PPV Volume 12 No 2
1. Rising to the infrastructure challenge in Melton’s urban growth area
Most approved Precinct Structure Plans (PSP) and Development Contributions Plans (DCPs) prepared by the former Victorian Planning Authority (VPA) include a recommendation that they be reviewed every five years. Very few PSPs and DCPs have actually been reviewed, with the result that some of the more undeveloped PSP areas are being constructed on out-dated growth area planning and design principles and with significant infrastructure shortfalls.
In Melton C232melt (PSA) [2024] PPV 46, it was proposed to update the Toolern Development Contributions Plan Review and Precinct Structure Plan. Specifically, it was proposed to facilitate infrastructure delivery in the Toolern Precinct by:
- incorporating the revised Toolern Development Contributions Plan (DCP)
- incorporating the revised Toolern Precinct Structure Plan (PSP)
- revising Urban Growth Zone Schedule 3 (UGZ3), Development Contributions Plan Overlay Schedule 3 (DCPO3) and associated provisions.
The Panel was advised that when the Toolern PSP and DCP were completed, functional layout plans and designs and project cost sheets were not prepared for certain projects. This includes projects for the transport system, bridges, and community and open space infrastructure. Since then, relevant authorities identified the need for new projects and more drainage assets, the Cobblebank Activity Centre was reclassified a Metropolitan Activity Centre, Cobblebank train station open in 2019, and the Toolern PSP area has been substantially developed with an average density of 21 dwellings per hectare rather than the anticipated 15 dwellings per hectare.
Council commenced the review of the Toolern PSP and DCP in 2021. The review found the evolving circumstances over the previous 10 years has resulted in a significant departure from original expectations, including a shortfall of about $223.2 million in both the development infrastructure levy and community infrastructure levy.
There were a number of submissions in response to the exhibition of the Amendment. Many were from developers in the PSP area. Key issues identified in submissions included the increased development infrastructure levy and infrastructure costs, housing affordability, drainage infrastructure costs, overall project justification including the 19 bridges, infrastructure scale and design, Future Urban Structure content, activity centres, Aboriginal cultural heritage, employment, and amenity.
At the outset, the Panel commended the Council for investing significant resources into the review, which it considered was based on a robust methodology and had a sound strategic basis. It considered it has resulted in a revised Toolern DCP that reflects more accurate infrastructure costs based on current information and expectations.
One of the main concerns in submissions was the impact of increased levies and charges on housing affordability. The Panel stated that it understood that developers will now have to pay significantly higher DILs than those specified in the existing Toolern DCP, which is otherwise referred to as ‘bill shock’ and was not previously accounted for. However, from another perspective, the Panel went on to say that developers who have already developed a significant proportion of the Toolern PSP area have benefitted from lower than required DILs and from Council funding the shortfall. It considered that the exhibited Toolern DCP more accurately reflects what developers should be contributing to ensure that infrastructure and open space can be practically delivered.
Overall, on the matter of housing affordability, the Panel found that the proposed development infrastructure levies will increase development costs that may increase housing prices, however there is no evidence they will unreasonably impact housing affordability to the point where other broad policy objectives cannot be met.
Another key issue in submissions was whether minimum specified housing densities should be increased to offset the increased costs. It was contended that encouraging or mandating higher dwelling densities would enable developers to offset increased DIL charges.
The approved Toolern PSP proposed residential density of 15 dwellings per hectare. However, the PSP was currently delivering a dwelling density of over 21 dwellings per net developable hectare, which also exceeds the target of 20 dwellings specified in the Planning Scheme and Victorian Planning Authority (VPA) guidance. The Panel stated:
There is a direct relationship between the expected future population and the level of infrastructure required for the Toolern PSP area. This means increasing development density is not an effective means of offsetting increased DIL charges because the increased density generates increased demand for additional infrastructure that would need to be planned for and costed in the DIL for the Toolern PSP area.
The Planning Scheme and Precinct Structure Planning Guidelines clearly establish a minimum average of 20 dwellings per hectare as the target to facilitate across the Toolern PSP area. This target should apply because over 10 years have passed since the Toolern PSP was introduced into the Planning Scheme.
Currently there is no commitment on the part of the state government to commence a comprehensive review of outdated PSPs and DCPs, and limited resources for rate-capped growth area councils also make such reviews difficult to undertake. Updating PSPs and DCPs would be an effective way to ensure the achievement of appropriate densities and the funding of required infrastructure to help address the housing crisis and improve liveability.
See also:
- Guide to Planning Panels: Development Contributions Plans associated with Precinct Structure Plans
2. Getting to first base: Talbot quarry site in Oakleigh South to proceed to exhibition
The Talbot quarry and landfill was used for quarrying (sand extraction) from the early 1950s to the 1990s. The residue from sand washing was deposited in slimes lagoons across the site. Some of the quarry pits were used for municipal landfills that operated in the north west corner of the site and on Talbot Park to the south east of the site from the 1970s to the 1990s. As a result, the site is characterised by a range of unnatural and irregular landforms and topography, unstable ground conditions and contamination including landfill gas (LFG).
An earlier proposal to rezone the land was considered by a Panel in 2017 and 2018 (see Monash C129 (PSA) [2016] PPV 93). That Panel did not support the rezoning, finding that the land should be comprehensively audited and investigated for environmental and geotechnical risks before consideration of a rezoning.
Following the Panel’s findings, the Proponent requested the Minister for Planning to prepare an amendment to rezone the land for residential purposes, and to apply Development Plan Overlay Schedule 6 (DPO6) to guide the redevelopment of the land. The development would accommodate approximately 1,100 dwellings.
The request for the Amendment was accompanied with a number of environmental and geotechnical investigations and some remediation of the land has occurred. Prior to considering exhibition of the Amendment, the Minister referred the matter to the Priority Projects Standing Committee to ascertain whether there is sufficient technical information for the proposal to proceed as a draft amendment to public exhibition (Priority Projects Standing Advisory Committee Referral 41 (AC) [2024] PPV 36). More specifically, the request sought advice and recommendations as to whether:
- the draft Amendment and proposed geotechnical development strategy (GDS) and environmental management strategy (EMS) will effectively mitigate risks to human health, amenity, and the development;
- the ongoing measures required within the draft Amendment and EMS and GDS will place unreasonable burden on future residents and landowners;
- the proposed geotechnical solutions within the GDS, and the subsequent settlement predictions, represent an acceptable response to the geotechnical challenges for the development;
- the proposed environmental management measures required under the EMS represent an acceptable response to the environmental challenges for the use and development;
- the potential for conflicts between measures required under the EMS and GDS have been adequately considered and addressed; and
- if and/or how the measures required under the EMS and GDS can be adequately enforced using available planning tools.
The Committee held a one day consultation session to allow the Committee to explore the technical issues on which it has been asked to advise with the Proponent, its experts, and other relevant parties, including the Council and Environment Protection Authority (EPA).
The Committee’s conclusions were that:
- There is sufficient technical information for the draft Amendment to proceed to public exhibition.
- The Environmental Management Strategy (EMS) should effectively mitigate risks to human health and amenity provided the measures outlined in the EMS are properly designed, constructed and maintained.
- The Geotechnical Development Strategy (GDS) and EMS should effectively mitigate risks to development provided the measures outlined in those documents are properly designed, constructed and maintained.
- The ongoing environmental management measures and geotechnical solutions do not place an unreasonable burden on future landowners.
- The proposed environmental management measures are acceptable.
- The proposed geotechnical solutions are acceptable.
- There is no obvious conflict between the EMS and the GDS.
- The requirements of the EMS can be effectively enforced through the Development Plan Overlay Schedule 6 and the requirement for a section 173 agreement. This will cover both the developer’s construction obligations and the Owner’s Corporation’s ongoing monitoring (if applicable) and maintenance obligations.
- The requirements of the GDS can effectively be enforced through the Development Plan Overlay Schedule 6 and the requirements for:
- development to be generally in accordance with the approved development plan
- permit applications to be accompanied by a verified geotechnical report.
See also:
- Guide to Planning Panels: Site specific amendments
3. Wyndham’s Industrial Land Use Strategy – is it appropriate to encourage employment and industrial land in future residential PSPs?
In Wyndham C267wynd (PSA) [2024] PPV 63, it was proposed to implement parts of the Wyndham Industrial Land Use Strategy 2022 (WILUS). This included amending sections of the Municipal Planning Strategy at Clause 02.03-7, Clause 02.04 (Strategic Framework Plan), local planning policy at Clause 17.03-1L and the Schedule to Clause 74.02 (Further Strategic Work). The Amendment also proposed to include the WILUS as a background document in the Schedule to Clause 72.08.
A number of submitters with developer interests in PSPs objected to the Amendment on the basis that the PSPs are residential precincts, and have not been identified for industrial use and it is premature to nominate areas for industrial purposes.
Concerns were also raised in relation to potential land use conflicts, impacts on adjacent landholdings and neighbourhoods, noise, odour, or traffic effects.
Part of the analysis underpinning WILUS identified the potential need for some small scale industrial and commercial land associated with future residential PSPs. It was evident that existing locally based industrial and commercial land uses are relatively distant from the future urban growth areas. In some cases, such as Hoppers Crossing and Point Cook, these industrial areas are nearly fully developed and there is limited supply of local industrial land available.
Further, it was evident that large State and regional scale industrial areas generally require extensive travel to access (usually by car) and often provide services that are not related to the day to day needs of residential communities. In this context, Council contended that it is appropriate for WILUS to identify the potential opportunity for some locally based industrial and commercial land associated with future residential areas to service local needs. This includes opportunities for local employment as well as providing services to residents that are close to where they live.
In supporting the Amendment, the Panel stated:
Further investigations regarding the supply and demand for future employment land will be a matter to be addressed at the PSP planning stage. This stage of the process will also identify the scale and location of all non-residential land uses, including employment land. It is possible that these investigations may identify different needs and opportunities for different PSP areas. The Panel considers this approach in uncontroversial and is generally standard practice when preparing a PSP. The WILUS simply affirms the need to investigate the potential for employment land without mandating the provision of a specific quantum or location. No zoning changes to land are proposed as part of the Amendment.
The Panel does not agree that identifying the potential for future industrial and commercial land within residential PSPs will, at this stage, ‘quarantine’ areas that may otherwise be developed for residential purposes or undermine the provision of housing. Although other parts of government planning policy encourage maximising the provision of housing, it is unrealistic and poor planning to contemplate that all areas in a PSP are only for residential uses. Good planning practice for large new communities requires a mix of land uses including employment uses, and this mix will be finalised at the PSP stage.
It is clear from the submissions of Council and the WILUS that the scale of any potential employment land in residential PSPs is likely to be small. In this context, it is unsurprising that all small scale future employment areas are not identified on broad plans such as the West Growth Corridor Plan or Melbourne Industrial and Commercial Land Use Plan, April 2020 (MICLUP). That said, the West Growth Corridor Plan states:
Around 100 gross hectares of additional land could also be provided for a range of local industrial and commercial activities across residential PSPs. These will be identified as required through the process.
In addition, MICLUP notes that PSPs should make adequate and sufficient provision to accommodate longer-term commercial and employment needs.
Both the West Growth Corridor Plan and MICLUP clearly contemplate potential local industrial and commercial areas that support future residential PSPs. The WILUS is consistent with this approach.
Matters such as land use conflicts, impacts on adjacent landholdings and neighbourhoods, noise, odour, or traffic effects arising from employment land can be adequately addressed at the PSP stage (if required) and through the assessment of planning permit applications for the use and development of land. It is not necessary for the WILUS to address these issues in detail.
There were a number of suggestions from submitters to amend the WILUS document, and Council also identified some need for changes. However, the Panel considered that it is not necessary for it to consider the merits of the detailed changes to the WILUS; it is only necessary for the Panel to establish that the document provides sufficient strategic justification for the Amendment.
See also:
- Guide to Planning Panels: Industrial strategies and design guidelines
4. Redevelopment of Sandown Racecourse – support for development framework
The Sandown Racecourse located in Springvale is a 112 hectare site that the Melbourne Racing Club has operated for horse and motor racing since the 1960s. The Club has sought a planning scheme amendment to develop the site for residential purposes, supported by retail, commercial and community uses over a 20 to 30 year period. It is a significant housing opportunity site.
Whilst an advisory committee has in Sandown Racecourse Advisory Committee (AC) [2024] PPV 45 broadly supported the proposal, at the time of writing the Club has had a change of mind and may no longer proceed with the proposal.
The Project proposed to deliver:
- 7,500 dwellings with a residential population of 16,000 people
- 20,000 square metres of retail and commercial spaces
- over 20 hectares of public space and community facilities, including public open space.
In terms of planning mechanisms, the draft Amendment sought to include the Sandown Racecourse Comprehensive Development Plan (CDP) as an Incorporated Document in the Greater Dandenong Planning Scheme (Planning Scheme) and rezone approximately 112 hectares of land from the Special Use Zone, Urban Floodway Zone and General Residential Zone 1 to Comprehensive Development Zone Schedule 3 (CDZ3).
The Advisory Committee’s summary of key issues and findings are re-produced below:
Planning tools and considerations
-
- Development of the site will support key State housing and planning objectives and policy.
- Due to the form of redevelopment, use of a Comprehensive Development Plan and a new Comprehensive Development Zone Schedule 3 to deliver on the Vision is appropriate.
- There is no need to introduce a new local policy to support this proposal.
- The draft Amendment, subject to the Committee’s proposed modifications, is well founded and strategically justified.
Land use, urban structure and precincts
-
- The identification, characterisation and spatial extent of each Precinct in the Comprehensive Development Plan is appropriate.
- The built form objectives and yield to realise in the order of 7,500 dwellings for a population of 16,00 people is reasonable.
- The Committee does not oppose exceeding the dwelling yield, subject to satisfying the Responsible Authority and referral agencies (such as the Department of Transport and Planning) that infrastructure capacity exists to support the proposed additional yield.
- An increase in height up to 16 storeys in the Town Centre could be provided for, subject to satisfying amenity and capacity considerations.
- Development of the site should provide for a minimum of 10 per cent affordable housing, to be shared across each precinct or sub-precinct identified.
- Due to the strategic and locational importance of the Sandown Park Railway Station, it is desirable that to meet higher order policy and planning objectives, staging within the precincts commences from both from the north and south of the site to take concurrent advantage of the Station as well as the exposure opportunities of the Princes Highway. A revised staging plan is recommended by the Committee.
Transport and traffic
-
- The site and its surrounds can cater for increased traffic, subject to necessary site works and ongoing monitoring.
- Access from Princes Highway will need to be reviewed as development proceeds to detemine whether the overpass can continue to be used or whether a new at grade intersection (similar to Princes Highway/Corrigan Road) is warranted.
Drainage and flooding
-
- It is critical to prepare and implement the Mile Creek and Police Road Concept Drainage Master Plan prior to any development occurring, in order to finalise the way in which drainage and potential flooding can be dealt with, and the layout and location of active open space can be realised.
- There is no reason to delay progressing the draft Amendment pending further work on, or finalisation of, a drainage strategy.
Economic development
-
- The site will deliver up to 20,000 square metres of retail and commercial spaces, thereby providing a Neighbourhood Activity Centre that will serve the day-to-day convenience needs of the site’s population.
- The site is well located to take advantage of nearby activity centres.
- Planning for the Town Centre Precinct as well as a secondary activity node is appropriate as development occurs, with neither centre anticipated to cause detriment to nearby centres.
Community facilities
-
- Development of the site will generate the need for maternal and child health services, kindergartens, a primary school, playgrounds and various active open space needs.
- These have been well accounted for in providing these as needed, as development occurs, to cater for the new population.
Development contributions
-
- It is appropriate the Development Contributions Plan Overlay with a Development Contributions Plan be applied to the whole of the site.
- The costs of road and community infrastructure projects is reasonable, and will be subject to regular reviews.
Heritage
-
- It is appropriate Heritage Overlay HO54 be removed from the whole of the site so that redevelopment for residential and commercial uses can be introduced to create a new urban character.
- The State Heritage listed grandstand, including its curtilage, is a critical feature of the site and its repurposing for a range of uses early in the redevelopment process must be undertaken to ensure its integrity is maintained and upheld.
It will be interesting to see whether the Club seeks to pursue the Amendment or have it withdrawn, or the Minister decides to refuse it or let it lapse.
See also:
- Guide to Planning Panels: Site specific amendments
5. Rezoning in proximity to Wollert Quarry and Landfill approved
In Whittlesea C251wsea (PSA) [2025] PPV 2, it was proposed to rezone 9 hectares from the Farming Zone to the General Residential Zone to facilitate a residential development that is inside the Melbourne Urban Growth Boundary (UGB) and to create a lot to be transferred to the City of Whittlesea for the purposes of the Quarry Hills Regional Parkland.
A significant feature to the west of the subject land is the Wollert Landfill and Wollert Quarry. The eastern edge of this landfill and quarry is located approximately 1200 metres from the western edge of the proposed rezoning.
The Wollert Quarry (Work Authority 393) was first established in 1972, and it extracts, processes and treats between 1.5 and 2.5 million tonnes of basalt per year to supply materials for major commercial and infrastructure projects. The Wollert Quarry is subject to two planning permits which allow extractive industry uses and development in accordance with the approved Work Authority. Parts of the Wollert Quarry have been exhausted and have been rehabilitated through the construction of landfill cells which are lined, filled with waste, capped and revegetated.
The Wollert Landfill has operated since 2000. It is licensed under the Environment Protection Act 2017 (EP Act) to accept a range of wastes including putrescible, solid inert, shredded tyres, asbestos, and Category C contaminated soil. It incorporates a transfer station, an energy generation facility from the combustion of landfill gas and a solar energy facility. The Wollert Landfill is also subject to Planning Permit 701889 from May 1994 which allows its use and development as an engineered landfill that progressively rehabilitated quarried land and a waste transfer station in accordance with endorsed plans. The plans indicate future waste cells.
The Wollert Landfill is a key component of the waste management framework in metropolitan Melbourne, serving seven local councils, including the City of Whittlesea. It is identified as one of the ‘Hubs of State Importance’ in both the Statewide Waste and Resource Recovery Infrastructure Plan (SWRRIP) and the Metropolitan Waste and Resource Recovery Implementation Plan (MWRRIP).
The EPA’s submission to the exhibited Amendment stated:
- The landfill operator has a works approval to develop the eastern portion of the site into landfill cells, subject to obtaining an operating licence.
- It appears that the recommended buffer of 1500m for amenity impacts would no longer be met.
- The agent of change principle requires the person or entity proposing a land use or development (new or expanding, modified or varied) that may give rise to conflicting land uses, to provide evidence to the decision maker that any variation from a specified separation distance is appropriate.
- The proponent of the Amendment as the ‘agent of change’ will therefore need to prepare a risk assessment to demonstrate that a variation to the recommended buffer distance is appropriate, in that a reduced buffer would still:
- protect human health and amenity from the effects of pollution and waste associated with an operating landfill; and
- protect landfill operations from inappropriate land use and development nearby that may constrain its operations.
The operators of the Quarry objected to the Amendment. However, prior to the Hearing it amended its position after the:
- Landfill Buffer Guideline was finalised in August 2024
- Proponent prepared an Odour Risk Assessment and the addendum that found a buffer less than 1,500 metres and above 1,000 metres was appropriate.
The EPA was also satisfied with the odour risk assessment and supported the Amendment.
The Panel stated:
The Panel accepts that submissions on landfill buffers have been resolved between Council, the EPA, the Proponent and Townshend Mernda. This is a critical consideration given the importance of the Wollert Landfill to waste disposal and recovery for metropolitan Melbourne. The Panel acknowledges the extensive engagement between Council, the Proponent and the EPA to resolve and understand the landfill buffer issues, particularly for odour risks and the efforts to ensure the interests of the Wollert Landfill are protected from urban encroachment and that the future residents are also protected from amenity impacts such as odour.
The Panel accepts the buffer between the existing and future approved cells of the Wollert Landfill is appropriate for this site as presented in the Odour Risk Assessment and addendum report and that the subject land meets policy guidelines and will be protected from potential odour impacts.
With respect to the Quarry Hills Regional Parkland, the Panel found there is a strong net community benefit with the contribution of 35 hectares of land which will assist in protecting open space, habitat and landscape values for current and future generations.
See also:
- Guide to Planning Panels: Site specific amendments
6. Yarra’s activity centres standing committee – Report No 4 on Heidelberg Road
It may be recalled that the former Minister for Planning appointed a standing advisory committee to advise on referred planning matters and associated draft Yarra Planning Scheme (Planning Scheme) provisions for activity centres and other areas of urban change.
Report 1 provided an overview of the planning context, which has recently been updated to reflect the changes to the Yarra Planning Scheme resulting from the translation of the Scheme to the Planning Policy Framework (Yarra Activity Centres Standing Advisory Committee – Report 1 – Version 2 (AC) [2022] PPV 27).
Report 2 considered the Collingwood South precinct (Yarra Activity Centres Standing Advisory Committee – Report 2 (Yarra C293yara) (PSA) [2022] PPV 28) and Report 3 considered the Swan Street and Victoria Street Activity Centres (Yarra Activity Centres Standing Advisory Committee – Report 3 (Yarra C291yara) (AC) [2022] PPV 39.
In Yarra Activity Centres Standing Advisory Committee – Report 4 (Yarra C273yara) (AC) [2025] PPV 1, the Advisory Committee considered a planning scheme amendment to introduce permanent built form controls along Heidelberg Road by applying a Design and Development Overlay Schedule 18 to land in the Commercial 1 Zone and Commercial 2 Zone along the south side of Heidelberg Road, and to apply the Heritage Overlay (HO) to two properties and delete the HO from one property.
One of the more significant issues considered by the Advisory Committee was whether proposed mandatory built form provisions could be justified. The Amendment proposed a mix of mandatory and discretionary built form provisions, with mandatory provisions applying to some precincts or parts of precincts on height, street wall heights, front setbacks, upper level setbacks and minimum rear setbacks.
Council called an expert planning witness who provided support for most, but not all, of the mandatory provisions. In supporting mandatory provisions, he made the following points:
- applying mandatory built form provisions in a DDO schedule is a typical and unremarkable response in situations where a planning authority wishes to achieve a higher level of certainty and control
- planning schemes have moved away from a uniformly performance-based approach to a system that where mandatory provisions are commonplace
- the move towards greater prescription is not confined to ‘sensitive’ areas, such as heritage precincts, coastal locations or in areas of high landscape value
- the use of mandatory provisions must be properly justified
- the planning practice notes draw a distinction between the blanket application of a mandatory control at a ‘centre-wide’ level to a targeted, precinct-level mandatory provision that seeks to respond to the unique features of the land or the precinct
- in a neighbourhood activity centre context like this, there will be circumstances where a mandatory provision may be preferred over a discretionary control such as for interface provisions
- there is nothing inherently wrong from a town planning perspective with the principle of applying mandatory provisions in lower order centres
- it is relevant that Heidelberg Road is in a moderate change area and the extent of change here is limited by other factors (like the presence of small lots) and that the centre has edge conditions and built form characteristics that limit change.
The Advisory Committee rejected all proposed mandatory provisions. It considered that:
- to justify applying mandatory provisions, there needs to be a strong alignment between the strategic work underpinning the draft Amendment and the proposed provisions. This alignment is not evident between the Built Form Analysis and exhibited DDO18
- while the interface between the commercial areas and the adjoining residential areas to the south needs to be carefully managed, this can be adequately addressed through discretionary provisions in conjunction with the proposed design objectives, requirements and decision guidelines
- in the context of range of lot sizes and shapes, to lots both within the precinct and adjoining the precinct, it is inappropriate to require all development respond to a mandatory set of provisions. There may be many instances where this level of restriction is not necessary
- the design objectives, requirements and decision guidelines that interface public open space areas can adequately guide decision makers when considering whether an application to vary a preferred metric is acceptable
- in the context that the proposed precincts are dispersed and separated by large distances, with varying land uses and building typologies, and the centrally located APM site with no 3 metre wide landscaped street setback, the mandatory requirement is unlikely to provide a cohesive and unifying urban structure to the area
- the heritage character of Heidelberg Road is overstated and is not a suitable justification for mandatory provisions.
It is interesting to note that the Heidelberg Road corridor is characterised by a disparate mix of building scales, uses and street interfaces, which appears to be an underlying reason for the Advisory Committee’s concern about the appropriateness of mandatory provisions in this context.
See also:
- Guide to Planning Panels: Activity centres > Built form and height controls