1. Should earlier permits replaced by an omnibus permit be cancelled?
In Haileybury v Bayside CC [2024] VCAT 607, the Tribunal considered an application by the operator of a school to cancel three earlier permits which primarily related to the expansion of the school.
The application for the cancellations was initiated because of a condition on an omnibus permit approved by the Minister for Planning as responsible authority under Clause 72.01- 01 of the Bayside Planning Scheme that the permit not come into effect until the earlier permits had been amended/cancelled.
The Minister contended that the omnibus permit was issued on the basis that all necessary conditions from the specified permits have been properly incorporated and the cancelling of the specified permits will result in a proper and orderly planning outcome.
The Council opposed the cancellation of the permits on the basis that cancellation of the permits did not sufficiently address matters relating to the use of land as an education centre, buildings and works, car parking, landscaping, drainage and stormwater management. The majority of these concerns were addressed by the amendment of the new permit on 19 and 22 February 2024. However, the Council had a remaining concern about the adequacy of car parking and the deletion of a condition on an earlier permit on the capping of student numbers.
Section 88 of the Planning and Environment Act 1987 (P&E Act) provides that:
The power to cancel or amend a permit under section 87 may be exercised—
(a) if the permit relates to the construction of buildings or the carrying out of other works, at any time before those operations have been completed; or
(b) if the permit relates to any other development of land, at any time before that development is substantially carried out; or
(c) at any time, if the permit relates to the use of land.
The Applicant submitted that section 88(c) provides that the power to cancel or amend a permit under section 87 may be exercised, at any time, if the permit relates to the use of land, even if it is also a permit for development. Whether a use permit could be cancelled if it also includes development was addressed in Yarra Ranges SC v Australian Native Landscapes Pty (Red Dot) (2009) 34 VRP 128; [2009] VCAT 1025, where it was stated:
This permit does relate to the use of land and so can be cancelled or amended. We do not think that this power is obstructed by the permit also relating to buildings and works. A permit document can contain more than one planning permission. It is not unusual for there to be several, including permission for use and also permission for development. At the very most, the constraints of s 88 (a) and (b) should apply only to the permissions for buildings works or development and conditions specifically and solely related thereto. It would not only be contrary to the section, but contrary to common sense and convenience, if the completion of a building for which permission was granted should thereby freeze use aspects of a permit which are intended to have and retain the possibility of being cancelled or amended. [192]
Accordingly, the Tribunal held that section 88 does not bar cancellation or amendment of the permit.
However, whilst the Tribunal found it could cancel the permit issued for the ‘middle school’, there were two other permits to which the Council was opposed to their cancellation because of the uncertainty with respect to student and staff numbers and whether adequate provision of car parking would be provided on the site. In particular, the permit issued for the ‘senior school’ included a condition limiting the number of students.
The Tribunal concluded that the permit for the ‘senior school’ could be cancelled without a replacement condition on the basis that:
- The new permit will facilitate the expansion of the school to allow for the natural growth of years 10 to 12 to eventually cater for 160 students in each year level, with sufficient car parking for additional staff associated with this growth.
- The current planning permits do not provide any limits on the number of students in the various year schools and a decision to retain the senior school permit will not change this reality. The application before the Tribunal is not an application to amend the new permit to include a cap on student or staff numbers overall or even within the senior school.
- Concerns about growth of the school and student numbers have been expressed as relating to traffic and car parking stress. The measures currently undertaken by the school and required through the traffic and car parking management plan provide for acceptable traffic impact.
- Planning requires consideration of car parking requirements for new uses and development, rather than existing, and for staff in primary and secondary schools, rather than students.
- Clause 52.06-2, provides that before a new use commences; or the floor area or site area of an existing use is increased; or an existing use is increased by the measure specified in Column C of Table 1 in Clause 52.06-5 for that use, the number of car parking spaces required under Clause 52.06-5 or in a schedule to the Parking Overlay must be provided to the satisfaction of the responsible authority.
See also:
- Guide to Planning Appeals: Permits > Omnibus permits
2. Should a quarry operator be joined to a proceeding involving a residential subdivision?
In 910 Donnybrook Road Pty Ltd v Whittlesea CC [2024] VCAT 592, the Applicant sought a review of a Council failure to make a decision within the statutory time period on a large residential subdivision within the Shenstone Park Precinct Structure Plan (PSP).
To the south of the subject land is an existing basalt and sedimentary rock quarry that has been operating since 1988. The PSP identifies a 200 metre ‘blast buffer’ and 500 metre ‘sensitive use ‘buffer. Both of these buffers encroach into the subject land.
The subdivision is exempt from notice and review under the relevant Urban Growth Zone (UGZ) schedule. Barro, the operator of the quarry, sought to be joined to the proceeding pursuant to section 60 of the Victorian Civil and Administrative Tribunal Act 1998 (VCAT Act). Barro relies on Peet Funds Management Limited v Wyndham CC [2022] VCAT 1328, where the relevant land was in the UGZ and Holcim (Australia) Pty Ltd, a quarry operator, was joined to the proceeding.
The Council opposed Barro’s application to be joined because it considers the proposed subdivision to be generally in accordance with the Shenstone Park PSP and, therefore, the exemption from third party notice and review rights contained in Clause 37.07-13 of the UGZ applies.
The permit applicant also opposed the application, submitting that the Planning Panel that considered Amendment C241 recognised that the Shenstone Park PSP and the UGZ7 gave effect to a deliberate intention to address land use compatibility issues at the strategic planning stage rather than leaving those to be resolved at the planning permit stage.
The Tribunal was satisfied that Barro is a person whose interests are affected by the proceeding as well as it being desirable that Barro be joined as a party, but for a limited reason and on a limited basis. That limited basis was in relation to interim drainage infrastructure works. Barro contended that the interim drainage infrastructure works have the potential to impact upon its blasting operations at the quarry, given their location within the 200 metre blast buffer. The Tribunal stated:
At the outset, I acknowledge that joinder is required is because of the exemption from third party notice and review contained in clause 37.07-13 of the UGZ.
In such circumstances, I acknowledge and adopt the approach to joinder that was employed by Deputy President Gibson in West Valentine Pty Ltd v Stonnington CC, that in the face of an explicit exemption of third party notice and review rights, as is the case here, there should not be, in effect, a circumvention of the exemption through joinder of a party unless there are very compelling reasons to do so.
In the present circumstances, not only is there an exemption from third party notice and review that has not been modified by Schedule 7 to the UGZ but the associated Shenstone Park PSP clearly acknowledges the presence of the Woody Hill Quarry and the importance of its continued operation. As such, it must be taken that the UGZ7 and the Shenstone Park PSP has been prepared mindful of the presence and importance of the Woody Hill Quarry.
Notwithstanding this, Schedule 7 has not altered the exemption contained in clause 37.07-13 of the UGZ to grant Barro participation rights. As such, in these circumstances it must be that the presence and importance of the Woody Hill Quarry, in and of itself, is insufficient to justify a joinder of Barro to the proceedings.
What flows from this is that to the extent Barro seeks joinder on the basis of its desire to be involved in the assessment of issues that are addressed in the Shenstone Park PSP, it must be thought that those issues were insufficient to lead the planning authority to alter clause 37.07-13 of the UGZ to grant Barro participation rights. In which case, why would it now be appropriate for the Tribunal to, in effect, undermine the exemption and join Barro as a party to the proceeding to engage in the assessment of those same issues that are addressed in the Shenstone Park PSP?
However, where there is an issue that is not directly addressed in the Shenstone Park PSP and which Barro contends affects its interests and with which it can assist the Tribunal, I have found that in the circumstances of this case, this can provide a basis for joinder. [86-90]
See also:
- Guide to Planning Appeals: Appeals > Joinder
3. Challenge to Water Authority directions on irrigation farm dam
In Cummaudo Asset Pty Ltd v Minister for Water (Red Dot) [2023] VCAT 1347, the Tribunal considered a review of directions made pursuant to section 80(1) of the Water Act 1989 (Water Act) by Southern Rural Water (the delegate of the Minister for Water) in relation to an irrigation farm dam. The directions required that: no water be pumped from the dam for direct use; water stored in the dam be released; and for the Applicant to plan and undertake works to amend the applicant’s works licence.
The irrigated farm dam is associated with a property used for the growing of potatoes. The water authority issued a licence under section 67 of the Water Act to undertake repairs to the dam subject to a number of conditions. Upon completion of the works, the authority wrote to the Applicant that alleged, inter alia, that the dam was was built differently and was holding a greater capacity than what was licensed. The correspondence included directions requiring that its concerns be addressed.
The Applicant sought a review of the Authority’s directions pursuant to section 83(1)(o) of the Water Act. It contended that the dam was not hazardous; not all the directions were necessary, particularly the directions require that no water be pumped from the dam for direct use and that water stored in the dam be released, and for the Applicant to plan and undertake works to amend the Applicant’s works licence.
As the Authority agreed to extend the date for this application, the Applicant sought a review of the directions and a stay of their operation until the matter was resolved. The application was listed for a preliminary hearing:
- to consider whether to grant an extension of time for lodging the application pursuant to section 126 of the Victorian Civil and Administrative Tribunal Act 1998; and
- to consider whether to grant a stay under section 50 of the VCAT Act of the operation of the direction issued under section 80 of the Water Act.
In relation to the extension of time, the Tribunal considered the overriding principle is to ensure justice is done in the circumstances. Having regard to submissions, it agreed to grant the extension.
In relation to the grant of stay, the Tribunal found that there were serious issues to be tried in the review proceeding, which were potentially numerous in number and complexity.
The Tribunal red dotted the decision on the basis that the Tribunal’s decision outlines the numerous issues as a series of questions that form a framework for what may need to be considered at the merits hearing of the application for review. The questions include consideration of:
- terms relating to section 80 of the Water Act, which states that directions can be issued if ‘the dam is or is likely to be hazardous to public safety, property or the environment because of its location or the nature of its construction’; and
- policy, guidelines and tools that may be relevant in determining if a dam is or is likely to be hazardous to public safety, property or the environment.
The decision is also of interest because it identifies Policies for Managing Works Licences as a potential relevant consideration in the proceeding. The Policy highlights a distinction between circumstances that may require a dam break assessment and those that must require a dam break assessment.
See also:
- Guide to Planning Appeals: Water Act 1989 > Challenge to Authority directions
4. Heritage impacts – confined to visibility from streetscape or more?
In Kounnas v Boroondara CC [2024] VCAT 611, the Tribunal considered a refusal of a large extension to a single dwelling in the Heritage Overlay.
The key issue in dispute was the impact of the extension on the significance of the heritage place and whether the impact should be considered from the streetscape or from a wider perspective.
The Statement of Significance refers to the place being representative of the growth of a garden suburb, as well as being a highly desirable garden suburb in Hawthorn. The Statement of Significance identifies that the garden suburb representation is particularly through the siting of middle-class, Victorian-style villas of varied size and materials in garden settings.
The Applicants and their heritage expert submitted the garden setting and the garden suburb is to be appreciated from the ground and not from an aerial view. As such, it was submitted that it is the front gardens that are visible from the ground, so they are significant. The heritage expert added that the garden setting is the front setback and the side setbacks, although it was acknowledged there is little landscaping to the sides of the houses in the heritage place.
The Tribunal referred to the Review of Heritage Provisions in Planning Schemes Advisory Committee Report 2017, which grappled with the issue of where to consider the impacts from (i.e. visibility). The Report notes that the purpose of the Heritage Overlay and its decision guidelines simply focus on the impacts on the significance of the heritage place, not the locations or extent of visibility. The Report acknowledges that Tribunal decisions have considered visibility impacts broadly. Some decisions have determined that views from the private and public domains are both relevant, some decisions have given some consideration to private views as residents in the same heritage precinct ought to be able to enjoy its heritage values, and some decisions have determined that public domain views are of greater relevance than other views.
In holding that the impact of the significance of the heritage was not confined to visibility from the streetscape, the Tribunal stated:
Whilst the Heritage in Boroondara policy places emphasis on the primary street frontage, it must be remembered this is a policy that applies to the whole municipality. The relevance of this policy needs to be considered in the context of the heritage significance as articulated in the particular Statement of Significance and in the existing physical context of the properties within the heritage place. In this case, that context is a Statement of Significance that highlights a garden suburb with villas in a garden setting, and a physical context that includes properties adjacent to each other with front and rear frontages for the majority of the properties on the south side of the heritage place.
For the reasons already explained the heritage significance is a broader consideration than just the appreciation of the new rear addition from the primary street frontage. What I mean by this in this case is that an appreciation from the ground of the significance of this heritage place is not physically restricted to the public realm view from Lyndhurst Crescent. There is a rear public realm view that is appreciable from the ground in the rear laneway of a number of properties on the south side of Lyndhurst Crescent. Also, the neighbouring properties on the south side Lyndhurst Crescent have a private view appreciation of the site from their adjoining or nearby properties. So, this visibility and its relevance to the significance of the heritage place brings me to the issue of considering the issue of visibility in a Heritage Overlay. 35-37]
Accordingly, the Tribunal considered the retention of part of the garden setting at the sides and/or rear of this site was necessary to minimise the impact of the heritage significance of the place. It considered whether achieving a garden setting could be addressed via permit conditions, but the changes necessary were likely to impact on the design of the built form. Hence, the application was refused.
See also:
- Guide to Planning Appeals: Heritage > Assessing visual impact on heritage place
5. Is the creation of an easement valid under Clause 52.02?
Clause 52.02 of the Victoria Planning Provisions states:
EASEMENTS, RESTRICTIONS AND RESERVES
Purpose
To enable the removal and variation of an easement or restrictions to enable a use or development that complies with the planning scheme after the interests of affected people are considered.
In Friends of the Surry Inc v Glenelg SC [2024] VCAT 636, a declaration was sought pursuant to section 149B of the Planning and Environment Act 1987 (P&E Act) from a local community group that Council’s Notice of Decision for a rural residential type subdivision that included a condition requiring the creation of an easement was not permitted under Clause 52.02. The easement is 10 metres wide and would allow for the care of livestock, and would also provide legal access to the properties.
The Applicant argued that the word ‘creation’ should be read into the purpose of Clause 52.02 of the scheme. On that basis, the Applicant submitted that the ‘clear plain English meaning of the phrase’ ‘to enable a use or development that complies with the planning scheme’ is that a decision maker must be satisfied that the creation of an easement will in fact enable a use or development that complies with the scheme.
Further, it was argued that planning schemes should be involved in the regulation of easements where a ‘local check on the suitability/legality’ of the easement is required before registration of an easement on a certificate of title. The Applicant submitted that ‘if an easement was intended to enable a land use or development that was prohibited under a planning scheme, it would not pass the planning permit stage, consent to certification of the plan would be refused and the plan could not be registered’.
In assessing the application for declaration, the following two questions were determined by the Tribunal:
- Does the purpose of Clause 52.02 of the scheme apply to an application for the creation of an easement?
- If the purpose of Clause 52.02 of the scheme applies to an application for the creation of an easement, is the consideration of a use or development that complies with the scheme mandatory?
On the first question, the Tribunal held that, consistent with the findings of Dunn v Glenelg SC [2023] VCAT 1330, the purpose of Clause 52.02 only reflects some of the actions that may be undertaken under ss 23, 24A and 36 of the Subdivision Act 1988 (editors emphasis) and provided that it does not lead to an absurd outcome.
The Tribunal agreed with Council’s submissions that the easement would not result in an absurd outcome having regard to the decision guidelines at Clause 52.02 of the scheme that provide, inter alia, in addition to the decision guidelines in Clause 65, the responsible authority must consider the interests of affected people. The Tribunal stated:
There is no absurd outcome or lack of certainty in the consideration of the creation of an easement because of the lack of a specified purpose. Rather, it simply means that an applicant for the creation of an easement cannot rely upon a specified purpose to support the application.
In my view, the purpose of clause 52.02 as it appears in the scheme is clear and unambiguous. It is a facilitative provision as it ‘enables’ the removal and variation of an easement or restriction to ‘enable’ use or development that complies with the scheme. In such circumstances, there is no need for me to read into the purpose the word ‘creation’. [55-56]
On the second question, the Tribunal found that the role of a purpose is to guide and assist in the exercise of discretion under the relevant control. In that sense, a purpose cannot be mandatory in application. When there is no specified purpose, the decision guidelines will guide and assist in the exercise of discretion under the relevant control. This was consistent with Waterfront Place Pty Ltd v Port Phillip CC (Red Dot) [2014] VCAT 1558 and Mirams v Boroondara CC [2022] VCAT 928, where the Tribunal concluded that the purpose of the control is not mandatory or determinative of an application.
See also:
- Guide to Planning Appeals: Easement > Creation of an easement
6. Major development rejected in Frankston’s ‘Great Wall’
At VCAT Vol 11 No 10 we reported on Long Island Residents Group Inc. & Frankston Beach Association Inc. v Frankston CC [2024] VCAT 359, where the Tribunal approved a 14 storey mixed use building in the Promenade precinct of the Frankston Metropolitan Activity Centre.
In Pace Development Group Pty Ltd v Frankston CC [2024] VCAT 645, the Tribunal refused a proposal for a mixed-use apartment building comprising 133 apartments over 14 storeys. The Tribunal considered that elements of the built form design, including building height, mid-tower setbacks and width of the tower that exceed the requirements of the DDO14 or Structure Plan, seek too much for a location where it is sought to minimise visual dominance when viewed from the Gould Street residences including those that back onto and front Kananook Creek. Specifically, it considered that:
- The building height should be reduced to meet the preferred height outlined under DDO14.
- The mid-tower setback from Kananook Creek Boulevard should meet the requirement specified in the Structure Plan, 2023.
- The tower form should be split and separated with a clear gap of at least 9 metres to allow for both a reduction in tower width and greater visual permeability for areas behind the site towards Port Phillip Bay.
- The public realm activation to Kananook Creek Boulevard and Nepean Highway as currently proposed requires further work to balance conflicting design objectives, i.e. the flood level requirements and the activation of the west façade at ground/street level.
- Public safety and crime prevention design should be at the forefront of design response with respect to the interface between the public and private realm.
- The proposed pedestrian link should be integrated with the adjacent pedestrian link proposed to the south in the now approved Harbour development.
See also:
- Guide to Planning Appeals: Activity centres > Structure plans
7. Tribunal’s role in consent orders
The Tribunal provided a timely reminder in Mann & Minhas Pty Ltd v Hobsons Bay CC [2024] VCAT 663 that it does not provide an automatic sign-off with consent orders.
The application for permit was for two double storey dwellings in proximity to a Major Hazard Facility. Council had refused the application and the matter went to compulsory conference without resolution. However, subsequent to the compulsory conference the permit applicant advised the Tribunal that the parties have reached agreement and now submitted consent orders signed by both parties.
However, the Tribunal refused to sign off the consent and referred the parties to AGL Loy Yang Pty Ltd v Department Head, Department of Economic Development, Jobs, Transport and Resources (Red Dot) [2016] VCAT 1249, which explains the role of the Tribunal in making consent orders to give effect to a settlement in a review proceeding, and the extent (if any) to which VCAT is required to consider or determine the merits.
In its Orders, the Tribunal requested the parties to consider how they should address the principles set out in AGL Loy Yang Pty Ltd (and any other relevant decision) to the facts and circumstances in this proceeding in their joint memorandum to the Tribunal for the hearing on 18 July 2024.
See also:
- Guide to Planning Appeals: Appeals > Consent Orders
8. Removal of restrictive covenants upheld by Court of Appeal
It may be recalled that in Viva Energy Refining Pty Ltd v Sumervale Pty Ltd & Anor (No 2) [2023] VSC 396 the Supreme Court ordered the discharge of the four restrictive covenants over part of the land on the basis that “the proposed discharge or modification will not substantially injure the persons entitled to the benefit of the restriction”, given that the lack of competition was not an intended benefit nor the purpose of the restrictive covenants.
The restrictive covenants prevented any buildings being erected other than a house, school, church or hall and prevented trade or business occurring on the land. The Respondents intended to develop a service station on the land, which was opposed by the Applicants who operate a service station on their own land.
The Applicants sought a review in the Court of Appeal in Sumervale Pty Ltd v Viva Energy Refining Pty Ltd [2024] VSCA 140 on the basis that:
- The trial judge erred in finding that the benefit of no commercial competition afforded by the restrictive covenants was not intended to be conferred or actually conferred by the restrictive covenants;
- The trial judge only considered the benefits of maintaining a low-density residential neighbourhood (a benefit which the Applicants were found not to enjoy) and did not consider the actual benefits conferred by the restrictive covenants (i.e. the commercial benefit);
- The trial judge did not adequately assess the substantial injury requirement as the restrictions on development are benefits in themselves;
- The trial judge erred in finding that there was no intention to benefit the dominant tenement by conferring a benefit of restricting trade and commerce; and
- The trial judge should not have considered other restrictive covenants on “other land in the parent title” as it was not relevant to any finding of substantial injury in the present case.
In upholding the Supreme Court’s decision, the Court found that:
.. it is significant that s 84(1)(c) hinges on the existence of a substantial injury and not merely the loss of the benefit of the restriction. The concept of injury connotes some harm or detriment and its use in the subsection suggests that is not the same thing as the loss of the benefit of the restriction itself. [58]
Thus, the loss of the benefit of the restrictive covenant itself is not in itself a substantial injury. However, the injury must be related to the intended benefit of the restriction:
Section 84(1)(c) does not prevent the removal of a restriction where the injury is unrelated to its intended benefit. To construe the section in that way would produce an entirely adventitious benefit and have the effect of extending the covenant to a circumstance that was never in contemplation. [62]
The Court considered that the intended benefit, being the preservation of neighbourhood character, was never actually enjoyed by the Applicants as the neighbourhood never became residential, and many similar covenants in the area had been removed so that other petrol stations could be built.
Further, the purpose of the restrictive covenants was to be determined by assessing the covenant as a whole. The purpose of a covenant was held to be “permanent and unchanging” by virtue of the fact that it runs with the land. The purpose of the covenants was never to restrain trade; so the substantial injury submitted by the appellants would not have been related to the intended purpose of the covenants, and as such, no such injury occurred. The Court ordered the discharge of the covenants.