1. Heidelberg Major Activity Centre Structure Plan – more heavy lifting will be required

The State Government’s new Activity Centres Program identifies 10 activity centres to deliver 60,000 new homes close to services, jobs, and public transport. Heidelberg Activity Centre is not on that list, but is identified as a Major Activity Centre in Plan Melbourne.

In Banyule C172bany (PSA) [2024] PPV 37, the Panel considered the Heidelberg Structure Plan, which has been prepared over four years of study and analysis and engagement with the community and updates the 2010 Plan.

The Heidelberg Structure Plan acknowledges the Activity Centre plays an extremely important role in Banyule and has a number of attributes that contribute to its suitability for accommodating significant growth. This includes its:

  • status as a major activity centre
  • status as part of the La Trobe National Employment and Innovation Cluster
  • public transport accessibility, particularly the Heidelberg Train Station, which will inevitably be improved by rail capacity increases resulting from duplication works on the Hurstbridge line, and significantly increased by the Suburban Rail Loop North.

The Amendment applies the Activity Centre Zone Schedule 2 (ACZ2) and the General Residential Zone Schedule 5 (GRZ5) and modifying the existing Residential Growth Zone Schedule 1 (RGZ1). The Structure Plan is underpinned by economic and housing analysis to cater for future demand, as well as built form analysis with objectives that:

  • new buildings within the Activity Centre will feature greater levels of building separation, particularly at the upper levels of new buildings
  • ensure new development does not dominate the streetscape and enable the penetration of sunlight to the street
  • facilitate new buildings that are locally appropriate and contribute positively to the public realm.

Whilst the Panel found the Amendment to be strategically justified, it questioned whether the Amendment has gone far enough in terms of optimising the capacity of the Activity Centre to accommodate growth in accordance with State and local activity centre policy. In particular, it expressed concern whether the application of the General Residential Zone with a mandatory height limit of three storeys to such a large extent of the Activity Centre was appropriate and whether the preferred maximum heights and some of the other proposed built form controls (including mandatory provisions) proposed under the Activity Centre Zone Schedule 2 were unduly restrictive in the context of an area earmarked for significant change and growth.

With respect to the use of the ACZ, the Panel held reservations about the approach to the application of the ACZ and its application to some but not all land within the Activity Centre boundary, including the use of both the Activity Centre Zone and residential zones. However, the Panel ultimately supported the approach in this instance, particularly given the size of the Activity Centre and the difficulties that might come with including the residential zone requirements in the Activity Centre Zone schedule.

With respect to the built form provisions, the Panel considered the modest increase in building heights proposed throughout the six precincts of the Activity Centre Zone Schedule 2 is not commensurate with the planning policy context for substantial growth and change within the Activity Centre.

It noted in particular sub-precinct 3B should have a preferred discretionary height of 28 metres (eight storeys) and sub- precinct 6B (that part which is adjacent to sub-precinct 3B) should have a preferred discretionary height of 20 metres (six storeys).

The Panel supported a street wall height of 10 metres on the basis that it is discretionary rather than mandatory. A discretionary 10-metre street wall for Precincts 1, 2, 3, 4 and 5 will still:

  • avoid overshadowing of footpaths
  • achieve a ‘human scale’
  • create an appropriate built form having regard to existing and historic built form.

In terms of building separation, the Panel noted that the principle of a 4.5-metre setback from a boundary for each site, to ensure a minimum nine-metre separation between upper levels, is widely accepted as a fair and appropriate measure for building separation. However, it considered the metric should be discretionary rather than mandatory in line with the Panel’s overarching conclusions concerning mandatory provisions and to accommodate site specific circumstances.

In relation to the proposed use of mandatory built form requirements, including in relation to overshadowing, the Panel considered the strategic work undertaken by Council is not robust or appropriately comprehensive to justify the mandatory provisions. Council provided only a general assessment against the relevant criteria (Planning Practice Note 59) in its Part B submission and did not justify each proposed mandatory control in the background amendment material. Council was not able to demonstrate:

  • any exceptional circumstances to justify the mandatory provisions
  • that a discretionary control would lead to unacceptable outcomes.

The Panel stated:

In many cases the Panel considers the mandatory provisions will unnecessarily stifle development, contrary to State planning policies for major activity centres. The only mandatory provision which the Panel considers should remain is a mandatory height control for Precinct 3E. This control was to ensure the retention and protection of the identified key view ‘Hawdon Street and Darebin Street’ as identified in the Heidelberg Structure Plan Views Assessment: Final Report, Ethos Urban, May 2021.

Overall, the Panel supported the Amendment subject to changes identified in its report.

No doubt in recognition of the State Government’s activity centres program, the Panel provided a word of caution that Council and the community need to recognise that the current strategic work will not be the last say on housing intensification in Heidelberg. The work will need to be reviewed in the future and in all likelihood that review will identify further areas for intensification, and potentially taller development in existing areas identified for intensification, as Melbourne continues to grow and change.

Whether this further work is to be led by the State Government or the Council is yet to be decided.

See also:

  • Guide to Planning Panels: Activity centres > Role of activity centres

2. Frankston Metropolitan Activity Centre Structure Plan – on the right note, maybe

Whilst Frankston is one of the 10 activity centres included in the State Government’s Activity Centres program, with a draft Activity Centre Plan prepared by the Victoria Planning Authority, the Panel in Frankston C160fran (PSA) [2024] PPV 33, was satisfied that that the Activity Centre Zone provisions will support the level of projected housing and commercial growth of the Frankston Metropolitan Activity Centre to 2041, particularly through the introduction of discretionary provisions and the  five year review period identified in the Structure Plan. The Panel considered it aligns with the Victorian Housing Statement by supporting housing diversity, and mixed-use development within a well-connected, liveable urban environment that will cater to a growing population.

The Panel noted that the Structure Plan was informed by urban design, economic and land use capacity, transport and movement analysis as well as feedback from community engagement. The Structure Plan is the first significant planning review of the centre since the TAFE to Bay Structure Plan of 2005 and the Frankston Metropolitan Activity Centre Structure Plan of 2015, neither of which have been fully implemented into the Frankston Planning Scheme.

The main component of the Amendment is the application of the Activity Centre Zone (to replace existing zones and Design and Development Overlays) with an associated Schedule (ACZ1) which identifies objectives, land use provisions, design and development (built form) requirements and guidelines for the entire Frankston MAC and the six precincts within it. The more significant built form requirements (as exhibited) relate to building and street wall height (discretionary), building setbacks (predominantly discretionary) and solar access (discretionary).

With respect to building height, whilst future development will be highly visible from a range of vantage points, the Panel considered this is not unreasonable and to be expected given the Centre’s function and role. The Panel was satisfied the proposed discretionary building and street wall heights are appropriate and result from a considered analysis that balances the level of transformational change necessary for the Frankston MAC and the need to respond to the coastal setting and the creation of an attractive, activated and functional Centre.

With respect to setbacks, the Panel concluded that the discretionary nature and metrics of the proposed setback controls (street setbacks, upper-level setbacks, side and rear setbacks and building separation requirements) were justified and supported.

The Panel supported the mandatory street wall setbacks and metrics that have been applied in two of the precincts. It considered that they have been applied in a limited way and in parallel with discretionary upper-level setbacks, to achieve important built form transition and public realm outcomes that are clearly articulated in the Structure Plan and consistent with the criteria identified in Planning Practice Note 59 and Planning Practice Note 60.

Council proposed to amend the solar access provisions in response to the urban design evidence for Council so they become mandatory requirements. However, the Panel considered this change is not supported by the Structure Plan or informing urban design reports and should not be made.

The Panel supported the application of provisions that seek to protect sunlight access:

  • at the 22 September equinox between 10am and 2pm to key pedestrian and outdoor dining spaces
  • at the 22 June winter solstice between 10am and 1pm to public parks (excluding Kananook Creek).

The Panel was not satisfied that the basis of applying winter solstice controls to the Kananook Creek has been justified for environmental, public realm or recreational reasons and an equinox control should apply instead.

The VPA’s draft Frankston Activity Centre Plan states that the Council’s Structure Plan identifies areas for growth in the activity centre and “is generally aligned with State policy intention but remains subject to further review.”  It would appear the main focus of the VPA’s draft Frankston Activity Centre is to increase the Activity Centre’s catchment area, which is generally up to 800 metres of the edge of the non-residential areas of the Activity Centre.

In response to a request from the Panel, the Department of Transport and Planning declined to appear before the Panel or respond to specific questions. However, it made a brief statement that the Structure Plan:

…. currently broadly aligns with the commitment described in the Housing Statement, specifically the implementation of new planning controls to deliver additional homes in Frankston. It is considered that there is unlikely to be any significant implications for Amendment C160fran at this stage.

The Panel did not mention whether DTP made any comments on whether catchment issues should be addressed in the Structure Plan.

See also: 

  • Guide to Planning Panels: Activity centres > Role of activity centres

3. Stage 2 of Jetty Road Urban Growth Area – strategically sound but with many issues to resolve

The Jetty Road Urban Growth Area is part of the Drysdale Clifton Springs growth area. It is not subject to a Precinct Structure Plan like other growth areas in Greater Geelong. The Growth Area plan is to be implemented via  rezoning of the land to the General Residential Zone and the application of the Development Plan Overlay and Development Contributions Overlay.

Whilst the Panel in Greater Geelong C387ggee (PSA) [2024] PPV 27 concluded the Amendment to be strategically justified, there were a number of complex issues that were subject to detailed consideration following submissions and the calling of a number of experts. The Panel hearing was over 10 days.

The Panel report is also noteworthy for the number of issues raised post-hearing which required the Panel to clarify a number of issues in an addended report.

Some of the key issues requiring detailed consideration included the drafting of the DPO and DCP. In relation to the DPO, the following key issues were addressed:

Affordable housing

The Panel considered the provision of affordable housing is a significant net community benefit and how the allocation of it is realised is a matter for the land owners/developers. It held that the affordable housing provision is better incorporated as a percentage of all housing as the ‘Primary Obligation’, with flexibility in the way the obligation is delivered. It recommended that the quantum of the affordable housing contribution and the market discount specified in the Primary Obligation should be amended to a rate of five per cent of the total number of serviced lots at a 20 per cent market discount.

Environmentally sustainable design

The Panel noted that the delivery of environmentally sustainable design is important and should form part of the design and delivery of urban and suburban areas, however the exhibited provisions provided overly prescriptive guidance and should be replaced with a set of clear principles and goals to be addressed.

Residential and retirement village requirements

Part of the subject land is proposed to be developed as a residential and retirement village. The DPO included a provision preventing this use being located within 100 metres of the boundary of a proposed district park. However, the Panel considered this restriction to be inappropriate and should be deleted and further refinement to the DPO is warranted to ensure any proposed retirement or residential village is able to function appropriate to its needs.

Small Lot Housing Code

Whilst the use of the Small Lot Housing Code will benefit the development of the subject land, the Panel held it should be introduced through a special purpose zone which is beyond the scope of the Amendment.

Western interface

The Panel concluded that the shared user footpath should be located on the eastern side of the McDermott Road reserve and not within the subject land. This location will still ensure that that a rural / urban interface is achieved, while also increasing the amount of valuable urban land available for future development consistent with state and local policy direction.

In relation to the DCP, the following key issues were addressed:

Inclusion of the Stage 2 Drain in the Stage 2 DCP

Stage 2 of the Coriyule Road drain has been constructed and paid for by Council. Council is seeking to use the Stage 2 DCP as a mechanism to recover the costs of the infrastructure that has already been provided, and already funded. This was a complex issue considered by the Panel in detail and required the consideration of whether:

  • a development contributions plan can charge for existing infrastructure
  • the Stage 2 Drain should be removed from the Stage 2 DCP.

Following careful analysis, the Panel concluded there is no basis to suggest that Part 3B of the Planning and Environment Act 1987 permits a development contributions plan to be used to repay a Council for works already funded, and already constructed.

Timing and delivery of the Children’s and Community Hub

The Panel noted that there is a demand and need for the Children’s and Community Hub. However, the indicative project timing for the construction of the Children’s and Community Hub as provided for in the Stage 2 DCP is appropriate given the timing for the infrastructure is influenced by various considerations and not need alone.

Designated water encumbrance

The Panel considered the Stage 2 DCP should be updated to reflect the revised calculations of the unencumbered land required for the Southern Wetland.

Valuation methodology for land require for the Southern Wetland

The Stage 2 DCP land valuation for the area of land to be acquired for DR-04-L should be updated to $2.4 million per hectare once the land area is known.

Construction costs

The Stage 2 DCP should be amended to include the updated cost of $15,621,027.39 for the Southern Wetland. The Panel concluded that the updated estimate of costs is acceptable, well considered, and consistent with what would be reasonably expected for a project of this scale.

See also:

  • Guide to Planning Panels: Structure Plans > applying to townships, urban growth areas and established residential areas

4. Darebin’s simplification of public open space contributions – the first stage approach

A number of metropolitan councils have introduced new public open space contributions under Clause 53.01 of the Victoria Planning Provisions (Public Open Space and Subdivision) in recent years, often applying a sliding scale with the number of subdivided lots to determine the percentage of the contribution to be paid. The public open space studies underpinning the contributions are typically very complex, having to determine population and dwelling projections, nexus between where growth is to occur and likely increased demand for open space, the location and opportunities to enhance open space, and the proportion that new residents and workers should contribute to the additional open space needs.

In Darebin C210dare (PSA) [2024] PPV 39, it was proposed to amend the Schedule to Clause 53.01 to delete the mandatory sliding scale for contributions where two, three, and four additional lots are created and to revert to the provisions of section 18 of the Subdivision Act 1988 where a standard five per cent contributios applies to new subdivisions.

The Amendment is the first part of a two step process which Council stated would likely seek to implement a higher POS contribution rate for Darebin.

In response to a submission questioning the fairness of the Amendment, the Panel agreed with Council that there is no remaining logic to necessarily imposing a lower rate of POS contribution on smaller subdivisions. Further, the Panel agreed that in an environment where there are clear policy drivers to increased densification of residential development and consequently increased demand for public open space, all or most extra lots created should contribute equally to the provision of open space.

The Panel noted there are existing inequities and unfairness in the current system where major development may not involve subdivision and therefore there is no trigger for the collection of POS contributions. However, it is beyond the scope of this Amendment to comment further on this.

One matter that concerned the Panel was the potential confusion in requiring POS contributions for up to five lots pursuant to section 18 of the Subdivision Act and for more than five lots under Clause 53.01. Council submitted:

  • it wished to retain discretion to charge less than the Subdivision Act maximum of five percent for smaller subdivisions if the particular case warranted a lesser contribution
  • that the current Clause 53.01 provisions already allow for reverting to the Subdivision Act in two circumstances where the Schedule does not specify a contribution rate
  • the potential for confusion between the two mechanisms for charging contribution should be mitigated by subdivision requiring the certification by a licensed surveyor. A professional surveyor will be familiar with the legislative base that applies.

In response, the Panel stated:

The Panel notes that Planning Schemes are being revised to a format where state, regional and local policy are being located together to make Planning Schemes more user friendly. That said, the Panel is aware that the current situation of numerous sources of funding of public open space and in this context it considers that the current Amendment does not add significantly to complexity. Further, the Panel accepts Council’s wish to retain some discretion for smaller subdivisions so that it can charge a lesser rate if it considers that the subdivision will not give rise to proportional extra demand for POS. The Panel notes that there is no clear guidance for the exercise of discretion and that this is undesirable from the perspective of transparent processes.

One of the mooted reforms of the planning system announced as part of the State Government Housing Statement is to simplify the systems for development contributions and POS contributions. Many previous Panel reports have identified significant issues with the POS contributions framework.

See also:

  • Guide to Planning Panels: Public open space contributions > Stand-alone amendments

5. Melbourne and Cardinia’s ESD policies and controls

In the absence of any State Government progress on implementing effective ESD policies and controls, Panels have given favourable consideration to initiatives proposed by Melbourne and Cardinia councils.

In Melbourne C376melb (PSA) [2024] PPV 42, it was proposed to introduce ESD measures into the Melbourne Planning Scheme, including new mandatory and discretionary sustainable building design standards and requirements. The key changes proposed include:

  • the introduction of a new Schedule 73 (Sustainable Building Design) to the Design and Development Overlay (DDO73) to include provisions directed to:

– ESD
– energy efficiency and renewables
– waste and resource recovery
– the urban heat island responsez
– urban ecology
– integrated water management

  • amending Schedules 1, 2, 3, 4, 5 and 7 to the Capital City Zone (CCZ) and Schedules 1, 2, 3, 4, 5 and 6 to the Docklands Zone to include provisions directed to:

– bicycle, motorcycle and car share parking
– electric vehicle infrastructure
– the design of car parking facilities
– the retention of car parking spaces as common property, and future adaptation to other land uses.

The Panel supported the Amendment though expressed some concerns with the approach of some of the provisions, particularly the combination of some mandatory and discretionary provisions.

Below is a summary of the Panel’s key findings:

Strategic justification

The Panel found “the Amendment is a direct and necessary response to the declared climate and biodiversity emergency and Council’s commitment to net zero carbon emissions by 2040.” It considered the Amendment seeks to guide a range of matters relating to the design of new buildings to ensure they are energy efficient, provide green cover and respond to climate change impacts. It considered the background reports underpinning the Amendment have been based on contemporary analysis, research and findings which provide a sound strategic justification for the Amendment.

Economic impacts

The Panel noted economic impact, in terms of development feasibility and costs compared to benefits was a key concern for many submitters. However, it was satisfied that the analysis presented demonstrates:

  • compliance with the Amendment may not necessitate a reduction in development yield
  • the impact on the cost of construction is modest and acceptable
  • the feasibility of development is not expected to be materially impacted.

It considered the Amendment will have many direct benefits to occupiers of properties including operational cost savings through lower energy and water consumption. Benefits to the broader community include reduced emissions associated with embodied carbon, higher levels of renewable energy generation, production of materials and surfaces that reduce the urban heat island effect, reduced exposure to environmental risk and enhanced urban ecology.

Statutory Approach

The Panel accepted the introduction of the ESD planning requirements in a DDO covering nearly the entire municipality is novel. ESD performance measures have largely (but not exclusively) been introduced to planning schemes through policies. However, it stated “in the absence of a State-wide approach to ESD requirements in Victorian planning schemes it is appropriate for Council to contemplate the innovative application of existing provisions to implement ESD requirements.”

It further stated that “ESD is not currently confined to local policy and it is now accepted contemporary practice to also consider specific ESD requirements in other places in the Planning Scheme. In this instance, it is appropriate to apply a DDO to implement ESD requirements, an approach which is generally consistent with emerging trends in statutory planning.”

The Panel noted that the requirements of DDO73 rely upon use of third-party web-based assessment tools external to the Planning Scheme, including existing tools such as Green Star, Built Environment Sustainability Scorecard, National Australian Built Environmental Rating System and Nationwide House Energy Rating Scheme, and the new Green Factor Tool. The Green Factor Tool is proposed as part of the Amendment and is described as a green infrastructure assessment tool developed to help with designing and constructing new buildings and significant alterations and additions to ensure they are environmentally sustainable and include green infrastructure.

The Panel considered that web-based sustainability assessment tools are widely used in the Planning Scheme and are a practical and efficient way to apply complex ESD performance measures. Based on the widespread use of these tools in the Planning Scheme, the Panel accepted it is appropriate to apply these tools in the Amendment. Changes to web-based tools over time are inevitable, but these changes should be properly and deliberately applied in the Planning Scheme rather than ‘passively’ updated. Until any broader review of the management of web-based assessment tools consider otherwise, it is appropriate to modify the definition of ‘Green Factor Tool’ in DDO73 to ensure that amendments to the Green Factor Tool should not modify the current scoring regime without a further planning scheme amendment.

The DDO73 proposes a mix of mandatory, quasi-mandatory and discretionary controls. The Panel considered that “these are confusing and overly complex, and there is little utility in having mandatory controls with some form of opportunity to vary the requirement.” The Panel considered the Amendment should include only discretionary controls because:

  • the cumulative effect of the requirements could potentially result in unintended consequences
  • the DDO should provide flexibility to balance competing requirements to achieve a net result that is satisfactory
  • web-based ESD assessment tools change over time and the management of updating these tools is problematic
  • changes to the National Construction Code (NCC) over time may result in unforeseen conflict with DDO73 and a discretionary control provides for greater flexibility
  • it is appropriate to proceed cautiously to ensure the ESD controls do not mandate unreasonable costs on development.

Green factor tool

The Green Factor Tool provides projects with a Green Factor Score, with a score of 0.55 selected as the minimum standard to be met. The Green Factor Score takes into account the relative volume of green elements (which are rated on their relative efficacy in delivering ecosystem services) in comparison to the overall area of the site.

The Panel appreciated that the tool is new, sits outside the Planning Scheme and provides little guidance in terms of its parameters, weightings and workings. However, the Panel considered the Green Factor Tool is an appropriate tool to include in the Amendment.

Sustainable transport requirements

The schedules to the Capital City Zone and Docklands Zone require the retention of car parking spaces in common ownership and that car parking facilities be designed to transition to alternative uses over time.

The Panel appreciated the challenges involved in retaining car parking spaces in common ownership, including on the basis that this would remove an avenue for developers to offset the costs of development by selling off car spaces, and also because of difficulties associated with adaptation of car parking spaces to other uses over time. However, it stated “in the long term it is necessary to plan for the reduced dependency on private car travel, including parking.” It concluded that the proposed sustainable transportation provisions which require common ownership of car parking spaces are appropriate, however these provisions should be discretionary. Equally, anticipating the adaptive re-use of car parking spaces is appropriate.

The Panel agreed with submissions that specifying parking rates in a zone schedule is an unusual approach. However, it noted that the Practitioner’s Guide to Victoria’s Planning Schemes (March 2024) provides broad scope to entertain this sort of outcome. While the approach is somewhat unusual, it noted it has been adopted in the Fishermans Bend Urban Renewal Area (Amendment GC81) and for the Arden Structure Plan area (Amendment C407melb).

The Panel supported the proposed changes to the zone schedule which require the delivery of electric vehicle infrastructure. The requirements simply expand on the NCC to require the provision of electric ready bays and charging points, as opposed to just the distribution infrastructure.

The Panel was satisfied the updated parking rates recommended by Council post-exhibition are appropriate. The updated work carried out by Council in relation to bicycle rates in particular, address the concerns of submitters in relation to the potential for an oversupply of bicycle parking.

In Cardinia C278card (PSA) [2024] PPV 35, it was proposed to introduce an ESD Policy into Clause 22 of the Cardinia Planning Scheme and make related changes to Clause 21 (at the time of the Panel report the Cardinia had yet to be translated into the Planning Policy Framework).

The Amendment applies to all land in the Shire of Cardinia, where a planning permit is required for the development in accordance with the thresholds in the proposed local policy.

The Panel noted that the Amendment follows the path of and is consistent with ESD policy adopted by many Councils, including some neighbouring Councils. Further, the Amendment is guided by the work of Council Alliance for a Sustainable Built Environment (CASBE) of which Council is a member.

Five submissions were received in response to the exhibition of the Amendment, with two opposing submissions. One of these submissions raised issues that have been raised in other Amendments proposing ESD policies, such as overlap with Building Standards, costs on development and housing affordability.

Overall, the Panel concluded:

  • the mandatory nature of the proposed controls emanating from the policy is appropriate
  • there is likely to be extra costs to development resulting from the Amendment, but no conclusion can be drawn about the magnitude of them
  • there is the potential for overlap between national building codes and local ESD policy but each is focussed on different objectives. No overlap fatal to the Amendment has been identified
  • there is no evidence of significantly increased and excessive delays in the approval process resulting from the approval of the Amendment
  • challenges faced by developers in the regulatory environment are acknowledged but this is not a reason to oppose the Amendment
  • stormwater management challenges do not constitute sufficient reason to oppose the Amendment
  • there is no evidence of any overlapping charges or requirements with respect to stormwater or open space
  • there is no conflict between the levies and contribution schemes which require developers to contribute to various types of off-site infrastructure and to the achievement of more environmentally sustainable development.

CASBE continues to advocate for improvements to ESD outcomes. In July 2022, 24 Victorian councils submitted a planning scheme amendment, known as the Elevating ESD Targets Planning Amendment, to the Department of Transport and Planning. This Amendment seeks to establish elevated sustainability standards for buildings across the state, however has yet to be authorised.

It will be interesting to see whether the Minister prioritises the approval of these two amendments whilst the State Government is in its housing-at-all-costs mode.

See also:

  • Guide to Planning Panels: Environmental policies – ESD policies

6. Residential development in Malmsbury – a ticking off of third parties

In Macedon Ranges C154macr (PSA) [2024] PPV 34, the Panel considered a combined planning scheme amendment and planning permit application to facilitate the subdivision of the subject land into nine residential lots of around 2,000 square metres.

There were six submissions to the Amendment. Issues raised included strategic justification, the removal of the Heritage Overlay, impacts on cultural and rural landscapes, and community cohesion and quality of life, impacts on neighbourhood character, including concerns with the proposed development standards that would apply under the Neighbourhood Residential Zone Schedule 13 (NRZ13), stormwater management, traffic and traffic safety and challenges in servicing the land.

The Panel found the Amendment to be strategically justified and will facilitate a supply of residential land within Malmsbury that is well located close to services and transport links, and able to be connected to reticulated services. By providing for larger scale residential lots at the township’s eastern periphery, it is a logical extension of existing development.

The Panel criticised the nature of the third party submissions in fairly strong terms. It stated:

Third party review and independent scrutiny of strategic planning decisions play a crucial role in our planning system, and generally benefit the system greatly. This was not so in relation to Macedon Ranges Planning Scheme Amendment C154macr (the Amendment).

…..

The submissions objecting to the Amendment and permit on strategic grounds were entirely without merit. The strategic role of the site was determined 24 years ago, when it was included within the township boundary. It was determined at that point that the land’s future use would be for urban purposes. Farming Zoned land is not necessarily agricultural land, and the land is patently unsuitable for agriculture. Submissions raising concerns over the loss of agricultural land misunderstood the intent of policy that seeks to protect agricultural land.

The Amendment and permit application do not need to be justified on the basis of an inadequate or constrained supply of residential land. The policy framework requires planning authorities to ensure a supply of residential land in their municipalities of at least 15 years. The 15-year supply target is not intended to operate as a cap or ceiling. Nothing in the policy framework discourages a planning authority from seeking to ensure a supply of more than 15 years, or to ensure an adequate supply on a township basis rather than a municipal wide basis.

The proposed development poses no threat to the valued landscapes and special characteristics of the Macedon Ranges, or Malmsbury’s role in the settlement hierarchy as a small town. Nor does it pose any threat to the heritage values of the Malmsbury Precinct or the character of Malmsbury as a small rural town. That said, removing the site from the Heritage Overlay as part of this Amendment does not represent orderly planning. While the net may have been cast too wide when HO148 was introduced into the Planning Scheme, a more comprehensive assessment of the whole Precinct is required before sites are removed.

Submissions that raised concerns about drainage, traffic and servicing were largely about existing conditions that have nothing to do with the proposed development. To the extent that submissions asserted the proposed development would create problems or make existing problems worse, they provided no information or evidentiary basis to substantiate their concerns.