1. Challenges to planning decisions and processes on human rights grounds

Two recent cases have involved issues about the Victorian Charter of Human Rights and Responsibilities Act 2006 (Charter) and its relevance to planning and planning processes.

In the first case, Bespoke Development Group Pty Ltd v Merri-bek CC [2023] VCAT 758, the Council refused an application for a seven level apartment development. One of the grounds of refusal related to a contravention of the Charter on privacy and protection of families. One of the grounds of appeal lodged by the Respondent, who lives on the adjoining property and had objected to the application, was that the Tribunal, as a public authority, is obliged to give consideration to the Charter when determining the application.

At a practice day hearing, the permit applicant sought the grounds relating to human rights be struck out pursuant to section 75 of the Victorian Civil and Administrative Act 1998 (VCAT Act). In essence, it was argued that the relevant rights are limited and because being contrary to the Charter is not in itself a proper ground of refusal.

Relying on Smith v Hobsons Bay CC (includes Summary) (Red Dot) [2010] VCAT 668, the permit applicant contended:

The decision confirms that responsible authorities may not disregard the planning scheme and its important collective goals in favour of Charter rights of individual. The rights of individuals can be considered through the planning scheme, which is the end result of a previous balancing of the rights and interests of the many different humans that the planning scheme affects, through the development of planning controls and policy.

As a starting point, the Tribunal made clear that its interpretation of the permit applicant’s submission was that the Charter itself is not relevant to the decision-making exercise that is before the Tribunal; rather, the Applicant submits that either the specified Charter rights are not relevant to the proposal, or, that section 38(2) of the Charter operates so that section 38(1) of the Charter does not apply.

On whether Council’s ground of refusal on human rights should be struck out, the Tribunal held that despite the precise wording of the Council’s ground of refusal, it can be interpreted to mean that the Council considers that the proposal is ‘incompatible’ (to employ a word used in section 38(1) of the Charter) with the Charter, in so far as those referenced Charter rights are concerned.

On whether the Respondent’s ground on the should be struck out, the Tribunal did not regard it to be as clear cut as put by the Applicant that the Charter rights:

  • are not limited; or
  • the limit is acceptable under the Charter; or
  • section 38(2) of the Charter operates so that section 38(1) does not apply.

The Tribunal was not persuaded “that it is clearly the case”, as put by the permit applicant, that the Charter rights relied upon by the Council and the Respondent were not relevant to the planning decision-making before the Tribunal; or were not limited by the proposal; or that that limit under planning law is reasonable and demonstrably justified having regard to the matters set out in section 7(2) of the Charter.

To strike out the ground under section 38(2) of the Charter, the Tribunal stated that it would need to be persuaded that the reliance by the Council and the Respondent on the Charter was absolutely hopeless, clearly untenable or obviously unsustainable in fact or law, which it found not to be the case. In reaching this conclusion, the Tribunal distinguished the codification of “rights” under planning, which has more discretion, to that under criminal law, which is more “black and white”.

Throughout the Tribunal’s reasonings, it was at pains to point out that full consideration of the relevance of human rights needed to be considered in the context at the merits hearing; it was merely dealing with a “summary stage of the proceeding”.

In the second case, Dickson v Yarra Ranges Council [2023] VSC 491, the Plaintiff sought orders prohibiting the Council from approving an Urban Design Framework (UDF) for one of its town centres, based on a lack of community engagement, and requiring the Council to extend the consultation period by a further 12 months.

In relation to human rights, it was contended that the Council was acting incompatibly with human rights protected by the Charter, specifically the rights to privacy, to freedom of expression, and to participate in public life. This followed a Council decision to hold its meetings on-line with the public able to participate in the meetings via Zoom. In person meetings resumed in July 2023, but with new registration requirements for any member of the public wishing to attend a meeting.

The Court held that the Council is required by section 38 of the Charter to act in a way that is compatible with the right to participate in public affairs in section 18(1) of the Charter. It stated that this does not give any person who wishes to say something about the UDF the right to dictate the terms of their participation. A community engagement plan designed and delivered in accordance with the Council’s Community Engagement Policy is unlikely to limit the right to participate in public affairs simply by specifying the ways in which members of the public can engage with the Council about the UDF.

The Court also held that Council did not breach its obligations under the Local Government Act 2020 in relation to engaging with the community.

It has been widely commented on that the Tribunal’s determination in Bespoke Development Group is a game changer in relation to human rights and planning. However, as the Tribunal itself stated, its consideration of human rights in the context of a practice day hearing rather than a full merits hearing should be kept in mind, particularly given the high bar to summarily strike out applications under section 75 of the VCAT Act. Unfortunately we do not know the extent to which the relevance of human rights would have been tested, as the matter was settled at a compulsory conference and did not proceed to a full hearing.

Notwithstanding, given the significance of the decision, this decision may have been one worthy of ‘red dot’ status.

It would appear that the issue of human rights was not as tested in great detail in Dickson as in Bespoke Developments. However, it should not go unnoticed that human rights issues are appearing to be increasingly front and square of planning issues and planning processes.

See also:

  • Guide to Planning Appeals: Natural justice, Charter of Human Rights and Responsibilities Act 2006

2. Does landscaping fall under the gardening exemption?

An interesting issue arose in 696 Geelong Road Brooklyn Pty Ltd v Brimbank CC [2023] VCAT 752 as to whether proposed works involving a fence and landscaping works required a permit.

Application was made for the addition of a perforated black metal screen attached to the street side of an existing metal fence and associated landscaping. The site stores building materials, with some stored outside in the front setback. The site is in the Industrial 1 Zone and a Design and Development Overlay applies to the land.

Council notified the Applicant that the site was in breach of the ‘as of right’ warehouse use provision because goods were stored outside. It instructed the Applicant to cease using the land and remove all externally stored goods until they had the proper planning approval.

The Applicant contested the Council’s position. They contended that the goods are stored in an orderly fashion that is acceptable in this context. In an attempt to resolve the matter, they applied for a planning permit to screen the externally stored goods by placing a screen on the front fence and by planting a hedge behind it. However, Council refused the application.

Council submitted that:

  • The proposed 2m landscape strip is well under the 5m width required by DDO11;
  • The 2m width is inadequate and fails to address the issues raised in respect of the operation and presentation of the site; and
  • The proposal fails DDO11’s design objectives because it:
    • fails to make a positive streetscape contribution;
    • does not protect surrounding residents and businesses from adverse impacts of noise, dust and visual clutter; and
    • fails to provide a high quality landscape treatment that enhances the precinct.

The Council also submitted that the proposal is a package of works, and this ‘packaging’ makes the landscaping requirements of DDO11 a relevant consideration.

In a subsequent submission, Council contended that planting the proposed hedge is gardening but that preparing the garden beds and installing irrigation is not. It says these are works that require a permit. Council relied on Trembath v Manningham CC [2018] VCAT 1090, which found that tree planting and mulching were gardening, but constructing the driveway and batter were not.

The Applicant contended that no permit is required for the ‘associated landscaping’ as these works fall within the definition of ‘gardening’ for the purposes of Clause 62.02-1. They relied on Voges v Port Phillip CC [2013] VCAT 2134, which addressed the question of whether the planting of vegetation on the foreshore reserve at St Kilda required a permit under a DDO. The Tribunal found that, although the planting of vegetation was within the definition of ‘works’ for the purposes of the Planning Scheme…

The inclusion of gardening in the general exemption provision of Clause 62.02-1 for buildings and works not requiring a permit, implies that the planting of vegetation may fall within the definition of works, but it is not intended to require a permit for the planting of vegetation in any circumstance where the planting of such vegetation would be construed as gardening.

The Tribunal held that all aspects of the ‘associated landscaping’ of the proposal fall within the ‘gardening’ exemption of Clause 62.02-1. It stated that in examining what triggers a permit in a proposal is a necessary step in the statutory process. It further stated:

Descriptions of proposals and the accompanying plans often include elements that do not trigger a permit, and it is important to sift out the relevant elements. This exercise must occur before commencing an assessment as only the elements that trigger a permit are to be measured against requirements or assessed against the decision guidelines. [28]

In this matter, the Tribunal considered the Applicant was seeking to preserve the site’s ‘as of right’ warehouse use provision by undertaking works that improve the site’s appearance and that along the way, the height of the fence has triggered a permit under the ‘new development’ control that is DDO11.

In this context, the Tribunal was persuaded that the planting of the hedge is best characterised as being undertaken voluntarily rather than being characterised as either part of a ‘package of works’ of a new development or as ‘landscaping’ and that this voluntary undertaking falls under the definition of ‘gardening’ in the terms of the Planning Scheme.

See also:

  • Guide to Planning Appeals: Buildings and works

3. Compensation for Outer Metropolitan Ring/E6 Transport Corridor reservation

Amendment VC68 applied the Public Acquisition Overlay (PAO) in 2010 to land reserved for the Outer Metropolitan Ring/E6 Transport Corridor (OMR) to part of a property located within the Urban Growth Boundary in the northern outer suburb of Beveridge.

In Kajag Pty Ltd v Head, Transport for Victoria [2023] VSC 392, the Applicant claimed compensation under sections 98(1)(a) and 106 of the Planning and Environment Act 1987 (P&E Act) for ‘financial loss suffered as the natural, direct and reasonable consequence’ of its land being reserved for a public purpose. The Responsible Authority, Head, Transport for Victoria (the Authority), accepted that the sale price was reduced because part of the property had been reserved for the OMR.

However, the parties were in dispute about the amount of the Applicant’s loss. The Applicant claimed to be entitled to compensation in the order of $30,000,000 on the basis that, but for the reservation of its land for the OMR, the highest and best use of the whole property would have been for future urban residential development. The Authority’s position is that the future urban use of the property would have been industrial, and that Applicant’s financial loss is closer to $2,000,000.

The Court found that financial loss on the sale of the property as the natural, direct and reasonable consequence of the property being reserved by the Scheme was $5,999,250 (including interest component). It reached this conclusion on the basis that:

  • on the question of highest and best use, having regard to the competing planning evidence, the property would likely have been zoned and developed for industrial purposes and not for residential purposes;
  • in the absence of the Scheme, no part of the property would have been required for waterways and flood protection. The whole area would have been available for development; and
  • there was no real likelihood that any of the southern part of the property would have been required for the Kalkallo Creek Retarding Basin, in the absence of the Scheme.

The amount of compensation was based on the Court’s findings on the valuation evidence provided to it.

The Court’s detailed analysis of the historical development of the planning framework applying to the area may be of interest to practitioners.

See also:

  • Guide to Planning Appeals: Compensation

4. Discharging of covenants upon death of covenantor

In Re Pulitano Properties Pty Ltd [2023] VSC 404, the Supreme Court granted an application for the discharge of three restrictive covenants pursuant to section 84(2)(b) of the Property Law Act 1958.

In effect, each covenant prohibits the erecting of a building on the subject land unless approval for such building has been obtained from the covenantor (‘Ms Lipscomb Requirement’).

A previous application to redevelop the site had been refused by the Tribunal in Pulitano Properties Pty Ltd v Yarra Ranges SC [2022] VCAT 32. The refusal was on both substantive town planning grounds such as visual bulk, traffic and poor landscape response and in light of the covenants.

The Court required notice of the application to all parties who may have the benefit of the restrictions contained in the covenants by requiring direct notice. A sign containing the Notice on the subject land was also required.

One objection made on behalf of several other objectors was lodged, though no objector wished to be heard by the Court.

The Court held that since the prohibition is absolute, in that the erection of any building on the subject land is prohibited unless written approval is obtained from the covenantor,  the exception of obtaining the covenantor’s consent to the erection of any building on the subject land is no longer possible, then the subject land is sterilised such that the covenants are discharged once that consent can no longer be obtained. The Court was satisfied that the covenantor was dead.

Further, by the terms of the covenants, the Court held that there is no power that is conferred on the covenanter’s heirs, executors, administrators and transferees.

With respect to the sterilisation of the land, the Court considered the analysis in 196 Hawthorn Road Pty Ltd v Duszniak [2020] VSC 235 and Lahanis v Livesay [2021] VSC 29 to be compelling: preventing any development without approval means that the land is sterilised where it is impossible to obtain consent, which is what has happened in this case.

See also: 

  • Guide to Planning Appeals: Restrictive covenants > Supreme Court applications

5. Removing single dwelling covenants to facilitate a service station

In Viva Energy Refining Pty Ltd v Sumervale Pty Ltd & Anor (No 2) [2023] VSC 396, the Supreme Court considered an application to remove restrictive covenants pursuant to section 84(1)(c) of the Property Law Act 1958 (PLA).

The single dwelling covenants prevent any building being erected on the land other than a dwelling house, school, church or hall and outbuildings thereto, and prevent any trade or business being carried out upon the land. The Plaintiff intends to construct a service station on the land which dispenses hydrogen, gasoline and diesel, and which offers fast charging stations for battery electric vehicles.

The Defendants are the registered proprietors of a service station approximately 1.1km from the subject sites.

The sites subject to the covenants were not developed for residential purposes and are in the Industrial 1 Zone with access to the Princes Highway.

The Defendants submitted that, in approaching the task set out in section 84(1), the Court must focus on the individual restrictions. In doing so, the Defendants submitted that the first question to consider is, do the beneficiaries enjoy any practical benefits from the restriction as against trade or commerce, or indeed, the other two restrictions that prevent construction of a service station?

The Defendants submitted that the second question is, would the discharge or modification cause substantial injury? They said that the burden of proof lies on the Plaintiff to negate the existence of those practical benefits, and to negate any substantial injury.

The Court noted that the essential difference between the parties as to the approach that the Court should take, when considering whether the Plaintiff has satisfied the requirements of section 84(1)(c) of the PLA, boiled down to the following: is the Court to look at the covenants as a whole to discern their purpose, as part of assessing the benefits initially intended to be conferred and actually conferred by the covenants (the Plaintiff’s approach); or does the Court look solely at the restrictions contained in the covenants themselves to elucidate the benefits (the Defendants’ approach)?

In effect, the Court considered that the Defendants believe the Court should focus on whether the Defendants were intended to be conferred, and were actually conferred, a benefit by the ‘no trade or business’ restriction on the land, without reference to the purpose of the covenants. If so, the question then is whether the removal or modification of the covenants would substantially injure the Defendants if the benefit did not remain or was adversely affected.

The Court held that the Plaintiff’s approach was to be preferred and was consistent with the authorities, whereas the Defendants’ approach was not.

The key consideration was whether the removal of the restrictive covenants would adversely affect their purpose and benefits. The Court stated:

I accept the Plaintiff’s evidence and submissions as to the purpose of the Covenants. In coming to this view, I have not had regard to the town planning aspects such as the change in zoning of the Land and its surrounds, but to the terms of the Covenants themselves, and to the network of covenants in the neighbourhood at around the time they were created.

It is abundantly clear from the terms of the Covenants that the purpose of the Covenants was to create a residential neighbourhood of low density, quality, and residential amenity. It is also abundantly clear from the terms of the Covenants that the restrictions on use (no trade or business) and types of buildings (only dwellings, schools, churches or halls and outbuildings thereto) were to ensure the residential amenity of the neighbourhood.  

The benefits intended to be conferred were the benefits associated with living in a residential neighbourhood of low density, quality, and residential amenity. The restriction on use, that is, no trade or business being conducted on the Land, was intended to confer the benefit of residential amenity. [184-186]

As to the Defendant’s contention that because they have the benefit of a trade or business, which they said was a practical benefit, and that this benefit should be protected by refusing the Plaintiff’s application, the Court held this is not a practical benefit intended to be conferred by the covenants on the beneficiaries of the covenants – that is, the benefit enjoyed by the Defendants from having no commercial competitor on the land is not a benefit initially intended to or actually conferred by the covenants.

See also:

  • Guide to Planning Appeals: Restrictive covenant > Supreme Court applications

6. The impact of sea level rise on a boatshed

Concerned with lack of information on potential impacts of sea level rise on a proposed boatshed, the Tribunal in Strobe Family Nominees Pty Ltd v Mornington Peninsula SC [2023] VCAT 748 adjourned proceedings and ordered the Applicant to obtain expert evidence and circulate it prior to an adjourned third day of hearing.

The proposed boatshed is a modern contemporary design and is positioned in proximity to and will be seen in juxtaposition with other built form and structures in the vicinity. It has a modest height, scale and footprint with robust materials that will withstand the coastal climate.

Council was opposed to the boatshed though it was supported by the Department of Environment, Land, Water and Planning (DELWP). The Tribunal found it difficult to reconcile these favourable comments with the position taken by Council given DELWP’s wide ranging coastal responsibilities, though stated “council is entitled to its opinion”.

The Tribunal accepted expert evidence provided by an oceanographer that recommended that the Finished Floor Level (FFL) be raised from 1.38 metres Australian Height Datum (AHD) to 1.68 metres AHD. A higher FFL level will be:

  • well above the predicted normal tidal influence at 2100
  • above the predicted inundation level at the 1% AEP risk threshold until almost 2090
  • above the predicted inundation level at the 1% AEP risk threshold including an allowance of 0.3 m for waves until after 2050
  • above the predicted inundation level at the 10% AEP risk threshold, including waves, until about 2075.

The Tribunal agreed with the expert evidence that constructing the FFL of the boatshed at 2.7 metres AHD would seriously compromise the function of the boatshed given the need to move watercraft in and out to the water. However, the Tribunal imposed a condition that the FFL be raised to 1.75 metres AHD consistent with a nearby boatshed approved by consent.

See also: 

  • Guide to Planning Appeals: Coastal impacts

7. Is the lodgement of an application a judicial act? And what has the nullity of a marriage got to do with it?

In an application involving whether a permit applicant had lodged an appeal within time or not, submissions were made referring to an unreported 1913 High Court case Miller v Teale [1954] HCA 68 in which a husband petitioned for a decree of nullity of his second marriage, on the basis that when the parties went through the ceremony of marriage, and despite the decree absolute for the dissolution of the prior marriage having been made, the ceremony took place before the expiration of the period within which neither party was permitted by law to remarry.

For the purposes of that case, the time at which the order absolute was made was deemed to have been in the morning, whereas the marriage occurred in the afternoon. However, due to the operation of legislation, there was a period of some months that needed to pass between the order absolute and a subsequent marriage.

For the purposes of the present case, Giardina v Banyule CC [2023] VCAT 781, the Applicant drew an analogy between the lodgement of the application for review and the ‘acceptance’ of this by the Tribunal and the judicial act of the making of an order absolute in Miller. It was submitted that the acceptance of an application for review is a judicial act of the Tribunal and, accordingly, the Applicant can rely on the doctrine ‘that judicial acts are to be taken always to date from the earliest minute of the day in which they are done’.

In distinguishing Miller on its facts, not just because it deals with very different subject matter but because it is dealing with an order nisi and an order absolute, the Tribunal stated [at 47-48]:

I do not accept that the commencement of a proceeding in this Division is properly described as a judicial act. Rather, the commencement of a proceeding in this Division is an administrative act involving the application being received into the Tribunal’s electronic system with its date and time of lodgement electronically recorded. At that point in time, there has been no review of the application; it is simply recorded as having been received by the Tribunal.

It is at a later point in time that the application is reviewed and, where appropriate, various orders may be made by the Tribunal including:

    1. an initiating order that schedules a hearing date and requires certain procedural steps to be undertaken by the parties;
    2. an order referring the application to a practice day hearing or a preliminary hearing to consider matters such as the jurisdiction of the Tribunal to deal with the application; or
    3. rejection by the principal registrar pursuant to section 71 of the VCAT Act.

The Tribunal confirmed the decision of the Registrar to refuse the late application.

See also:

  • Guide to Planning Appeals: Appeals > Late applications

8. Characterisation of use: Extractive industry

In Valente v Monash CC [2023] VCAT 729, a question of law was considered as to whether a use sought under a planning permit application was properly characterised as Extractive industry as defined in Clause 73.03 of the Monash Planning Scheme.

The Council had issued a Notice of Decision to Grant Planning Permit for the:

Use and development … for preloading of earth and construction of buildings and works (temporary landfill gas venting trench) and alteration of access to a Transport Zone 2

The proposed works approved by the Council was associated with the rehabilitation of the site, which was once a sand quarry.

Objectors lodged an appeal against the NOD and a preliminary hearing was held to consider the question of law.

In approaching its task, the Tribunal considered that in a ‘characterisation’ dispute such as this, caution should be applied to potentially utilising an innominate use to characterise the activity in question, instead of a suitable Victoria Planning Provision (VPP) defined land use term. It stated:

The key reason for this is that the text from Clause 73.03 (as quoted at paragraph 27 above) expressly provides this strong guidance. I say ‘strong’ in that at the third line of this clause, the term ‘must’ is used, rather than say ‘may’ or ‘should’. The choice of the word ‘must’ indicates not merely a loose preference, but rather a real desire by the author(s) of this Clause 73.03 text that stakeholders in the Victorian planning system where possible utilise defined land use terms, if the activity in question commonly or obviously falls within the meaning of such a defined land use.

Putting this another way, I read this Clause 73.03 text as indicating that where there is a credible case that the activity in question can be characterised as falling within the meaning of a defined land use term, that this should be the default position (which should not be lightly overlooked in favour of an innominate use). [43-44]

The definition of Extractive industry in Clause 73.03 includes ‘rehabilitation’. Because this term is not defined in the Planning Scheme, it is to be given its ordinary meaning. The Tribunal found the ordinary meaning to assist in the understanding of the term in the context in which it is found. It stated:

The term ‘rehabilitation’ or restoration of the land to former health is to be understood relative to the first part of the definition that is, the extraction or removal of stone from the land for commercial use or for use in building, construction, road or manufacturing works. Thus, rehabilitation in the context of the extractive industry means restoring the land to the health or condition that existed prior to the extraction and or removal of the stone. That will involve the filling of the void created by the extraction or removal of stone to restore the land to its former condition and may include returning the land to former site level. The filling could be achieved in many ways. 

In other words, there is a nexus between the extraction or removal of stone from the land and its rehabilitation or restoration to its former health or condition. [83-84]

However, the Tribunal went on further to state that that does not mean that all rehabilitation works, or restoration works are forever to be defined as land used for extractive industry. The question of what works constitute rehabilitation for the purposes of extractive industry, in this case can be ascertained from the relevant facts and circumstances.

In the circumstances of the present case, the Tribunal considered the real and substantial purpose of the works is to prepare the land for the potential future development of the land for residential uses. That is, the works are preparatory, and do not constitute a use of the land.

See also: 

  • Guide to Planning Appeals: Characterisation of use, Extractive industry