Two latest VCAT editorials now available

VCAT continues to churn out noteworthy decisions and this month we have pleasure in publishing two VCAT editorials, VCAT Vol 11 No 15 and Vol 11 No 16 (these editorials conclude Vol 11). Highlights of VCAT Vol 11 No 15 include a refusal of a subdivision plan to protect a future rail corridor despite there being no PAO; approval of a child care centre in an industrial zone; removal of native vegetation refused by Tribunal because of concerns that proposal has not minimised loss; whether the ‘removal’ of a covenant is the same as a ‘variation’; the resolution of a question of law concerning a wind farm that the Tribunal can determine if there has been an on-going breach of an Incorporated Document condition where the Minister has previously determined satisfaction with compliance of the condition; and the finding that a landscape plan is not an engineering plan requiring approval under s 15 of the Subdivision Act, and that Council cannot charge fees for assessing landscaping plans under r 9 of the Subdivision Regulations. Highlights of VCAT Vol 11 No 16 include how to measure overlooking in Standard B22; a s 39 challenge to a Panel direction must me made at the time the direction is made by the Panel, not at the time the Panel report is made available; the relevance of Aboriginal cultural heritage where a CHMP is not required; whether works involve a deviation of a waterway under the Water Act; traffic concerns scuttle a Dan Murphy’s and convenience restaurant; whether a public open space contribution is double dipping; and approval of a large residential development in proximity to a MHF.