weighted in our overall consideration. As such we find the proposed subdivision and development is an acceptable planning outcome in context of planning policies at clause 13.07 of the planning scheme. [48-49]

See also:

  • Guide to Planning Appeals: Risk