VCAT Volume 11 No 15
1. Do you have a reservation?
An interesting scenario involving the reservation of a rail corridor to Epping arose in Warwick Concrete Company Pty Ltd v Whittlesea CC [2024] VCAT 678.
The matter involved industrial land bisected by a proposed transport corridor – the Epping North Transport Corridor (ENTC). This corridor allows for a future train line branching from the current Mernda line north of the current Lalor Station. The corridor was identified on a Development Plan approved under a schedule to the Development Plan Overlay applying to the site, and a previous subdivision permit had shown the corridor set aside. However no Public Acquisition Overlay applied across the land, nor had other steps been taken to reserve or acquire the land.
The proceeding was triggered by an application for planning permit that sought to subdivide the corridor for industrial development. The Applicant was forthright in declaring that they anticipated opposition from the Department of Transport / Head, Transport for Victoria, and made the application to trigger compensation under section 98(2) of the Planning and Environment Act 1987 (P&E Act). That section states:
…the owner or occupier of any land may claim compensation from a responsible authority for financial loss suffered as the natural, direct and reasonable consequence of a refusal by the responsible authority to grant a permit to use or develop the land on the ground that the land is or will be needed for a public.
The Applicant also made a request to amend the Development Plan to remove the reference to the ENTC.
Prior to the merits hearing, there was some discussion of variously formulated legal questions relating to the Tribunal’s jurisdiction, given the terms of the Development Plan, and its interaction with section 98(2). These largely fell away, however, in exchange of submissions prior to the hearing. In those submissions, the Head, Transport for Victoria stated (as quoted in the decision):
This being the case, HTV cannot, without qualification, state that the Corridor “is or will be required” in the sense contemplated by s 98(2). There are steps that need to be taken before its future as a public transport corridor can be confirmed.
It does not follow, however, that the Corridor Land will not ultimately be required for this purpose. The potential for the Corridor to be utilised for this purpose in the future should not be disregarded by the Tribunal in determining the Development Plan Review and the Permit Review.
In response to these comments, the Applicants considered the legal questions resolved, on the basis that they agreed that section 98(2) no longer applied, stating (again, as quoted in the decision):
In its submissions, HTV has, for the first time, admitted that it cannot give unqualified confirmation that the corridor land is or will be needed for the Public Transport Corridor, as the necessary planning has not been undertaken; to put that admission another way, at the present time there is only a hypothetical potential that the corridor land will be needed, and it is equally likely that it will not. This is the confirmation that the Applicant has been seeking since November 2023. The effect of that admission is that, as noted by the Applicant in the December Submissions, the Tribunal does not need to consider section 98(2) (and related matters) at all.
It was also agreed by all parties that because the Development Plan currently showed the corridor, the proposed subdivision plan would need to be refused if assessed against the current Development Plan, on the grounds that it did not generally accord with the current plan. The key merits question therefore became whether the Development Plan should be amended.
In considering this question, the Tribunal noted that a Development Plan needed to be consistent with local policies (in the terms of the schedule to the DPO), and that the header clause of the DPO has the purpose of implementing the MPS and PPF.
The Tribunal therefore considered the scheme’s policy framework and noted various relevant policies, including high level state policy about land use and transport integration, as well as local content that referred specifically to the ENTC. This included local policy that included a strategy to “facilitate the reservation of a public transport corridor between Lalor and Wollert” and a MPS map that referred to a “future rail line” with a notation indicating this was a “Future project dependent on State Government.”
The Tribunal considered the terms of state policy at Clause 18.01-1S, which has a loose hierarchy for protection of transport infrastructure in various levels of planning. It agreed with HTV submissions that this was “identified potential transport infrastructure” which the policy says should be protected “from being precluded by land use and development.”
The Tribunal therefore concluded:
In summary, we find that the local policy in clause 02.03-8 seeks to ensure that development of the review site should occur with the ENTC area being ‘put to one side’, in the sense that there is an acknowledgment that Lot F is the location of this identified potential transport infrastructure.
We find that the combined effect of the State and local planning policy is an intention that a document such as the DP Amendment Application should both:
-
- acknowledge that Lot F is the location of the ENTC, being identified potential transport infrastructure; and
- seek to ensure that use and development of the review site is planned so as not to prevent the presence of or make it impossible for the ENTC to potentially or possibly be developed in the future. [229-230]
As such, the Tribunal held that the Development Plan should not be amended as proposed and that the Development Plan stayed in its current form, meaning that the subdivision permit was refused.
The retention of the rail corridor is clearly a good public policy outcome, and it is pleasing to see specific policy statements in the PPF being so determinative. However, it is also hard not to feel sympathy for the landowner in this situation, given that compensation is not triggered, and wonder how this affects practice for the identification and reservation of transport corridors in future.
See also:
- Guide to Planning Appeals: Development Plan, Generally in accordance
2. Childcare in an Industrial Zone
In 41 Myrtle Street Pty Ltd v Monash CC (Corrected) [2024] VCAT 557 the Tribunal considered the interface issues associated with locating a child care centre in an Industrial 1 Zone.
The application sought a 90 place child care centre in an Industrial 1 Zone. Council had refused the application on various grounds, including the potential impacts on the users of the child care centre from “noise, odour and fumes” from the adjoining industrial uses. A Statement of Grounds raising similar concerns was received from an adjoining industrially-zoned site.
In arguing for the use, the Applicant’s planning witness argued that there is not a zone where child care centres were consistent with the primary purpose of the zone. The Tribunal did not agree with this proposition, noting that child care centres are consistent with purposes in both the General Residential Zone and Commercial 1 Zone.
In considering the proposal, the Tribunal noted that the land faced General Residential Zoned land within 30 metres on the opposite side of the street. The Tribunal considered this affected the likelihood of new industrial uses establishing on adjoining sites, noting that new industrial uses would already need to deal with an interface situation due to that proximity.
The Tribunal was satisfied by acoustic evidence that existing noise impacts were manageable. Again, the presence of existing residential properties across the road was considered relevant, as the Tribunal noted that the nearby sites would already have EPA obligations to meet to manage existing interfaces.
The Tribunal noted that distinct odours were apparent on site inspection, and ordered an air quality assessment be provided. Ultimately, evidence before the Tribunal indicated sampling detected levels considerably below safe exposure levels. The Tribunal concluded:
Whilst the users of the centre will be exposed to chemicals, particularly when using the outdoor play spaces, I am satisfied based on the evidence that the level of exposure is highly unlikely to be harmful to their health. Odours will be able to be observed by the users of the childcare facility particularly when the neighbouring industrial uses are operating, and the operators of the childcare centre may wish to alter activities accordingly, such as limiting the use of the outdoor spaces if the odour is particularly strong. However, based on the evidence I am satisfied that there would be no human health reason to do so. [59]
The Tribunal therefore directed that a permit issue.
See also:
- Guide to Planning Appeals: Childcare centre > Industrial zone
3. Native vegetation removal – taking it seriously
In VCAT Volume 11 No 3 we reported on Austak Derrimut Pty Ltd v Brimbank CC [2023] VCAT 969, in which 117 dwellings were refused because applicants had, in the Tribunal’s view, failed to adequately follow the three-step process for justifying removal of native vegetation. Another recent case, Maribyrnong Riverside Development Pty Ltd v Brimbank CC [2024] VCAT 736, saw developers similarly come unstuck on vegetation removal issues.
The site was part of a staged development along the western bank of the Maribyrnong River in Sunshine North. This land is being progressively developed under a Development Plan approved in 2002. The site includes native grasslands, and the proposed subdivisions resulted (after amendment of plans before the hearing) in the loss of 1.09ha of native vegetation. Both the Council and the Department of Energy Environment and Climate Action (DEECA), a recommending referral authority, opposed the removal of the vegetation. Both considered that the proposal had not met the three-step process outlined in Clause 52.17 and the supporting native vegetation removal guidelines.
In considering the matter, the Tribunal noted that the subdivision had strategic support and implemented a longstanding Development Plan. The Applicants also tried to argue that weight should be given to a lack of environmental overlays on the site, but the Tribunal did not agree:
There is a recurring theme across the submission of the applicant and the evidence of Ms Peterson and the ecological evidence of Mr Organ that the site is not affected by any environmental based overlays, such as the Environmental Significance Overlay (‘ESO’), Vegetation Protection Overlay (‘VPO’) or Significant Landscape Overlay (‘SLO’) that identifies any specific environmental or biodiversity values on the site. Various references are made to the Maribyrnong River Guidelines and the Development Plan, with the emphasis of these submissions and evidence that, compared to the residential zoning of the site, the environmental values associated with native vegetation found on the site does not override the intent under the planning controls for the site to be developed for residential purposes.
I find these arguments are misguided because a permit requirement is triggered irrespective of the presence or otherwise of any environmentally based overlays under Clause 52.17 because of the extent and locational attributes of the native vegetation proposed to be removed as part of the proposal to subdivide the land. Relevantly, under the Native Vegetation Guidelines which are called up under Clause 52.17, the proposed extent of native vegetation removal is considered to have some importance for biodiversity values and, in combination with the potential presence of threatened species, makes the impacts from such residential development a matter that requires consideration and assessment. [47-48]
The Tribunal noted that there had been several native vegetation assessments undertaken across the course of the application, and outlined a series of criticisms made by Council and DEECA of those assessments. It noted DEECA considered the application to involve areas of high strategic biodiversity value, endangered grasslands, and habitat for critically endangered, endangered and vulnerable species (including species listed in the Flora and Fauna Guarantee Act).
The Tribunal believed that there was considerable variation in the findings of the previous biodiversity assessments. While it noted that this reflected the changeability of native grasslands, the Tribunal noted that the previous surveys did “not cover the site in a comprehensive manner” (paragraph 133). While the Tribunal acknowledged that “we work in a planning regime that is based on acceptable outcomes rather than perfection,” it concluded that the proposal had not demonstrated appropriate minimisation of loss:
Mr Organ’s evidence was that the proposed subdivision design avoids the higher quality patches or areas of native vegetation found on the site. I consider this may be true for areas within the southern portion of the site, but I note in his habitat hectare assessment of the native vegetation there are areas of equally high-quality native vegetation in the centre and central northern portions of the site that are not avoided from removal associated with the subdivision.
…
The loss of these areas of native grassland vegetation as a result of the proposed subdivision is a poor outcome with respect to the design of the subdivision. The native grassland vegetation lost is of high quality and linked to a threatened ecological vegetation community. [141-144]
The Tribunal affirmed the decision of the Council to refuse a permit.
Your editors note that the Victorian Auditor-General was in 2022 highly critical of the administration of the native vegetation controls in planning schemes, and especially the application of the three-step test (Offsetting Native Vegetation Loss on Private Land, Victorian Auditor-General, May 2022). However, this and similar previous decisions suggest that, for its part, the Tribunal remains vigilant on the issue.
See also:
- Guide to Planning Appeals: Native vegetation > Net gain
4. Covenant non compliance – removal vs variation
The legal decision Alderman v Hume CC (Red Dot) [2024] VCAT 737 is of interest as it involved the Tribunal departing from previous decisions regarding removal and variation of covenants where there is existing non-compliance with the covenant.
The matter involved a permit application to vary a covenant on land that limited development to eight metres in height. In 2016, a planning permit had issued for a dwelling that exceeded that height, and this was subsequently built, in contravention of the covenant. The application sought to vary the covenant to refer to a height of 10.5m to reflect the height of that dwelling.
Council determined to approve that application, but the decision was appealed by objectors. A question arose as to whether they had standing due to section 47(2) of the Planning and Environment Act 1987 (P&E Act) which provides an exemption from the P&E Act’s notice requirements. Section 47(2) reads:
Sections 52 and 55 do not apply to an application for a permit to remove a restriction (within the meaning of the Subdivision Act 1988) over land if the land has been used or developed for more than 2 years before the date of the application in a manner which would have been lawful under this Act but for the existence of the restriction.
It should be noted that the section above refers to removal of a covenant, not variation. The question therefore arose as to whether the above notice exemption applied.
The Tribunal considered the dictionary definitions of the words “remove” and “vary” and noted that they were clearly distinct. It also noted other places in the P&E Act where the text uses both words, in contrast to the structure of section 47(2), and suggesting an intentional distinction between the two.
Council and Respondents (the permit applicants) argued that a purposive approach suggested that the word “remove” should include “vary” in section 47(2). They pointed to previous Tribunal reasoning in Pagrati Pty Ltd v City of Boroondara Appeal No.1996/06868 that reached this conclusion. However, the Tribunal did not agree:
I do not agree with the reasoning in Pagrati that the purpose of s.47(2) is to allow for a breached covenant or restriction to be ‘regularised’. The purpose of s.47(2) is to exempt a particular class of permit application from notice and referral requirements that otherwise would be required under the PE Act. To that end, s.47(2) relates to the processing of the particular class of permit application and does not alter considerations required under the PE Act for the determination of that class of permit application. [70]
The Tribunal also declined to follow Hawley v Yarra Ranges SC [2007] VCAT 268, which had followed a legal maxim that the greater includes the lesser (major continet in se minus) in concluding that that “remove” included “vary.” The Tribunal disagreed, noting:
I decline to apply the maxim, because examination of the text, legislative and broader context of s.47(2) of the PE Act leads to the conclusion that the greater does not include the lesser in this instance. [77]
The Tribunal therefore ruled that section 47(2) of the Act does not apply.
See also:
- Guide to Planning Appeals: Restrictive covenant > Removal v variation
5. (Can’t Get No?) Satisfaction
In VCAT Volume 11 No 11 we reported a preliminary hearing in an enforcement matter regarding the Cape Bridgewater Wind Energy Facility. The preliminaries in this matter have continued with the legal decision Ware v Glenelg SC [2024] VCAT 727, which related to the application of a condition in an Incorporated Document requiring compliance with an acoustic standard to the satisfaction of the Minister.
The application was made under section 114 of the Planning and Environment Act 1987 (P&E Act) and sought an order that the wind farm use be halted. The wind farm had been authorised by an Incorporated Document approved in 2004, which included conditions that the approved wind farms needed to comply with. One of those was:
The operation of the wind energy facility must comply with the New Zealand Standard “Acoustics – The Assessment and Measurement of Sound from Wind Turbine Generators” (NZ 6808: 1998) the (“New Zealand Standard”), in relation to any dwelling existing or approved (by way of a planning permit or a building permit) at the date of approval of this document, to the satisfaction of the Minister for Planning.
Differing Ministers have previously – in 2015 and 2024 – given advice that the wind farm complied with the Standard to their satisfaction.
Because the enforcement hinged on a question of compliance with the noise standard, the question arose whether the fact that the Minister had been satisfied of compliance in itself satisfied the condition, or whether the Tribunal could independently assess compliance. Specifically, the preliminary legal question was:
Can the Tribunal determine that there has been a breach, or ongoing breach, of condition 13 of the Incorporated Document in circumstances where the Minister for Planning made a decision on 24 February 2024 that, for the purposes of condition 13 of the Incorporated Document, she is satisfied that the Wind Farm complies with the New Zealand Standard Acoustics – The assessment and measurement of sound from wind turbine generators (NZ6808:1998)?
While there was some nuance in the positions of the parties, broadly:
- The operators of the wind farm and the Council both took a literal approach: that there could not be a breach of the condition where the Minister was satisfied the standard was complied with (paragraph 39 and 55).
- The Minister considered that the conditions should not be read so literally, because this would not require compliance with the noise Standard as intended by the condition. The Minister’s representatives also noted oddities of the literal approach, in the compliance could only ever be “backwards looking” (in that the Minister could only deem compliance up to the date of their decision), and that the condition would arguably create breaches through inaction where the Minister made no decision, or between declarations (paragraphs 61 to 65).
- The Applicant for the enforcement order similarly argued that the highly literal approach would undermine the effect of the condition and the role of the Tribunal (paragraph 82).
It was noted by the Council that if the literal approach was followed, a partial remedy remained under ss 149 of 149B of the P&E Act, through the seeking of review of the satisfaction decision or the seeking of a declaration.
A similar question had previously been considered by the Supreme Court in Uren v Bald Hills Wind Farm Pty Ltd [2022] VSC 145. In that case, the Court had considered a similar condition in a permit and concluded that the satisfaction of the Minister did not by itself dispose of the question:
That interpretation would be repugnant to the enforcement framework provided in the Planning Act. It is for the Tribunal, not the Minister, to determine whether to make an enforcement order in accordance with s 119 of the Planning Act. It is for a court, not the Minister, to determine whether the operator of the wind farm is guilty of an offence against s 126 of the Planning Act. [100]
Given the apparent similarity of the cases, there were detailed submissions before the Tribunal as to the distinction between the situations.
One distinction, argued by the Respondent, was that the current situation involved an Incorporated Document, not a permit, and that this affected the approach to statutory interpretation. The Minister’s representatives argued, however, that the Incorporated Document was akin to a permit and “should not be interpreted in a strict or over technical way but in a practical, reasonable and common-sense manner” (paragraph 37).
In considering these issues, the Tribunal noted the initial attractiveness of a literal interpretation. However, it considered that this was not consistent with the purpose of the condition, the context of the condition within the Incorporated Document, and the planning regime established by the P&E Act. It noted:
I reject the submissions of the respondent that the purpose of the condition is to make the Minister responsible for determining the acceptability of noise impacts from the wind farm. That submission means that if the Minister is satisfied that the wind farm is operating in compliance with the NZ Standard, there is no ability for the responsible authority, in this case, council to commence enforcement proceedings. Moreover, that state of satisfaction is temporal, at a point in time and arrived at from information about operations that have occurred. It cannot be a state of satisfaction about operations in the future.
The purpose of the condition is to require the operation of the wind farm to comply with the NZ Standard for sound (noise) to protect the acoustic amenity of any dwelling that existed or was approved at the time the Incorporated Document was gazetted. [91-92]
The Tribunal further noted that the literal construction would be inconsistent with the statutory obligation of the responsible authority to enforce its own scheme; the rights to apply for enforcement orders under section 114 of the P&E Act; and the ability to sustain enforcement orders. The Tribunal considered that approach would amount to a subversion of the legislation:
Delegated legislation such as a planning scheme cannot limit the statutory powers or rights in respect of enforcement as established under the empowering legislation. To that end, I reject the submissions of the respondent that the inclusion of the phrase ‘to the satisfaction of the Minister’ evinces a conscious decision to make the Minister responsible for determining compliance with the NZ Standard. It would be inconsistent for the delegated legislation to limit the specific powers under the empowering legislation. [104]
The Tribunal therefore followed an approach essentially the same as the Uren decision.
See also:
- Guide to Planning Appeals: Wind energy facilities > Noise complaints
6. Are subdivision landscape plans engineering plans that require the payment of a fee?
Regulation 9 of the Subdivision (Fees) Regulations 2016 sets the relevant fee for checking an engineering plan as not exceeding 0.75% of the estimated cost of constructing the works proposed on the plan.
Section 15 of the Subdivision Act 1988 (Subdivision Act) provides that a Council or referral authority may require an engineering plan for works and section 17 requires that works cannot commence until the engineering plan has been certified.
In AV Jennings Properties Ltd v Whittlesea CC [2024] VCAT 836, the Applicant brought a proceeding pursuant to section 39(1) of the Subdivision Act disputing fees totalling $306,339.72 that it was charged by the Council for the checking of landscaping plans and for the Council’s supervision of landscape works related to planning permits issued for four residential subdivision estates.
The Applicant submitted that the Council was not entitled to charge the disputed fees for the landscape plans because these are not ‘engineering plans’ for the purposes of the provisions of the Act and the Regulations that are relied upon by the Council. Further, the Applicant submitted that an ‘engineering plan’ under the Act ‘relates to works providing for roads or public utility services to the land’, citing the decision of the Supreme Court of Victoria, Court of Appeal in Maroondah City Council v Fletcher [2009] VSCA 250.
The Applicant also contended that the Council is only able to charge a supervision fee for engineering works, not landscape works given section 17 of the Subdivision Act.
On the other hand, the Council submitted that the landscape plans comprise part of the ‘engineering plans’ for the purposes of section 15 of the Act and regulation 9 of the Regulations. The Council acknowledged that ‘engineering’ is not defined in the Act but refers to the definition of ‘plan’ in section 3 of the Act, which is:
plan means a plan under section 24A, 32B or 37 or Division 3 of Part 5 or a plan of –
(a) subdivision; or
(b) consolidation; or
(c) creation, variation or removal of an easement or restriction;
The Tribunal held that notwithstanding that the landscape plans that are the subject of this dispute may include ‘works’ as defined in section 3 of the Act and may show matters also shown on an engineering plan, this does not make those plans engineering plans for the purposes of section 15 of the Act and regulation 9 of the Regulations. It considered this finding applies to all of the landscape plans that are the subject of this dispute because each of these plans has been prepared for the purpose of being a landscape plan and not for the purpose of being an engineering plan. Whilst the Tribunal accepted that the purpose or reason for doing something might sometimes be subjective (i.e. depend on the mindset of the person), the purpose of these plans is to have been prepared as landscape plans.
The Applicant sought an Order that the fees paid be reimbursed. However, the Tribunal considered it did not have the power to make such an Order under section 39(1). In any case, the Tribunal was aware that the parties have an agreement in place on this matter.
See also:
- Guide to Planning Appeals: Subdivision – Assessment fees