VCAT Volume 12 No 1
1. The tension between housing need and flood risk
You would have to be living under a rock to not know Victoria (indeed Australia) is in a housing crisis with a critical shortage of housing supply and that the state government is introducing unparalleled changes to the planning system to remove as many planning ‘obstacles’ as possible. But, as recent decisions 6C RAZ Pty Ltd v Frankston CC [2024] VCAT 892 and Doyle v Bass Coast SC [2024] VCAT 895 make clear, unacceptable risk to life and property from flood risk does not necessarily outweigh housing need.
In 6C Raz Pty Ltd, the proposal was for two double storey dwellings on adjoining sites. The subject land is in the General Residential Zone and affected by a Special Building Overlay. Melbourne Water is a determining referral authority and objected to the application because of concerns with flooding.
The Applicant led planning evidence that the proposals address flood hazard by:
- Providing a finished floor level of the ground floor level of the proposed dwellings at 2.74 metres AHD which will have a 300mm freeboard above the flood level of 2.44 metres AHD;
- Raising the garage levels to the nominal flood protection level; and
- Raising the internal driveways to meet safe access requirements.
Accordingly, it was contended that through raised floor and site levels, the dwellings provide an appropriate design response to minimise the risks of damage to buildings from flooding and provide sufficient safety for occupants to remain safe from flood risks including the ability to shelter in place during any flood event. Therefore, the dwellings minimise flood risks and protects life and property from flooding.
The Applicants submitted that if a permit is not granted because of flood risk, it means the sites will be sterilised from use and development, which is not a useful outcome and one contrary to strategic directions for appropriate residential growth.
However, Melbourne Water contended that the dwellings are not consistent with the approach of minimising potential flood risks to life, health and safety associated with development because the proposal will result in a medium density residential development on vacant land which is, and will continue to be, prone to flooding during the 1% AEP flood event. Further, the street on which the dwellings are to be located is the sole point of vehicular and pedestrian access, which is subject to more significant flooding. On this matter, Melbourne Water submitted future occupants of the dwellings will be isolated which is not a mitigation measure but an inherent consequence of flooding. Further, allowing medium density residential developments to proceed which forces the future occupants to stay or shelter in place for up to 10 to 12 hours until floodwaters recede to safer levels that allows access to and from the sites to be available is not appropriate and not an acceptable or orderly planning outcome.
In response, the Applicants submitted that having to remain in the dwellings for up to around 12 hours is not unacceptable given the recent experiences of Melbournians during the Covid-19 lockdowns. Given the occupants of the dwellings will be safe, such an imposition would not be considered overwhelming.
In refusing the permit, the Tribunal stated:
I am not convinced that requiring future occupants of the proposed dwellings on the sites to have to stay in place and shelter for a duration of a flood that is around 10 to 12 hours under current conditions without the prospect of any flood mitigation is acceptable. The difficulty with forcing occupants to stay home for such periods of time is the increased risk associated with the potential need to leave the sites, driven by a myriad of reasons including for work, to collect children, for medical reasons or simply due to the anxiety of loss of the freedom of movement. [138]
In Doyle, the proposal was for a three bedroom single dwelling in Silverleaves, part of the Cowes township at Phillip Island. The subject land is in the Township Zone and affected by the Land Subject to Inundation Overlay (LSIO).
In response to advised flood levels from Melbourne Water, the proposed floor levels and car space are elevated above ground level. The advised flood level is 2.77 metres AHD. The floor levels of 3.47 metres AHD and 4.04 metres AHD thus provide some 0.7 metres and 1.27 metres free board above the flood level. The 2.5 metres AHD level of the car space provides for a maximum inundation of 0.27 metres, while the driveway entry at 1.8 metres AHD could be exposed to a maximum depth of 0.97 metres of flood waters.
Melbourne Water objected to the application as a determining referral authority. However, Council supported the application, submitting that various planning policy that addresses settlement and housing supply does not seek to avoid exposure to hazards or risks but rather to manage and minimise that exposure and associated risks.
Further, Council submitted that the scale of the proposed development within the surrounding context of Silverleaves as a long-established urban area zoned to facilitate residential development must be considered. The site is likely not suitable for further subdivision or higher density residential development in accordance with the above policies. However, the development of the land for a single, three bedroom dwelling designed to respond to predicted flood levels and risk is entirely consistent with Council’s past planning approvals under the LSIO1 in Silverleaves and the existing built form of the area. There is nothing unique about the subject site that differentiates it from surrounding lots already developed for residential use.
Melbourne Water submitted that policy seeks to discourage development where development of the subject land cannot overcome its vulnerability to coastal inundation. It contended that the proposal fails to manage the impacts of the inundation resulting in unacceptable risk to the safety, health and life of people because:
- The site is currently exposed to coastal inundation which the present state of knowledge indicates will increase in the future with sea level rise and more frequent and variable storm events.
- The future risk is to be determined by accounting for an 0.8 metre sea level rise by 2100 in conjunction with tidal peaks and storm surges.
- While there may be cyclical peaks and troughs of flood levels, the Applicant’s expert evidence is indicative of how rapidly the flood levels can rise and in the absence of any formal inundation warnings for Silverleaves, may present an unacceptable hazard to future occupants because they may not have the opportunity to evacuate early and behave irrationally when faced with periods of isolation.
The Tribunal considered that whilst the present degree of development has occurred, it has done so in the absence of knowledge about the hazards which such development is now exposed to. It further considered that it must have regard to how settlement planning recognises and seeks to address the need for and, as far as practicable, contribute to climate change adaptation and mitigation while also contributing to community well-being and safety, diversity in housing choice and a range of other settlement requirements. To this end, it held:
So, while there is qualified support for some forms of coastal settlement, planning policy seeks to limit development where there are identified coastal hazards and development in low lying coastal areas. Coastal hazards include inundation from the sea level rise and storm surges. [90]
In previous cases involving flood risk reference had been made to the Australian Disaster Resilience Handbook 7 Managing the Floodplain: A Guide to Best Practice in Flood Risk Management in Australia (AIDR 2017) (the FRM Handbook). In Doyle, a legal question was whether the FRM Handbook is a relevant matter. The Tribunal held:
The FRM Handbook is a ‘relevant matter’ because its subject matter is ‘flood risk management’. Flood risk management comes within the scope of the PE Act and the planning scheme. It is a national guideline setting out national principles and practices for disaster risk reduction and emergency management, including for flood events, and any management measures and strategies. It is therefore intended for application in Victoria. [54]
The FRM Handbook details the measures that need to be implemented for the continued use of the site to ensure best possible preparedness, appropriate response and recovery measures (i.e. things that need to be done before, in the lead up to, during and after a flood) in the event of a significant flood in the vicinity. The FRMP recognises and is structured to operate independently of but with due regard for:
- Existing storm surge forecasts from the Bureau of Meteorology.
- Warning services and evacuation mechanisms provided by State Emergency Services (SES).
Whilst the Applicant’s expert witness was satisfied that the FRM Handbook provides a process for occupants to respond to a flood emergency the Tribunal was not so convinced, concerned that the level of reliance is on people who have no formal training or position of authority to direct themselves or others to have regard to, let alone comply with, the FRM. It stated:
We are also concerned about the high degree of reliance placed on occupants reacting rationally to an inundation event. Appendix 1 of the Flood Guidelines is informative setting out that:
-
- Half of flood related deaths occur from people driving through flood water;
- Flood awareness does not significantly alter people’s decision making and nor do flood warnings.
- Wading through flood waters may cause injuries because people cannot see what is beneath the water.
- Walking long distances through flood water requires sustained physical exertion and increases the potential of exposure to below water obstacles. [152]
The Tribunal’s observations on this point are interesting when contrasted with individual responsibility that is placed on households to have their own bushfire plans.
In both 6C Raz Pty Ltd and Doyle, submissions were also made that with area-based mitigation measures the flood risk to the subject properties could be significantly reduced. However, no commitments had been to the identified mitigation and the Tribunal held in both cases it would be inappropriate to give weight to future works that may or may not occur.
Your editors note that both federal and state governments have prioritised housing need in recent times, whereas the response to climate change mitigation works seems to be a lower order priority. If climate change impacts such as flooding risk begins to affect housing supply, and results in sterilised land, perhaps that may be a catalyst for mitigation works to be given more urgency.
See also:
- Guide to Planning Appeals: Flood risk
2. The level of information to establish an existing use right
The Tribunal provided a timely reminder in Clancy Blue Pty Ltd v Mount Alexander SC [2024] VCAT 909 about the importance of the nature of information to prove an existing right. The case concerned a Certificate of Compliance that the site enjoys existing use rights (EUR) for the purpose of ‘Accommodation’. The Tribunal’s comments on the matter of information to establish an EUR are re-produced below:
On the one hand, VCAT aims to be as accessible as practicable for the Victorian public and Section 98 of the Victorian Civil and Administrative Tribunal Act 1998 (amongst various points) promotes VCAT hearings focusing on the substance of the relevant dispute and avoiding undue formality.
On the other, the potential establishing of EUR is a more formal and serious aspect of the Victorian planning system, where the potential establishment of such EUR creates an exception to the normal Planning Scheme requirements. To have a workable and robust planning system that the Victorian public has confidence in, it is common sense that a thorough and convincing case needs to be made out, for either a Responsible Authority or VCAT to accept that any one site enjoys EUR.
The Tribunal is also mindful of the previous caselaw that the party claiming EUR is the one that bears the onus of providing EUR at VCAT – there is no onus on Council to disprove that EUR exist.
For these reasons, cases at in the Planning and Environment Division at VCAT involving EUR disputes typically are somewhat more formal and involve ‘higher levels of proof’ compared to ordinary planning merits hearings. The Tribunal expects not merely ‘submissions from the bar table’ but written Affidavits and/or sworn evidence from suitable witnesses called at the hearing, to verify how the applicant claims the subject land has been historically used.
In this context, it is surprising and was unhelpful for the applicant’s case that so little formal evidence has been provided by the applicant at the hearing before us. The applicant’s written submission is brief at four pages and did not include any Attachments. Although we heard from the 1980s tourist accommodation project architect Mr Carter about how the original development came about, the applicant did not produce any Affidavits or call any sworn witnesses to address how the site has actually been used day-to-day in recent decades.
Indeed, it was very fortunate for the applicant that the Council planner who appeared before us (Ms Smith) had very commendably been the one who had carried out detailed research into the historical use of the site and provided numerous Attachments to her written submission. It is also fortuitous for the applicant that at the hearing, Council was content from its own research that the subject land was continually used for over 15 years up to 2023 as a ‘youth camp’, rather than Council ‘putting the applicant to proof’ on this issue. [8-13]
Based on the information provided by the Council, rather than the Applicant who has the burden of proof responsibility, the Tribunal directed the Council to issue a Certificate of Certification for ‘youth camp’.
See also:
- Guide to Planning Appeals: Existing use right > Burden of proof
3. Establishing existing use rights under amended Clause 63.11
Practitioners may recall Amendment VC254 amended Clause 63.11 on 12 February of this year. It provides:
If, in relation to an application or proceeding under the Act or this scheme, including an application for a certificate of compliance under Section 97N of the Act, the extent of any existing use right for a period in excess of 15 years is in question, it is sufficient proof of the establishment of the existing use right if the use has been carried out continuously for a period of 15 years at any time before the date of the application or proceeding.
An existing use right may be established under this clause even if the use did not comply with the scheme immediately before or during the 15 year period, unless any of the following apply:
-
- At any time before or after commencement of the 15 year period the use has been held to be unlawful by a decision of a court or tribunal.
- During the 15 year period, the responsible authority has clearly and unambiguously given a written direction for the use to cease by reason of its non-compliance with the scheme.
- The use ceased between the end of the 15 year period and the date of the application or proceeding.
The effect of the amended words (highlighted in bold) was intended to enable an applicant to elect the dates which constitute the 15 year period, as opposed to the earlier requirement which had been interpreted as requiring the 15 years to be immediately prior to the application being made or the commencement of the proceeding.
In Wolfenden v Bass Coast SC [2024] VCAT 841, Council had refused to issue a Certificate of Compliance sought by a caravan park operator that it had existing use rights for part of the subject land as a store and workshop.
In considering the relevant trigger in an application for review to the Tribunal, as distinct from an application for declaration (being in the Tribunal’s original jurisdiction), the Tribunal adopted the reasoning in Debattista v Mornington Peninsula SC [2023] VCAT 972 (which in turn adopted the reasoning in Octopus Media v Melbourne City Council [2017] VSC 429) that the correct date is the date of the application to the primary decision maker.
In any event, the Tribunal found the difference between the date of lodgement of the application for review and the first day of the hearing to be immaterial in the case.
As is usual for establishing existing use rights, the Tribunal held that it is the balance of probabilities test that determines existing use rights. In finding in favour of the Applicant and setting aside Council’s decision to refuse a Certificate of Compliance, it stated:
In my opinion, Council has not given sufficient credence to the direct, sworn oral evidence given on behalf of Mr Wolfenden by the four different witnesses at the hearing. This was tested in cross examination by an experienced solicitor and town planner advocate for Council. It also withstood scrutiny by the Tribunal in all respects.
I find their evidence cogent that two separate but related activities occurred on the subject land within the shed, associated structures and their curtilage during the relevant time. A Store and a Workshop.
Throughout the hearing, I had turned my mind to whether one of these uses may be ancillary to the other. However, the regularity and extent of both of these uses, as well as the floor area dedicated to each confirms my finding that they are separate uses in their own right.
I do not share Council’s concerns that there is an absence of sufficient evidence demonstrating the continuous use of the subject land for the purpose of a Shed and Workshop during the relevant period, particularly between 1 July 2009 and 10 October 2022 (relative to the earlier accrual period).
Likewise, I reject Council’s submission that the subject land was only ‘informally used’ for these purposes during the relevant period, as opposed to being a distinct use of that land. [62-66]
See also:
- Guide to Planning Appeals: Certificate of Compliance, Existing use rights > Fifteen year rule and expiration of existing use rights
4. Whether conditions on a crossover valid
Disputed conditions about the removal of an existing crossover raised a number of legal issues in J Dale Fisher Architects Pty Ltd v Stonnington CC [2024] VCAT 864.
Council had approved a permit for alterations and additions to an existing dwelling and the construction of a new double garage. A new crossover was proposed to provide access to the new garage. A condition required the removal of an existing crossover with works to reinstate the kerb and channel to the satisfaction of Council. This condition also noted that separate consent for crossovers is required from Council’s Building and Local Laws Unit.
The Applicant contended that the existing crossover is not redundant and furthermore, there is no nexus between the condition requiring this crossover to be removed and the buildings and works allowed by the permit. There is no explicit requirement under the Design and Development Overlay (DDO) that applies to the area relating to crossovers.
The following five questions were identified by the Tribunal:
- Do the crossover works need a permit?
- What is the link between the conditions and the relevant planning controls?
- Is there relevant policy that assesses a crossover?
- What weight should be afforded to the Vehicle Crossing Policy?
- Would the removal of the conditions lead to futility?
On question 1, the Tribunal held that the header provision of the DDO does not seek to capture the type of buildings and works listed under Clause 62.02-2, but rather, gives the planning authority an opportunity to craft specific exemptions appropriate to the circumstances to honour the statement of significances and objectives contained within the overlay provisions and schedules. This is consistent with the Tribunal’s findings in Hobsons Bay Yacht Club Inc v Minister for Planning [2021] VCAT 954, which stated [at 72]
Having regard to what is said above in terms of what “road” means and encompasses, the Tribunal regards the construction of a crossover to be contemplated within the meaning of the term “roadworks”. This is because a crossover is part of, or an element of, a “road” and works to create a crossover are “road construction” for the purposes of the meaning of the term “roadworks”.
On questions 2 and 3 the Tribunal held that, consistent with Brunswick Investment Project Pty Ltd v Moreland CC [2021] VCAT 1191, because the crossover does not require a planning permit, the broader planning policy relating to neighbourhood character and public realm do not apply.
On question 4, the Tribunal held Council’s Vehicle Crossing Policy 2007-2011, whilst a background document in Clause 72.08 of the Scheme, does not form part of the scheme and does not underpin any zones, overlays or policies.
On question 5, given that the owner of the site is entitled to apply, but has not yet applied for the crossover permit, it did not consider that this is a matter of futility. The relevant approvals can be sought if there is an intention to act on the planning permit granted.
Council is adamant that the new crossover will not be supported under its local laws policy. Obviously there is no right of appeal against a local law decision. It will be interesting to see what outcome will ultimately occur.
See also:
- Guide to Planning Appeals: Access > Vehicular access
5. Whether YMCA facilities on a government school site are by or on behalf of Minister
With the introduction of the Planning and Environment Act 1987 (P&E Act) in early 1998, an Order was published in the Government Gazette exempting certain Ministers from planning schemes, including the Minister for Education.
In SGL v Melton CC [2024] VCAT 894, a nearby resident to a government school sought a declaration pursuant to section 149B of the P&E Act whether a planning permit is required for the use and development of the land for the YMCA facilities, namely the aquatic centre, YMCA ELC and after school centre.
The resident was concerned with a number of issues including safety, illegal parking and movement of vehicles, rubbish, large commercial signage, light pollution and noise from people congregating around the facility and entering or leaving the land.
A number of legal and financial arrangements had been put in place to facilitate the YMCA facilities at the school site.
Decisions in support of the wide extent of the exemption and which were referenced in submissions to the Tribunal include R v Portus: Ex Parte Federated Clerks Union of Australia (1949) CLR 428, Minister for Education v Whitehorse CC [2014] VCAT 1122; Futsal Central Pty Ltd v Boroondara CC [2019] VCAT 720; and Bayside Residents for Council Accountability Inc. v Bayside CC [2022] VCAT 606.
The Council noted in submissions that Wertheimer v Bayside CC [2017] VCAT 726 adopted a stricter approach to the meaning of the phrase ‘by and on behalf of’.
Having regard to the above authorities, as well as other authorities referenced by the Applicant, the Tribunal noted that, inter alia:
- the extent of the exemption in the 1988 Order is very wide noting some exceptions with respect to geographical areas that are not relevant in this proceeding; and
- the 1988 Order does not place any limitation on the characterisation, scale or type of development or use the subject of the exemption.
Further, the Tribunal considered the Education and Training Reform Act 2006 (ETR Act) is highly relevant to this proceeding because it is clear that the Minister has broad powers under the ETR Act including to enter into agreements or arrangements regarding the use and development of land that is owned by the Minister to enable ‘multi-sector education services to be provided at the same location or under the management or control of more than one person or body’. The Tribunal stated:
Moving now to the development of the YMCA Facilities, I simply note the powers of the Minister under the ETR Act without repeating them. It should be noted there is no contractual relationship between the Minister and the YMCA with respect to the development. The development of the YMCA Facilities is an arrangement between the Minister and Axiom. It is the Minister that has sought to develop the 11 schools and include the YMCA Facilities at the Kororoit Creek Primary School. The Minister has chosen to include those facilities at certain schools, in his/her absolute discretion.
In light of the above, I conclude that the development of the YMCA Facilities at the Kororoit Creek Primary School was carried out on behalf of the Minister.
To conclude, I turn to Portus and having considered at some length the ETR Act and the 1988 Order, it is not difficult to conclude that the phrase ‘carried out by or on behalf of the Minister’ means for the benefit or interest of the Minister responsible for the administration of the ETR Act. The use and development of the YMCA Facilities are for the benefit and interest of the Minister, to ensure the purposes of the ETR Act are achieved. [128-130]
The Tribunal also considered the various leases and deeds and likewise concluded “that taken together that lead me to conclude that both the use and development of the land for the YMCA Facilities are on behalf of the Minister and are thus exempt from the need for a planning permit under the 1988 Order.”
See also:
- Guide to Planning Appeals: Permit > Application for permit > Exemption from permit
6. Whether amended plans are further information or a change to the plans
In PC Infrastructure Pty Ltd v Greater Dandenong CC [2024] VCAT 900, the Applicant sought to submit amended plans in accordance with Practice Note PNPE9 – Amendment of Planning Permit Applications and Plans.
The Applicant submitted the amended plans contain additional information only, as described in the planning expert’s evidence and contain no material changes to the proposal.
In response to the Tribunal’s questions about how the differing depiction of natural ground level, finished surface levels and building heights could be said to be ‘further information’ rather than an amendment, the Applicant submitted there is no amendment because the original plans did not show natural ground level, so could not be said to be amended.
The Council submitted it understands there has been no change to the site layout or proposal, but rather, further detail has been added to the plans. On that basis, the Council does not consider further notice is required.
However, the Tribunal did not agree. It compared the original plans with the amended plans and made the following observations:
- The depiction of natural ground level (NGL) within the subject land differs on the further information elevations, compared with what can be reasonably be understood to be the depiction of NGL in the PNPE9 elevations.
- As a consequence of the changed depiction of NGL within the subject land, it is apparent that some fill is proposed to be introduced which consequently raises finished surface levels throughout and increases the height of the proposed buildings when measured from NGL.
- It considered these changes to be amendments to the proposal, rather than ‘further information’.
- These amendments are not clearly disclosed in the material circulated by the Applicant on 10 September 2024 or in the planning expert’s evidence statement.
Notwithstanding that there was no objection from the parties, the Tribunal was not satisfied that the further information plans would not result in detriment to any person or would not have any unforeseen consequences for the opinions and recommendations set out in the circulated expert evidence.
Further, it was not satisfied that the interests of any person who is not a party to the proceeding would not be affected by the changes shown on the further information plans.
Having considered the changes, such persons may now seek to become parties to the proceeding and should be provided with the opportunity to do so, if they wish.