PPV Volume 11 No 7

1. Partial implementation of Bayside’s mid century heritage

Protecting City of Bayside’s mid century buildings has been a vexed issue in the municipality, as noted by the Panel in Bayside C192bays (PSA) [2024] PPV 16:

Mid-Century Modern architecture is well loved by some members of the Bayside community. There is even an association, Beaumaris Modern with a mission to:

    • To celebrate, educate and promote public awareness of the importance of preserving the mid-century architecture of Beaumaris

This enthusiasm is not universally shared. Some members of the community are opposed to heritage protection almost in principle, and some to the listing of specific houses.

The mixed views within the community reflects the Council’s approach to the Heritage Study and planning scheme amendment: councillors resolved to only partially implement the Study and resolved to exclude the Heritage Overlay (HO) to 28 properties, contrary to their officer’s recommendations. The Panel observed:

Only the councillors have insight into why certain properties were excluded.

The Minister’s Authorisation letter stated:

The Department of Environment, Land, Water and Planning (DELWP) acknowledges the significant strategic work undertaken in the preparation of the Post War Modern Residential Heritage Study 2022 and your Council is encouraged to consider undertaking a further planning scheme Amendment in the future to fully implement the study to provide certainty to land owners and ensure the comprehensive protection of heritage places consistent with the objectives of the Planning and Environment Act 1987.

Some submitters considered all the recommended properties should be included in the HO. However, the Panel considered that, whether or not excluded properties also warrant inclusion in the HO, was beyond the scope of the Panel, apart from a broad question as to whether partial implementation of the heritage study was so unfair that the Amendment should not proceed at all. The Panel did not take this view, stating that:

Staged implementation of strategic work should always be an option for planning authorities and the scattered nature of the properties means that staged implementation does not lead to the type of arbitrary outcomes that might arise from, say, only applying a heritage precinct to half the identified properties.

As to whether mid century buildings should have heritage protection at all, the Panel stated:

The Panel observes that the protection of post-war modernism is an emerging era in heritage protection. This period is now seen as old enough to warrant heritage consideration and the Panel notes that other municipalities have turned their mind to the protection of places from this era. This does not mean that heritage places from that era do not need to be protected in Bayside.

Previously most heritage protections almost exclusively considered the Victorian and Edwardian era, though since the early 2000s there has been a deeper inquiry into identifying and valuing the Modernist era. Consequently, as the study of the era evolves, so too the studies of the places which exhibit significance. On this basis, the Panel gives little weight to the assertions that properties should be included or excluded as the result of appearing or not appearing in a particular publication.

The Panel is satisfied that the process to applying the Heritage Overlay that Council has followed is in accordance with the PE Act, Planning Practice Note 1: Applying the Heritage Overlay alongside the principles of the ICOMOS (International Council on Monuments and Sites) Burra Charter ‘Understanding and assessing cultural significance’ Practice Note.

The Panel’s report addresses a number of important issues relevant to heritage amendments, including:

  • comparative analysis
  • intactness and integrity
  • building condition and maintaining modernist buildings.

Comparative analysis

Council’s two heritage experts contended that details of ‘typical’ places are not commonly included in a comparative analysis. Rather, the comparative analysis should compare the subject property against other, ‘better than typical’ places.

Council submitted that identifying even one or two of the ‘typical’ examples from the larger group of ‘typical’ examples considered for each place is not something that is required by Planning Practice Note 1 nor common practice and is particularly onerous in a municipal wide study. Planning Practice Note 1 advises:

To apply a threshold, some comparative analysis will be required to substantiate the significance of each place. The comparative analysis should draw on other similar places within the study area, including those previously included in a heritage register or overlay. Places identified to be of potential state significance should undergo analysis on a broader (statewide) comparative basis. [Panel emphasis added]

The Panel stated:

The Panel is satisfied that the Council’s heritage consultant has prepared the Heritage Study in accordance with Planning Practice Note 1 alongside the principles of the ICOMOS Burra Charter ‘Understanding and assessing cultural significance’ Practice Notes.

It would make no sense to formally include hundreds or thousands of examples of properties that are merely ‘typical’ by way of comparative analysis. Planning is about real places and generally speaking, typical places can be readily observed on the ground – things don’t need to be documented in a planning report as a precondition to relevance.

Intactness and integrity

The Panel considered that intactness is fundamental to assessing whether a property meets the threshold for significance, and whether a building is significant to the values of a precinct. It stated:

The process for determining whether something is intact or not intact, or applying qualifiers as to the degree of intactness, is not an exact one. Intactness impacts how a particular place might be read and understood.

The Panel agrees with the Hoddle Grid Heritage Review Panel that the key questions are:

    • is there still sufficient fabric in place to assist our understanding and appreciation of the particular place including its original use, era and design?
    • do the extant changes and alterations impact on our understanding and appreciation of the particular place?
    • are we still able to appreciate its significance and why it is significant?

It concluded that all places identified as warranting the HO are of sufficient integrity such that identified heritage values are capable of being properly understood and appreciated, except where specifically noted by the Panel.

Building condition and maintaining modernist buildings

The Panel agreed with previous panels that the condition of a building should not be a criterion for assessing heritage significance, unless there is evidence demonstrating demolition of a building is inevitable. It stated that condition is highly relevant at the planning permit stage, when a development proposal can be assessed against the relevant planning policies including heritage.

The Panel was concerned that a number of issues might play out differently at a planning permit stage for modernist buildings compared to building from other eras:

  • building condition
  • the feasibility of ‘like-for-like’ replacement of elements
  • the durability and maintenance of design features and detailing
  • compliance with contemporary building codes.

The Panel was persuaded by the evidence of Council’s heritage expert that:

…. like any period of construction or architectural style, postwar Modernist houses display a common set of attributes or characteristics that create particular management issues. However, this is no different to any other period of listed building which will have common issues associated with its design and construction, such as the need for restumping due to timber piles set in earth, rising damp due to the absence of a damp proof course, brick/cracking repair due to low-fired nineteenth century bricks, or the need to periodically repoint soft lime-based mortars. These mechanisms of failure common to nineteenth and early twentieth century buildings have been and continue to be appropriately remediated on thousands of buildings currently on the Heritage Overlay

The Panel therefore accepted that postwar Modernist buildings do not pose any unique or particular repair, management or conservation issues that cannot or should not be dealt with through the usual planning permit process as it applies to listed buildings of the preceding two centuries.

Overall, the Amendment proposed to apply the HO to 59 individual places and one group listing. Upon the receipt of additional information, Council recommended that six properties be deleted from the Amendment and the Panel recommended the removal of another four properties.

See also:

  • Guide to Planning Panels: Heritage > Comparative analysis > Intactness of buildings

2. Box Hill Central North Master Plan: a contested plan

The Box Hill Central North Masterplan was initiated by Vicinity Centres Pty Ltd through draft Amendment C245whse to the Whitehorse Planning Scheme. It was referred to the Priority Projects Standing Committee (Committee) which completed its report in November 2023 (Whitehorse PSA C245whse [2023] PPV 65). The Minister for Planning approved the Amendment on 27 June 2024.

Key features of the Master Plan include seven mixed use buildings ranging in height between 19 and 49 levels; car parking within basement and podium levels accessed off Clisby Court; new internal roads and pedestrian links; new civic plaza and pedestrian public plaza; closure of Fairbank Lane; landscaped public open space; and redevelopment of 8 Nelson Road (a Council-owned car park) into a public park.

The draft Amendment C245 sought  to introduce Clause 45.05 Road Closure Overlay into the Whitehorse Planning Scheme and apply the Road Closure Overlay to Fairbank Lane to facilitate the partial closure of Fairbank Lane (east of Nelson Road); apply the Specific Controls Overlay to the entire Master Plan area; and amend the schedule to Clause 45.12 Specific Controls Overlay to introduce Incorporated Document ‘Box Hill Central North Master Plan’.

The Committee noted at the outset that it was disappointing that the Proponent and Council were at odds for such a significant site that will have an enduring legacy.

Council was concerned about the form of and layout of development, the choice of planning control, the way in which the Proponent offered development contributions and public open space levies and how parking should be managed.

However, the Committee noted that the Proponent was firm in its views and did not concede in any material way for suggestions put by Council or the Committee. The Proponent was also very critical of Council, in what it described as ‘do nothing’ approach by Council.

Overall, the Committee found that Master Plan will guide the development of Box Hill Central North in a positive way, but agreed with some of the Council’s concerns relating to the public realm, the amount of affordable housing, public open space contributions and development contributions.

Four significant procedural issues were addressed by the Committee: impact of the proposed development on the Suburban Rail Loop (SRL) project; additional information relating to the inclusion of the Vision Eye Institute and the Nelson Park land in the Master Plan area, relocation of a lot to reduce overshadowing impacts on the Civic Steps and further consideration of the public open space contribution if the Civic Steps are not treated as being part of the public open space allocation; the Report from the Office of the Victorian Government Architect (OVGA); and Independent Broad-based Anti-corruption Committee Operation Sandon report.

With respect to the SRL, Council and many community submitters urged that this project not be progressed at this time due to the impact it might have on the proposed SRL development and its potential to prejudice the long term planning for the broader SRL Precinct. However, the Committee agreed with the Proponent that planning decisions should not be delayed simply because some strategic planning process is being proposed. The Committee was comforted by the response from the SRLA that it will continue to consult with the relevant decision makers about ongoing development of the Box Hill Metropolitan Activity Centre.

With respect to the additional information, the Committee noted that the Proponent did not seek to resile from its submissions made at the Hearing in considering alternative options and opportunities. The Committee stated:

The Committee was disappointed with the way in which the Proponent responded to some of its inquiries. It adopted a somewhat aggressive and combative approach to a range of matters in the Hearing. This was unhelpful and unnecessary. The Committee was seeking to work with the Proponent and Council to work through an acceptable outcome for the subject land for the benefit of the existing and emerging community of Box Hill and its surrounds.

With respect to Report from the OVGA, after the completion of the Hearing the Council sent a letter to the Committee that raised several issues in relation to a report from the OVGA. This Report was not provided to the Committee during the Hearing. The Committee stated:

The Committee does not consider it was well served by those parties or individuals who had knowledge of this report but did not bring it to the attention of the Committee. The Committee could then have at least made its own inquiries to determine whether the OVGA report might have added value to the whole process and assist in providing advice to the Minister for Planning. The Committee’s reading of the report indicates that it would have assisted the Committee and added considerable value to its understanding of the proposal, but for procedural fairness and transparency issues, the Committee is not able to use the report in considering this matter.

With respect to the Independent Broad-based Anti-corruption Committee Operation Sandon report, the Committee was perplexed by Council’s submissions  that the current drafting of the Amendment is opaque, particularly in relation to the Windfall Gains Tax. It stated:

The Committee raises its concern about the reference to the IBAC report and the verbal comments and inuendo made about this. The Priority Projects SAC process is an open and inclusive process. The Priority Projects SAC is a Ministerial Advisory Committee that has been operating since 2020. This is Referral 34. All submissions and evidence, and all other documents are provided through the public Hearing process in the public domain.

The Committee had no direction from the Minister for Planning nor the Department of Transport and Planning apart from what is contained in its letter of referral and the Terms of Reference signed by the Minister for Planning. The Hearing was undertaken in public at all times and there were no requests for in camera sessions. This Committee is not required to consider the Windfall Gains Tax. All witnesses were fairly cross examined and all submissions were made. 

The approved Incorporated Document can be found on the Whitehorse Planning Scheme website. It would appear that some of Council’s concerns have been accepted by the Minister. It includes a requirement that the Vision Eye Institute site be incorporated into the Master Plan; that no less than 10% of dwellings be provided for affordable housing; and that a section 173 agreement be entered into requiring the payment of development contributions consistent with The Whitehorse Development Contributions Plan 2023. The Incorporated Document excludes all other provisions of the Whitehorse Planning Scheme, except where specified. Clause 53.01 (Public open space contributions) is not one of the exceptions.

See also:

  • Guide to Planning Panels: Activity Centres > Procedural issues

3. Applying a DCP to an old residential estate

To ensure infrastructure upgrades to an old residential estate, the City of Casey prepared a Development Contributions Plan for the Collison Estate. This Estate was first developed in the 1950s and comprises 94 lots with predominantly gravel roads, an overhead electricity supply and no formalised drainage network or public open space.

The Estate adjoins more conventional housing and lot sizes associated with the recent growth of Cranbourne East through the Cranbourne East Development Plan 2014 and Cranbourne East Precinct Structure Plan 2010 including the Hunt Club and Cascades on Clyde estates and the Selandra Rise precinct.

In Casey C286case (PSA) [2024] PPV 25, it was proposed to implement the DCP through the application of the Development Contribution Plan Overlay (DCPO22) and include the DCP as an incorporated plan.

Other features of the Amendment include:

  • apply the Commercial 1 Zone (C1Z) to the local neighbourhood activity centre site identified in the Development Plan;
  • amend Development Plan Overlay Schedule 22 (DPO22) which currently applies to the Collison Estate; and
  • make other related changes to the Casey Planning Scheme.

Council submitted the subject land is ‘under pressure’ for further development given its proximity to more conventionally developed residential areas, but this has been difficult to facilitate despite its General Residential Zone (GRZ1). This was due to its fragmented land ownership and the inability for the market to deliver a shared infrastructure servicing outcome. It considered the Amendment provides the opportunity to unlock the potential of the subject land through the application of planning tools that provide an equitable framework for landowners and developers to contribute to the cost and delivery of new urban development.

Council advised that officers have been working with a landowner and potential developer syndicate (known as the Collison Committee) since 2019 in the preparation of a planning framework to facilitate the orderly urban development of the precinct. This included the draft Collison Estate Development Plan, KLM Spatial and City of Casey, October 2023 (Development Plan) which provides for over 1,600 dwellings, a local neighbourhood activity centre, associated infrastructure and open space.

The DCP applies to the entire Collison Estate. It identifies 30 projects with a total cost of approximately $66.6 million, of which $58.7 million (88 per cent) is to be apportioned to the DCP area for:

  • 6 road and 4 intersection projects
  • 17 drainage projects
  • a community facility
  • the planning costs associated with the preparation of the DCP.

No Community Infrastructure Levy is proposed to be applied through the DCP.

The Development Plan is not part of the Amendment and is yet to be finalised by Council under the provisions of DPO22. However, the Panel considered it provides the foundation for the DCP projects and will guide how they are ultimately designed. In the absence of a Precinct Structure Plan, the Panel also considered the Development Plan provides an important role in ensuring the DCP projects can be provided and delivered in a timely fashion and the vision for the Collison Estate can be realised.

The Panel supported the Amendment. It concluded that:

  • the DCP is critical to unlocking the development of this infill precinct through the equitable funding of important and necessary infrastructure;
  • the proposed transport projects provide for an appropriate transport and movement network and that there is a reasonable basis for their inclusion in the DCP;
  • the drainage projects will be critical to enabling the development of the Collison Estate and their full apportionment to the Collison Estate is justified; and
  • the overall costs of the Stormwater Strategy approach compared to a standard piped network approach remains unclear and Council is encouraged to undertake a full cost benefit analysis including lifecycle costs before adopting the DCP.

In addition, the Panel concluded the need for a neighbourhood activity centre is supported through economic analysis.

See also:

  • Guide to Planning Panels: Development Contributions > Development Contributions associated with structure plans