1. Shepparton North Activity Centre Structure Plan – the final outcome

The evolution of the Shepparton North Activity Centre Structure Plan (SNACSP) and associated planning permit applications for three supermarkets has been subject to a number of iterations since 2017, including through Planning Scheme Amendments C192 and C193 (see Greater Shepparton C192 and C193 (PSA) [2017] PPV 105, an Advisory Committee report (see Shepparton North Activity Centre (AC) [2020] PPV 65), and at the Victorian Civil and Administrative Tribunal (VCAT) (see, most recently, Shepparton Pty Ltd v Greater Shepparton CC [2024] VCAT 133).

Central to the dispute between the parties and what the structure plan was seeking to resolve was whether it was appropriate for three supermarkets to be established in the activity centre.

A Panel had recommended that AmC193 be deferred to allow the Council to properly define the activity centre and prepare a structure plan and to provide the owners of the review site with the opportunity to ‘re-think’ the site so that it can develop as a catalyst for a co-located supermarket site.

Subsequent to the Panel report, the Minister appointed an advisory committee to advise on the appropriateness of planning scheme amendment C193 Part 2. It recommended that:

  • AmC193 Pt 2 be abandoned and that no permit be issued for a full-line supermarket (the third supermarket).
  • The Council prepare a Structure Plan for the Shepparton North Activity Centre within six months of the date of the report.
  • The area within the Structure Plan to extend south and west of the nominal activity centre area.

In Greater Shepparton C245gshe (PSA) [2024] PPV 9, a Panel considered the updated structure plan that proposes two retail nodes, these being Precinct 1 to the south (located in the Commercial 1 Zone, currently improved with an existing supermarket but with a permit to develop two supermarkets) and Precinct 2 to the north  (located in the Commercial 2 Zone, which is largely vacant, and for which permits have previously been sought for retail).

The Panel noted there have been several permits issued in Precinct 1, but none have been acted upon. The Panel was advised a further time extension for the two already permitted supermarkets is currently being sought. The Panel further noted there has been no change in retail activity on that site since the first Panel Hearing in 2017, and stated “it has not delivered on its promise to the surrounding community.”

An application for a supermarket had been made in Precinct 2, but both the Panel and Advisory Committee (referred to above) held a Structure Plan should first be prepared to provide for a long-term strategic framework for the Shepparton North area.

Including Precinct 2 within the activity centre boundary was strongly criticised by the retail developers of Precinct 1. It was argued that the structure plan layout would effectively split the activity centre, not book end it. It highlighted six main problems: oversupply of supermarket (and retail) floorspace; retail hierarchy; disconnected retail nodes; inappropriate roads; southern site requirements; and incoherence.

On the two retail precincts, the Panel stated:

The Structure Plan recognises the long-standing tension about the two retail nodes, the southern site in the Commercial 1 Zone, and the northern site in the Commercial 2 Zone. The Panel has approached consideration of the two sites for potential retail purposes with an open mind. A key challenge is to functionally link these two key sites, where both may be used for retail and other purposes. The Panel notes that since the 2017 Panel, there has not been any new development on the southern site, despite the issue of permits, now for two supermarkets.

As to whether the activity centre should accommodate three supermarkets, the Panel stated:

The economic evidence built on the 2017 Panel and the 2020 Advisory Committee Reports. The evidence in this Hearing focused on whether the Lascorp land should be included in the northern core retail area and in the Activity Centre Zone; and the implications a potential third and/or fourth supermarket being developed in the SNAC.

The current catchment population of around 24,000 is deemed sufficient to support two full-line supermarkets in line with the findings in the previous Hearings. Shepparton Pty Ltd’s permit, if built, will satisfy this demand. The demand for a third full-line supermarket is dependent on population growth in the trade area. This was optimistically forecast to be around 300 people each year.

Given this rate of population growth, there is unlikely to be demand for a third supermarket until at least 2036 and possibly into the 2040s or later.

The Structure Plan allows for 13,500 square metres of supermarket floorspace as-of-right across Precincts 1 and 2. There is no cap on retail shop floorspace in these two precincts. The current permit in Precinct 1 is for two supermarkets with a combined floorspace of 7,400 square metres. The Panel finds this outcome is appropriate. Council concentrated on the long term for the Structure Plan and has attempted to facilitate the development of a second full-line supermarket which it considers is well overdue. The Panel has concerns that although there should be a net community benefit from implementation of the Structure Plan in the long term, there may be some risk of disbenefit in the short to medium term.

However, the Panel criticised the recent approval for changes to the supermarkets, approved by the Tribunal in Shepparton Pty Ltd v Greater Shepparton CC referred to above (see also editorial comment VCAT Volume 11 No 9). It stated:

The most recent permit turns it back on the Activity Centre and from a connectivity and integration perspective, it is an unfortunate outcome. If that permit is acted upon as a catalyst development in the ‘heart’ of the Activity Centre, it will look outwards, not inwards and the north facing walls will present as an impenetrable barrier to the north.

As noted by the Panel, the structure plan is not perfect and it is rare that a strategic document of this nature, where it is planning for a long term horizon, is perfect.

It will be interesting to see whether the two future supermarkets will be constructed and whether the activity centre will be develop into a success story or something else.

See also:

  • Guide to Planning Panels: Activity centres > Economic impacts

2. Conditional approval for the Mt Fyans Wind farm

In Mount Fyans Wind Energy Facility (PCI) [2023] PPV 47, an advisory committee appointed to consider a ‘called-in’ application for a 400-megawatt, 81 turbine wind energy facility recommended that prior to the approval of the permit, the Applicant undertake further assessments on Brolga, Southern Bent-win Bat and other flora and fauna.

Each wind turbine would be a maximum of 200 metres above ground level (to blade tip). Other infrastructure associated with the project includes 19 kilometres of overhead electrical transmission line, an on-site substation and grid connection substation connecting the wind energy facility to the National Electricity Market at the Mortlake Terminal Station; two wind monitoring masts, cabling, road works including access and the associated removal of native vegetation.

As a result of public exhibition in early 2023, 91 objections (including a late submission), 13 supporting submissions and 8 submissions from referral authorities or other agencies were received.

With respect to Brolga, the Committee held:

The Panel has relied on the Interim guidelines for the assessment, avoidance, mitigation and offsetting of potential wind farm impacts on the Victorian Brolga population, DSE 2011, Revision 2012 (Brolga Guidelines) to assess the impacts on Brolga. Since the development of the Brolga Guidelines and the Applicant’s Brolga Report the status of Brolga under the Flora and Fauna Guarantee Act 1988 has changed from vulnerable to threatened. In this context the assessment of impact needs to establish that a net zero net impact can be reasonably achieved consistent with the objectives of the Brolga Guidelines. This is critical to avoid irreversible damage and to reasonably mitigate impacts including cumulative impacts.

The Panel was not persuaded through evidence and submission that the methodology applied in the Brolga Report was sufficiently robust across all three required levels of assessment in the Brolga Guidelines to provide an appropriate level of confidence that:

    • all existing and potential flocking and breeding areas have been properly identified and buffered
    • breeding buffers substantially less than the default 3.5 kilometre buffers (including disturbance buffer) in the Brolga Guidelines can be supported
    • the proposed mitigation measures will be effective in mitigating impacts
    • habitat and movement corridors have been adequately considered as required at Clause 52.32-4
    • the Project will achieve a net zero impact and avoid cumulative impacts on the Victorian Brolga or that the potential impacts are acceptable.

Further work is required to address impacts to Brolga or develop appropriate mitigation measures before a permit can be further considered. This includes further work to confirm breeding sites and buffers, flight behaviours to inform collision risk modelling and a completed population viability analysis and Brolga Compensation Plan.

On the Southern Bent-wing Bat, the Committee held:

Insufficient application information was supplied concerning potential impacts on the SBWB and mitigation measures to provide the necessary level of confidence that significant impacts will not occur. This includes the cumulative impacts of the Project and other existing wind energy facilities.

Further information is required for SBWB prior to further consideration of a permit including examining potential impacts and mitigation measures arising from movement within and through the site and completion of the Adaptive Management Plan and population viability analysis as part of a final Bat and Avifauna Management Plan.

On other fauna, the Committee held:

Based on the information provided, the Panel does not have sufficient confidence that potential impacts on listed bird and bat species, including habitat and movement corridors, are able to be acceptably managed. Further information is required to appropriately consider potential impacts including:

    • investigation and assessment of the potential impacts on additional Flora and Fauna Guarantee Act 1988 listed species including on habitat and movement corridors
    • completion of a Bat and Avifauna Management Plan (BAM Plan) which includes a range of recommended matters relating to species inclusion, mortality monitoring and review.

The Project is unlikely to result in a significant impact on aquatic species and other reptiles through the implementation of appropriate mitigation measures. However trenchless technology should be used for cabling and other infrastructure wherever possible to avoid impacts on waterways and listed aquatic species. Survey efforts for Hairy Burrowing Crayfish prior to works on Blind Creek should be extended to include Little Galaxias to ensure impacts on that species are avoided.

Its overall conclusion having regard to the integrated assessment approach, the Committee stated:

The Project is likely to result in positive community benefits through the delivery of renewable energy to address climate change impacts and achieve energy emission reduction. It will provide for the efficient utilisation of existing power generation and transmission infrastructure and is likely to have local and regional economic benefits.

However, the Project has the potential to have material impacts on the environment, particularly on Brolga and SBWB. In the Panel’s view there is too much uncertainty about these impacts based on the level of information provided for it to have an appropriate level of confidence that these impacts are acceptable. These issues cannot be satisfactorily mitigated through permit conditions at this stage.

The Panel considers this level of uncertainty outweighs the positive outcomes of the Project, and tips the balance of the Project to one that will not have a net community benefit or achieve a sustainable development outcome.

However, the Panel considers that if additional work is undertaken as identified in Chapter 3, many of its concerns relating to biodiversity impact can be addressed and responded to, potentially through a modified proposal. This may enable the subsequent issue of a planning permit consistent with the Panel’s version of conditions in Appendix F.

See also:

  • Guide to Planning Panels: Wind Farms > Flora and fauna impacts

3. Three significant developments receive support

In the latest report period, reports on three significant development proposals have been released by the Minister:

The first two reports were prepared by the Priority Projects Standing Advisory Committee that was appointed by the Minister for Planning on 14 June 2020 to:

… provide timely advice to the Minister for Planning on projects referred by the Development Facilitation Program (DFP), or where the Minister has agreed to, or is considering, intervention to determine if these projects will deliver acceptable planning outcomes.

In Priority Projects Standing Advisory Committee Referral 35, the Committee considered a planning scheme amendment proposing to rezone the remaining Mixed Use Zone land within the Victoria Gardens Precinct to Comprehensive Development Zone – Schedule 1 and proposing amendments to Schedule 1 to the Victoria Gardens Comprehensive Development Plan, including changes to height controls. A Parking Overlay is proposed for the subject land and an Environmental Audit Overlay is proposed over a small part of the land. The permit application is for six mixed-use towers and a minor extension to the shopping centre within the Doonside Precinct on the southern section of the subject land.

The report was dated 23 December 2023 and released on 19 April 2024.

Key issues raised in submissions included:

  • built form and urban design, including height and mass
  • open space and community infrastructure
  • traffic impacts, including pedestrian connectivity
  • environmental impacts
  • social and affordable housing
  • development contributions.

The Committee noted Council was particularly concerned about the potential for the site not to be subdivided if a ‘build-to-rent’ model was adopted as this would not trigger the payment of open space contributions.

Council acknowledged Clause 53.23 provides that 10 per cent of all dwellings must be affordable, but questioned how affordability might be determined to one or more income groups in the context of market value in the City of Yarra. It questioned whether a 20 per cent discount to market value for dwellings which are provided for, or 30 per cent for dwellings which are leased, brings an apartment into the affordable range. Council noted the CDZ1 stated “at a discount to market of not less than XX%”. Council observed the discount needed to be more than the specified percentage to make it affordable, and acceptable to Council. It suggested drafting changes to makes that clearer, and avoid leaving room for argument that the minimum percentage necessarily complies with the obligation.

Council considered the 12 year lease option to be too short and agreed with expert planning advice called by the Proponent that it should be for 25 years.

Council recommended a planning permit condition to effect a contribution in the event subdivision does not occur within a certain timeframe.

The Committee stated:

The key concern of the Committee is the length of the lease option. It does not consider 12 years to be long enough. While the Committee accepts there will be ongoing maintenance to each unit during and at the changeover of tenants, this will occur continuously due to the housing model preferred for the Doonside Precinct site – that is, the BTR model. Twelve years is not long enough to make an effective contribution. The Committee considers a 30-year lease period is more appropriate.

One procedural issue of note addressed in the Committee report was in relation to the Independent Broad-based Anti-corruption Committee (IBAC) Operation Sandon report. In its submissions, Council observed the draft Amendment made significant changes to the existing planning controls, which it contended should not be made unless it was supported by more robust and detailed analysis. The submission then quoted Recommendations 5 and 8 from the IBAC report, for which Council said the further analysis would be consistent with the level of planning justification required by these recommendations.

These concerns were based on the evidence of Council’s urban design expert, notwithstanding Council maintained the strategic policy setting for the proposal was not in question. With the Committee seeking to understand this position better, Council said it was not suggesting or inferring there was any improper conduct by the Proponent, DTP or the Committee. The Committee stated:

In its closing submissions, the Proponent verbally spoke about Council raising issues about the IBAC report in the context of this matter. It noted it was disconcerting to raise the IBAC findings in relation to alleged municipal corruption in this Hearing. The Proponent noted there has been no changes to the Victorian planning system as an outcome of the report and it urged Council to be cautious in raising these issues with any implication of corruption. The Proponent noted raising the issue of corruption in these proceedings was alarming and Council should not have said what it did.

The Committee shares these concerns and agrees with the Proponent. If Council had any concerns about any corruption in this process, it should have been explicit about this and it should have backed it up.

Contested hearings provide the opportunity for all parties to make submissions and provide evidence about the proposal at hand. Witnesses do not always agree about a matter and that is the benefit of having independent expert witnesses. It often leads to agreement of some key issues, or changes to a proposal. Good evidence informs the Committee process and it is highly valued.

The Committee considers it was inappropriate to weave into its submissions the matters raised by Council and in fact, the Committee was at a loss to understand why Council took that position. If the Council was truly concerned about any inappropriate behaviours or potential corruption, it should have been explicit in raising this issue and it likely could have taken that elsewhere (for example to the Supreme Court, IBAC or Victorian Ombudsman). The Committee is not sure that just because expert evidence from one witness (who has acted for Council for many years and has worked with Council on multiple projects) was overly critical of the design response, that should be linked to IBAC and its recommendations contained in the Operation Sandon report.

Overall, the Committee found that the Comprehensive Development Plan will guide the development of the Victoria Gardens Precinct and that the site is well suited to provide higher density housing and impacts can be acceptably managed.

In Priority Projects Standing Advisory Committee Referral 36, the Committee considered a planning scheme amendment to rezone the main hospital site, some car parking areas and part of the road reserve to Special Use Zone Schedule 2 and a planning permit application to enable the existing theatre block in the north-west corner of the subject land to develop new theatres and holding rooms.

As to the importance of the hospital to the broader community and the role of the Minister, the Committee stated:

The hospital’s catchment stretches beyond Stonnington’s municipal boundary and decisions about how it uses and develops its land will affect the ability to meet health-related planning objectives at a regional and state level. The broader present and future community will rely on the timely expansion of Cabrini Malvern which itself relies on timely planning decisions. It is appropriate and justified for the Minister for Planning to be the responsible authority for the subject land.

Seventy two submissions were received following exhibition of the proposal. Issues raised included:

  • strategic issues
  • schedule provisions
  • heritage – impact on the existing Coonil Estate Precinct if the Heritage Overlay is removed from 4 Coonil Crecent and larger built form is enabled
  • design response and amenity
  • traffic, parking and potential loss of the Coonil Crescent road reserve
  • construction impact
  • the responsible authority for the subject land
  • restrictive covenant
  • drafting issues with the permit conditions and proposed planning provisions.

Of some concern to the Committee were the design response and amenity impacts. It stated:

Future built form enabled by the exhibited DPO6 building envelopes would not appropriately respond to the subject land or surrounding residential area if the envelopes are applied in their exhibited form. The exhibited Stage 2 building setback of 6 metres from Derril Avenue is inappropriate because it would:

    • be insufficient to mitigate the visual dominance of a bulky building of up to 14.7 metres (since revised to 12.7 metres) from surrounding residential streets
    • unreasonably impact the Derril Avenue streetscape through its inconsistent design response.

The Stage 2 building should be set back at least 10 metres from the Derril Avenue boundary to mitigate its scale, be generally consistent with other setbacks in Derril Avenue, and to enable canopy trees which would help soften views towards the building.

The setback of 9 metres along the subject land’s eastern boundary is generally appropriate as a landscape buffer to support the hospital’s amenity. However, it should have a built form break mid-way along the Stage 2 building envelope to reduce overall bulk and to increase sun penetration to the eastern properties.

The areas shown in Figure 8 should have deep soil to enable canopy trees.

There will be reasonable on-site and off-site amenity impacts regarding overshadowing if buildings are revised to the Committee recommended building envelopes shown in Figure 7. The issue of overlooking cannot be determined at this stage because the Amendment proposes building envelopes which do not include the location of windows.

Development Plan Overlay Schedule 6 should be revised to apply the mandatory maximum heights and minimum setbacks specified in Plans 1 and 2. It should also require a site master plan to include:

    • building height transitioning from the west corner down to the east and north edges of the site
    • the impact of the built form on vistas and view lines from the adjacent heritage precinct
    • building envelopes for new buildings including maximum building heights, minimum separation distances between buildings, and minimum setbacks from street frontages in accordance with Plans 1 and 2.

In Greater Geelong PSA C436ggee [2024] PPV 13, a combined planning scheme amendment and planning permit application was proposed to facilitate Stage 5 of the Balmoral Quay development at 1 and 11 Harbourside Drive, Rippleside to:

  • increase the maximum building height from 13.5 to 27 metres AHD
  • increase the number of dwellings permissible without a permit to 194.

There were 173 submissions received. Key issues raised included:

  • height and built form
  • off-site amenity impacts including overshadowing
  • loss of views
  • access, traffic and car parking.

Council supported the proposal.

A planning scheme amendment was not actually required to facilitate the development. However, the Panel supported the Proponent’s approach, stating that:

This is an unusual case in the sense that a planning scheme amendment is usually required to facilitate something that can’t already occur. In this case, under the existing planning controls for the subject land, there is the opportunity to apply for a permit for what is before this Panel – a planning scheme amendment isn’t necessarily required.

However, the Amendment has been pursued for valid and good reasons. These include the long passage of time between today and when the existing provisions (the CDZ2, Development Plan and Urban Design Guidelines) were approved and the consequential need to update and refresh these provisions. Importantly, there is a renewed emphasis at both state and regional levels that residential development muststop growing out and land already earmarked for urban development should be better utilised. The subject land, while still undeveloped, has a unique opportunity to “do more” to advance the policies presently found in the Planning Scheme.

While the Planning Scheme does not specifically identify the subject land as an area for increased housing opportunity, the location of the subject land is well suited for higher density housing. It is near a major road and, with access to the Geelong Central Business District, public transport, and cycling and walking paths. The apartment typology will ensure there are increased housing choices for a wider range of household types and income levels within a well serviced and established residential setting.