VCAT Volume 11 No 10

1. Co-operative housing rolls out in Eltham

Practitioners will be aware of new, innovative ways of delivering housing, such as the ‘co-operative’ approach pioneered by the Nightingale development in Brunswick. This approach involves a group of like-minded  people coming together to buy land and develop dwellings to suit their own needs, with greater emphasis on communal facilities such as shared laundries and shared open space. The model also cuts out the ‘middle-man’, ie the developer.

The Nightingale model has been applied to a number of developments in metropolitan Melbourne and regional Victoria, and was the model underpinned by a proposed 21 dwelling development in Eltham considered by the Tribunal in Brougham Street Cohousing Pty Ltd v Nillumbik SC [2024] VCAT 360.

The planning report that accompanied the application described the proposal as follows:

The project is a citizen-led development to deliver at-cost housing that has a strong focus on environmental and social sustainability, community, more affordable home ownership and connection to nature. This development project has so far brought together 15 groups of owner-occupiers (referred to as The Brougham Street Collective) to develop the site for their own future housing.

The commercial delivery structure of a Building Group means that members of the Building Group (Brougham Street Cohousing Pty Ltd) are Joint Venturers. The Deed means each Joint Venturer will own one of the dwellings on its separate land title and have a share of the common property at the end of the process.

This model represents an alternative way to deliver more affordable housing which aligns future residents’ wants and needs with the housing product and allows for a sharing of facilities to foster a community connection.

Council refused the application. It had concerns with elements of the design response and its consistency with the requirements of the Eltham Gateway Design and Development Overlay, the impact on existing trees and insufficient space for new landscaping, non-compliance with objectives of Clause 55 and the design of the proposed car parking on site. There were also a number of objectors to the application, including the Eltham Community Action Group Inc.

The Tribunal was very effusive about the nature of the development and quite critical of Council’s position. It stated:

In 2021 a group of people formed a housing co-operative and decided the best way to tackle housing supply and affordability was to purchase a site and develop a series of dwellings around a plethora of communal facilities. In short, this group of people decided to take action to solve their own housing affordability issues.

This was by no means a half-baked idea. Instead, the group engaged highly respected professionals in a range of fields, including architecture, to design a series of dwellings that responded to the site’s constraints in an informed and clever manner. In a system where a development only needs to meet an appropriate or reasonable standard in order to gain a planning permit, it is our view that this proposal goes well beyond such measures. We have found that the proposal is an excellent response to its context both in terms of policy and its physical context. In summary, this is because:

    • The proposed development is contained on land within the Mixed Use Zone, which is intended to support higher residential densities, and in a location in which medium density housing is strongly encouraged by policy in the local planning scheme.
    • It has managed its interfaces so that from the public realm there will be minimal change, and arguably the streetscape will be improved.
    • It limits impacts upon its neighbours with effective site planning and additional landscaping.
    • It incorporates innovative architecture with a contemporary interpretation of what could be described as the Eltham style.
    • And perhaps most importantly, it involves a community focussed approach that minimises private space in favour of communal open space and facilities, and produces a housing opportunity that is presently not available in a location known for its sense of community and architectural innovation.

The proposed addresses the call for diversity in housing supply that is one of the key planks of the Nillumbik Planning Scheme. In our view, this is a project that could and should have been supported and fast tracked because of the qualities we have outlined above. That instead this project was met with substantial delays and opposition, is part of a wider trend we are observing, that will fail to produce appropriate housing projects that can start to address the existing shortfall of housing supply presently being experienced across Metropolitan Melbourne.

We find that the concerns of Council in particular arise from a misinterpretation of the role of the Eltham Gateway, and a failure to engage with the communal approach that drives the design. [2-5]

The co-operative approach to housing may not be taking the property market by storm, but there are increasing examples of this innovative approach which should generate more interest to home buyers. It is important that responsible authorities recognise the communal approach of this model requires some lateral thinking in applying the ResCode provisions.

See also:

  • Guide to Planning Appeals: ResCode

2. Another brick in Frankston’s Great Wall

One of the more controversial planning issues that has attracted considerable media attention, not least because of earlier Ministerial interventions, is Frankston’s Activity Centre Structure Plan and a proposal for a 14 storey mixed use building in the Promenade precinct. This proposal was recently considered by the Tribunal in Long Island Residents Group Inc. & Frankston Beach Association Inc. v Frankston CC [2024] VCAT 359.

A previous permit was issued in 2013 to develop an 11-storey office, retail and residential building on the subject land. This permit is live as several extensions of time have been granted.

Council supported the application but it was strongly contested by a local community group. It argued the proposal is inconsistent with the building height and built form requirements of Design and Development Overlay and that the height and built form are unsympathetic to the existing low rise buildings that predominate in the Kananook Creek precinct. Further, they argued the excessive height and bulk of the proposal will be visually intrusive and dominating and this will have unacceptable amenity impacts on the coastal foreshore and that the building will obscure important view lines and vistas, overshadow waterways and adjacent public spaces.

In supporting the application, the Tribunal stated:

We have concluded the proposal has struck the right policy balance, which is to facilitate higher and more intensive development on the subject site whilst also responding to Kananook Creek and the foreshore interface. This outcome is outlined in the design objectives in the DDO14 that state:

To encourage built form that creates a high quality backdrop when viewed from the foreshore reserve and Kananook Creek.

We must also assess the proposal against the provisions in DDO14. Whereas built form guidance was formerly within an adopted Council policy document, such as the 2015 Structure Plan and 2023 Structure Plan, controls are now in the Planning Scheme. Whilst DDO14 is an interim control, it is the assessment tool. This is consistent with the findings of the Tribunal in Three Towers Group Pty Ltd v Yarra CC [2022] VCAT 593 and Oxdra Pty Ltd v Stonnington CC [2012] VCAT 312.

We find the proposal is consistent with the vision of the Planning Scheme for this site as it includes higher built form and uses that contribute to the vitality of the FMAC. This includes activation of the ground level to Nepean Highway and Kananook Creek. Whilst the applicants have concerns about the height, setbacks, and visual bulk of the proposal, we consider the development is consistent with what the Planning Scheme envisages for this site and precinct. We will outline our reasons regarding built form further below. [78-80]

With the approval of the Frankston Activity Centre structure plan and approval of applications such as the one considered here will see a significant transformation of this activity centre, which is one of nine Metropolitan Activity Centres in Plan Melbourne 2017-2050.

See also:

  • Guide to Planning Appeals: Activity centres > Structure plans

3. Preferred maximum building heights – an end point or starting point?

Victoria’s largely performance-based planning system often raises issues as to how to exercise discretion.

In 25-29 Keilor Road Essendon Pty Ltd v Moonee Valley CC [2024] VCAT 379, the Tribunal considered an appeal against a Council refusal for a 11 storey mixed use building in the North Essendon Major Activity Centre. Council officers had recommended to the Council that the application be approved.

The Design and Development Overlay (DDO) applying to the land states that preferred maximum building height is ‘up to 6 storeys (21m) on key sites’. Both Council and the Applicant did not disagree that the subject site is a key site.

On how to approach the non-mandatory controls in the DDO, the Tribunal stated:

The planning scheme is drafted in a way that encourages permit applications which are subject to DDO7 to meet, rather than exceed, preferred maximum heights. This infers a preferred ‘end point’ rather than a ‘starting point’ when assessing the acceptability of building height. If a contrary intention were to be the case, I would expect the requirements contained in Table 1 of clause 2.0 to Schedule 7 to be expressed differently. For example, these requirements could have referred to ‘preferred minimum building heights’.

Instead, the requirements for preferred maximum building heights are just that – they are expressed as upper limits and adopt the phrase ‘up to’ in Table 1 to clause 2.0 when describing preferred maximum heights. Similarly, clause 15.01-1L for urban design also seeks to ‘Encourage developments up to but not exceeding preferred heights’.

That said, it would be wrong to approach the preferred DDO7 requirements as an absolute end point or maximum that must never be exceeded. These controls are drafted as discretionary rather than mandatory requirements.[105-107]

In concluding the height was excessive given the preferred height in the DDO, the Tribunal concluded:

I have no difficulty with the concept of a development that exceeds the preferred maximum heights expressed for this location. I fully agree with the applicant’s position that this site is presently underdeveloped and provides an excellent opportunity to contribute to both commercial activity in this precinct and the delivery of more housing in a well serviced location at a time of short supply.

However, the degree to which this proposal seeks to depart from the DDO7’s preferred maximums, is in my view too substantial and contrary to principles of orderly planning. On my reading of relevant material filed, including planning scheme policies and the four background documents, the various requirements that appear in Schedule 7 were purposefully crafted to support and manage buildings with heights and forms of an order and magnitude expressed as ‘preferred’. [140-141]

The Tribunal’s conclusion that the proposal being almost double the preferred number of storeys was a bridge too far in its exercise of discretion. It also found the proposal would not maintain the ‘local village’ character of the centre, contrary to strategic directions for this activity centre described in Clause 02.03-1 of the Moonee Valley Planning Scheme.

See also:

  • Guide to Planning Appeals: Height > Exercise of discretion

4. Removal of a municipal reserve in private ownership

In a somewhat unusual case, in Kilmore Racing Club Inc. v Mitchell SC [2024] VCAT 272, the Tribunal considered a proposal to remove a reserve for ‘municipal purposes’ that was in private ownership.

The subject parcel of land is one of three sites that was transferred to the former Shire of Kilmore in 1983. The parcel was then transferred to the Kilmore Racing Club one year later. In 1999, the review site was rezoned to Public Use Zone as part of the introduction of new format planning schemes.

In 2021, the Minister for Planning gave authorisation for a rezoning application to rezone the land to General Residential Zone with a Development Plan Overlay. In 2022, a Panel recommended that the proposed rezoning application be abandoned, citing the need for further strategic work in order to justify the GRZ zoning, where the Kilmore Structure Plan (KSP) seeks the site be rezoned to Special Use Zone related to equine uses.

Clause 52.02 of the Victoria Planning Provisions state:

To enable the removal and variation of an easement or restrictions to enable a use or development that complies with the planning scheme after the interests of affected people are considered.

The Council had overturned an officer’s recommendation to support the removal of the reservation. At the Hearing, Council submitted the broader considerations in this case are:

  • whether the removal of the Reserve is intended to enable any particular use or development;
  • the acceptability of removal having regard to the decision guidelines in Clause 65; and
  • what is the detriment to the interests of affected people.

The Applicant contended that the primary consideration in this case is whether there is anything proposed by the municipal council for this land.

After consideration of a number of relevant cases, including Dourahalis v Monash CC [2008] VCAT 539, Hatswell & Anor v Casey CC [2009] VCAT 2702 and Murphy v Bayside CC [2010] VCAT 2070, the Tribunal, in supporting the application, concluded that:

On balance, the strategic direction for the review site is for it to be rezoned to Special Use Zone consistent with the racecourse land. Any notion that the land is earmarked for public open space (in its true sense) is unsupported by any material or evidence identifying such a specific outcome for the site for such a purpose. The strategic intent for the site as future public open space is broad, at best and countered by other designations.

The extent to which the ‘public’ has an interest in the land is extremely limited based on the ownership of the land being private. The ownership of the land is critical to this assessment in my view and is a key difference when comparing the other cases that the council referred me to and which I have referenced above.

The perception that the review site has been public open space because it has merely been unfenced and informally used for a long period of time has obviously given rise to the sentiment in the community that it is, and should remain as public open space. Perhaps it could even be said that the applicant has not helped itself in this regard given the history of its use and what is now sought. However, the fact remains that the land is in private ownership and at no stage has the council formally sought to acquire the land by any means and the strategic planning for the site has not specifically identified it for public purposes in the true sense.

Whilst the removal of the reservation status will not objectively enable a use or development to occur, I find that this is of lesser importance where the purpose of the municipal reserve is effectively redundant due to the ownership of the land and the lack of any strategic intent for the site to be used for municipal purposes. [77-80]

See also:

  • Guide to Planning Appeals: Reserved land > Tests for removal

5. Secondary consent cases in the City of Melbourne

Two recent cases in the City of Melbourne as to whether amendments to plans should have been decided under secondary consent processes and the consideration of the ‘Westpoint’ criteria highlights the complexity that such cases can raise.

In the first case, Victton Pty Ltd v Melbourne CC [2024] VCAT 292, Council refused to approve a request to amend plans associated with a permit for a 20 storey mixed use building approved in 2017.

In general terms, the amended plans proposed the following changes:

  • The internal areas of the ground floor are raised by one metre (from 2.0 metres AHD to 3.0 metres AHD to respond to new flood level data provided by Melbourne Water). This raises the maximum height of the proposed building from 73 metres AHD to 74 metres AHD.
  • A new façade scheme, the replacement of a first floor apartment with a gym, a reduction in basement car parking spaces from 67 to 56 and a reduction bicycle spaces from 194 to 123.

Council submitted that having regard to the Westpoint criteria that a proposed change must be of ‘no material consequence having regard to the purpose of the planning control under which the permit was granted’. Since the grant of the permit, the Mixed Use Zone (MUZ) had been amended (but not relevantly) but there had been wide ranging changes to the Design and Development Overlay (DDO).

In addressing the  issue of detriment as part of the secondary consent process, Council argued that visual bulk and overshadowing were detrimental having regard to increased wall and overall building height. However, the Tribunal dismissed this submission because firstly, the purposes of the MUZ and DDO as they existed when the permit was issued did not have a specific purpose or decision guideline relating to the two impacts the Council specified; and secondly, the changes as they affect the apartments in a nearby three-storey building are not material having regard to the plans for that building that were tendered at the Hearing.

The Council also argued that the detriment principle is not met because of the impact of changes to the ground level design having regard to the purposes of the DDO. This submission was supported by the Tribunal on the basis that the changes to the frontages are:

  • less pedestrian oriented and that occupants of the ground floor are less able to ‘engage with the street’ and the changes are objectively of a material consequence having regard to the purposes of DDO as it existed in 2017; and
  • a ‘less attractive pedestrian environment’ and the internal layout has a weaker relationship with the public realm and the changes are objectively of a material consequence having regard to the purposes of DDO as it currently exists.

In addition, Council argued the amended plans breached a requirement under the DDO relating to public interfaces. Whilst this was not a mandatory requirement, the Tribunal found the requirement is not met but did not accept the Council’s argument the Applicant did not benefit from an accrued right.

In the second case, Tiller v Melbourne CC [2024] VCAT 318, a third party sought a declaration under section 149B of the Planning and Environment Act 1987 that Council should not have approved an amendment to a plan involving alterations and additions to an attached dwelling. Of concern to the third party was loss of privacy arising from overlooking.

The amended permit included a condition that there be changes to the screening of the window from the master bedroom ‘in line’ with a detailed sketch plan that had been prepared by the architects.

The Applicants contended that the difference in the:

  • number of louvres (seven as opposed to eight),
  • spacing between each louvre (although undefined by the applicants),
  • shape of each louvre (elliptical as opposed to rectangular) results in a wider aperture between each louvre

provides material to support their submission that the second set of endorsed plans are not ‘in line with’ the sketch plan and the decision is ultra-vires.

The Tribunal noted that the Applicants need to demonstrate that the screening shown in the second set of endorsed plans is not ‘in line with’ and in doing so, need to address the purpose of condition 1e of the permit. Whilst acknowledging that overlooking is important to the Applicants, the Tribunal considered the condition allows for an alternative screening solution, otherwise condition 1e of the permit would not have included the phrase ‘in line with’. It stated:

As a matter of fact, seven louvres, set upwards at an angle of 70 degrees, with an elliptical shape and at a thickness of 50mm at its thickest addresses overlooking, in line with the sketch plan. This is because, the views from that window are directed upwards and away from the applicants’ land whilst still maintaining unobstructed distant views. Thus, overlooking to the applicants’ land has been preserved in line with the outcome sought by the sketch plan and the purpose of the planning control under which the permit was granted.

If follows that council did not misconstrue condition 1e of the permit and its decision to be satisfied with the second set of plans is not ultra vires. [119-120]

The Tribunal’s analysis included detailed consideration of the Westpoint criteria as set out in Westpoint Corporation Pty Ltd v Moreland CC (Red Dot) [2005] VCAT 1049. Reference is also made to other relevant cases, most particularly Cook v Mornington Peninsula SC (Red Dot) [2017] VCAT 1129 and OZ Property Group v Moonee Valley CC (Red Dot) [2014] VCAT 529.

Similar to Cook in that the matter in Tiller could at one level be seen as a relatively straightforward matter involving screening to address overlooking, the secondary consent process and consideration of Westpoint criteria make for complex decision-making.

See also:

  • Guide to Planning Appeals: Permit > Amendment to permit > Secondary consent

6. Should a permit be cancelled for failing to send an NOD to objectors?

In McKay v Minister for Planning [2024] VCAT 327, objectors to an application for the construction of a dwelling and car parking and vegetation removal at Hotham Heights did not receive the Notice of Decision (NOD).

The Minister accepted the permit was issued without providing the Applicants with the notice required under section 64(1) of the Planning and Environment Act 1987 (P&E Act). The NOD to grant the permit was not sent to any of the fifteen objectors due to a “process error with DEWLP’s Permits Online system”.

Section 87(1) of the P&E Act sets out six grounds on which the Tribunal may cancel or amend any permit. Relevant to the proceeding, the Tribunal may cancel a permit if it considers there has been ‘any material mistake in relation to the grant of the permit’ or ‘any failure to give notice in accordance with this Act’.

The request was made on the basis that there was a material mistake in relation to the grant of the permit, however the Tribunal considered the facts did not support this ground. There is a well-established distinction between the making of a decision to grant a permit and the issuing of a permit, which are separate administrative actions. In Couper v South Gippsland SC (includes Summary) (Red Dot) [2009] VCAT 1204, the Tribunal  described the difference as follows:

The issue of a permit is an administrative action that implements a decision. The decision to grant a permit and the issue of the permit are separate actions.

The Tribunal also noted the distinction is reflected in the language used in sections 85 and 86 of the P&E Act following the determination of a review proceeding by the Tribunal. In the case of a refusal, the Tribunal grants the permit and directs the responsible authority to issue the permit. But where the decision to grant a permit was already made by the responsible authority, the Tribunal may affirm the decision and order the responsible authority to issue a permit. It stated:

I consider this to be an important distinction in a case such as this, where the applicants’ grounds for seeking cancellation of the permit is that they were not provided with notice of the decision to grant a permit, which is a requirement of section 64(1) of the PE Act.

What the applicants are really alleging is a material mistake in the issue of the permit, but there is no such ground available for cancelling a permit under section 87 of the PE Act. In light of this, I do not consider that it is open for the Tribunal to cancel the permit on basis of ground (c) – ‘any material mistake in relation to the grant of the permit’.

I recognise that the Tribunal in Utber v Casey CC [2011] VCAT 2371 took a different approach, finding that the council’s failure to give notice of its decision to grant a permit before issuing the permit, was likely a material mistake in relation to the grant of the permit. I do not agree with this approach.

However, the Tribunal stated that it would be open for it to cancel the permit on the basis of ground (e) − ‘any failure to give notice in accordance with this Act’. It was not in dispute that the Minister was required by section 64(1) of the P&E Act to give notice of its decision to grant a permit to each person who objected. The Tribunal was satisfied that the Applicants are persons who objected to the permit application and should have been provided with notice of the decision.

Having regard to section 89(1)(b) of the P&E Act, section 91(3) requires the Tribunal to be satisfied that, in cancelling a permit, the person was substantially disadvantaged by the matter set out in the request and it would be just and fair in the circumstances to cancel the permit. However, none of these thresholds were met to the Tribunal’s satisfaction and the Applicant’s request was refused.

See also:

  • Guide to Planning Appeals: Permit > Cancellation of permit > Whether just and fair to cancel a permit

7. Will a store compromise Fishermans Bend employment objectives?

In Port Melbourne Storage Pty Ltd v Melbourne CC [2024] VCAT 332, Council had refused an application for a four storey building to be used for self-storage, comprising 469 storage docks. The Fishermans Bend Taskforce, established in 2016 to lead the planning for Fishermans Bend, including to develop precinct implementation plans, was opposed to the application.

Council refused the application on three grounds, including:

  • the proposal’s failure to achieve the objectives and strategies for the Fishermans Bend Employment Precinct and reasonable adaptive re-use to further the Precinct’s objectives; and
  • the excessive floor area ratio that fails to achieve the design objectives and decision guidelines in DDO74; and
  • the inappropriate built form and design outcome.

The Taskforce’s grounds opposing the permit application included, inter alia, the proposal’s misalignment with the vision for the Fishermans Bend National Employment and Innovation Cluster (‘NEIC’), as an internationally renowned centre of innovation in advanced manufacturing, engineering and design.

In setting aside Council’s decision and granting a permit, the Tribunal considered that:

  • the whole of the land is used for self-storage, including lot S3 which comprises shipping containers and a shed/building that is also used for storage;
  • even if the shed/building and/or shipping containers do not have a planning permit (assuming one was required and has not been obtained) the existing use of the land is not in dispute; and
  • no permit is required to use the land for a warehouse (self-storage) under Clause 34.02-1.

Further, the Tribunal considered that this is not a case where a new land use is being proposed; rather, the permit application would facilitate additional storage in a purpose-designed four storey building on a site used for this purpose for many years.

Whilst agreeing with the Council that the development of the subject land would likely limit the prospect of its use only for new advanced manufacturing, engineering, design and tertiary education, the Tribunal stated:

However, the current controls do not mean every site will accommodate advanced manufacturing, engineering, design businesses or a new/expanded tertiary education land use. This is evident:

    • by the fact that a range of as-of-right uses are allowed by clause 34.02 and could potentially be established without any planning permissions being required (for example, in an existing building with the required car parking). This could include self-storage on another site.
    • nothing in clause 34.02 precludes land uses in the NEIC that are other than advanced manufacturing, engineering, design and tertiary education.

At a future time, an implementation plan may provide bespoke or refined controls that change the basis for assessing a planning permit application, but that is not the current planning framework and regime.

The Council’s grounds of refusal appear to take a very restricted view of the types of uses to be accommodated within this zone. They do not appear to take account of, and/or give weight to, policies in clause 02.03-6:

Support the development of Fishermans Bend Employment Precinct as a National Employment and Innovation Cluster and as the City’s primary industrial area and the preferred location for clean, advanced manufacturing, research and development, and ancillary services.

Ensure the development of commercial and retail uses in the Fishermans Bend Employment Precinct supports the vision for the precinct as Australia’s leading design, engineering and advanced manufacturing precinct. [Tribunal emphasis added]

The Tribunal was also satisfied with the design and built form aspects of the proposal.

See also:

  • Guide to Planning Appeals: Store, Policy

8. Another case involving an MHF in Hobsons Bay

We commented on a number of cases involving developments for residential and other uses in proximity to MHFs in Hobsons Bay in Vol 11 No 7 and Vol 11 No 9. One of the cases considered in Vol 11 No 7 was Adaptive Constructions Pty Ltd v Hobsons Bay CC [2024] VCAT 35, where the Tribunal upheld a refusal for three two storey dwellings that is approximately 520 to 540 metres from the Qenos Olefins plant and the wider Altona petrochemicals complex.

In the most recent case, Smith v Hobsons Bay CC [2024] VCAT 355, the Council refused an application for two double storey dwellings located within the outer safety area (‘OSA’) of the Qenos facility. WorkSafe advised against approving the development.

The key matter to be addressed in the proceeding was the same as in Adaptive Constructions, that is whether the risk to future occupants posed by the operations of the Qenos facility would represent an incrementally unacceptable increase in societal risks or unacceptable risks to the future residents.

The Tribunal distinguished on the facts the current proceeding from Adaptive Constructions in that the subject site is on the outer margins of the Outer Advisory Area (OSA) and was included in one OSA, whereas in the Adaptive Constructions the site is in two OSAs. In finding the level of risk to be acceptable in the current proceeding, the Tribunal stated:

The context of the location, the low probability of exposure to a limited range of impacts leads to a conclusion that the consequences of occupants at the subject land to an incident at the Qenos facility would be limited in nature and extent. It follows that the risk of impacts on the safety and health of the occupants of the proposed dwellings would be at the low. [49]

See also:

  • Guide to Planning Appeals: Risk