PPV Volume 11 No 5

1. Final report on Yarra’s public open space contributions

It may be recalled that in Yarra C286yara Interim Report (PSA) [2022] PPV 19, the Panel recommended, inter alia, that Council:

  • Prepare a new planning scheme amendment  seeking an open space contribution rate of 7.4 per cent.
  • Commission a peer review of the apportionment of costs of open space projects between existing and new populations.

In Yarra C286yara Final Report (PSA) [2024] PPV 6, the Council requested that the Panel be reconvened to consider a revised open space contribution rate of 8.67 per cent, subsequently revised to 8.65 per cent.

In supporting the Amendment, the Panel concluded that:

  • The apportionment of project costs between existing and new users could not be replicated by the peer reviewer.
  • An alternative approach to justifying the proposed apportionment of costs is acceptable to the Panel.
  • A comparison of the ratio of the percentage of project cost apportioned to the new populations, divided by the new populations’ share of the total populations, termed a multiple, is a useful indicator for comparing apportionment outcomes across comparator municipalities.
  • The context for consideration of the Amendment has changed significantly in the almost two years between the Interim Report and the reconvened Hearing.
  • An open space contribution rate of 8.65 per cent compares acceptably with recent outcomes in other municipalities.
  • The urban form and open space context in Yarra contribute to the justification for the proposed open space contribution rate.
  • Considering all the factors listed above, in combination, an open space contribution rate of 8.65 per cent is justified.
  • The Panel’s initial recommendation with respect to Clause 22.12 is now redundant because of the approval of Yarra Planning Scheme Amendment C269yarra which incorporated much of the previous Clause 22.12 into a new Clause 19.02.
  • The Panel’s initial recommendation regarding a ten per cent allowance to CIV in calculating the cost of land to be acquired is also redundant as it has been incorporated into the recommended open space contribution rate of 8.65 per cent.

The following key issues were addressed by the Panel:

Cost apportionment

The Panel accepted that the apportionment of project costs between existing and new users could not be replicated by the peer reviewer because a qualitative methodology, particularly one as nuanced as Council’s open space consultant, approach with its eight variables and decile percentage cost allocations, will be difficult to replicate exactly. The Panel considered the fact that the peer reviewer was unable to replicate the project-by-project apportionment was not fatal to the Council’s case to have a higher rate than that recommended in the Interim Report. It stated:

The Panel relies on the fact that its original concern was that some apportionments may have been allocated a higher percentage decile than was justified, for example, a 10/90 (existing/new population) apportionment might have been better as a 20/80 apportionment. The Panel agrees with Council that there is a basic alignment of the project descriptions and the cost apportionment and notes that some descriptions could have been better expressed and more detail provided on the weightings given to each of the eight factors to provide a higher degree of transparency. The Panel notes that while it was taken by submitters opposing the Amendment to examples where cost apportionment to the new population was potentially high, the Panel has not assessed whether there might be some projects where this apportionment may have been low (one would not expect opposing submitters to bring such examples to the Panel’s attention).

Because the project-by-project apportionment outcomes could not be validated by peer review, the Panel was faced with the following interrelated questions:

  • can the overall cost apportionment outcome be justified another way?
  • can the open space contribution rate otherwise be justified?

One submitter’s expert proposed that one way to analyse the cost apportionment outcome in Yarra is to use the ratio of the new population as a proportion of total population, divided by the project cost apportioned to new populations as a proportion of total project cost, this ratio was described as a ‘multiple’. In response, the Panel stated:

The Panel acknowledges a multiple has not been used in this context before and is not recognised in any guidance. However, the Panel notes that it is not unusual to use ratios such as this when comparing data sets.

The Panel does not consider it appropriate to use the multiple to validate or verify the project-by-project apportionment undertaken by Ms Thompson, or indeed the apportionment outcome, and has not done so. However, the Panel has found comparisons of the various multiples calculated by Mr Hrelja a useful tool as an indicator to assess the fairness and reasonableness of the cost apportionment outcome in Yarra compared with other municipalities. It accepts that this is not a precise test.

Comparison of the multiples demonstrates that the apportionment outcome in Yarra is not out of line with what has been accepted by panels and the Minister for Planning as appropriate and therefore presumably equitable in other municipalities. It also demonstrates that it is not unusual for the cost apportionment to new populations to deviate considerably from the proportion they comprise of the total population at the end of the planning period, a matter about which the Panel expressed surprise in its Interim Report.

Appropriateness of contribution rate

The Panel agreed with Council’s submissions that comparison of the final open space contribution rates approved in other municipalities is another useful tool to understand where a proposed contribution rate sits within the range of rates that by virtue of their approval have been considered fair and reasonable. It stated:

Looking first at the three rates approved in 2023, the Panel noted that they range from 6.3 per cent to 8.3 per cent. In the Panel’s view, the fact that rates of this quantum have recently been accepted as fair and reasonable demonstrated that a rate of 8.65 per cent (and the lower 7.4 per cent) is not unreasonable. What is now proposed for Yarra is clearly not an order of magnitude higher than the rates accepted in other municipalities.

However, the Panel considers that these three examples do not provide direct comparisons for Yarra, or a stand-alone justification, for a rate of 8.65 per cent because:

    • the three municipalities concerned do not have an urban form similar to Yarra
    • the development pressures in Yarra are much higher than the three municipalities, evidenced by the much higher new population shares predicted for Yarra.

….

The Panel accepts that although the proposed rate of 8.65 per cent is not an order of magnitude higher than the rates approved for other municipalities, if accepted it would become the highest municipal rate to date. The Panel considers that the following factors set Yarra apart and justify a higher rate than other municipalities in the data set (excluding Melbourne, as discussed in Chapter 3.2, and Maribyrnong, discussed above):

    • Yarra has much higher expected growth than other municipalities, as evidenced by new population as share of total population
    • the high proportion of medium and high-density dwellings (with less private open space) in Yarra as compared to Greater Melbourne
    • the historical urban form (former industrial and manufacturing areas which historically did not have public open space).

See also:

  • Guide to Planning Panels: Public open space contributions : Stand alone amendments

2. Protecting Maroondah’s post war history

In Maroondah C148maro (PSA) [2024] PPV 4, it was proposed to implement the recommendations of the Maroondah Heritage Study Review to:

  • apply the Heritage Overlay to 36 individual places, three precincts and one group listing
  • introduce separate Statements of Significance for all places and precincts
  • introduce Heritage Design Guidelines for two places, one precinct and one group listing.

The main focus of the Heritage Study Review was on Maroondah’s post war history. The Panel observed that during this period residential, commercial and industrial expansion transformed the municipality from a series of villages interspersed with orchards and farming on the outer edge of Melbourne into a series of connected suburbs of Melbourne. This generally occurred between from 1945 and into the 1970s and brought with it new approaches to housing, design and Modernist architecture, and with the increased population there was an expansion in commercial and industrial activity to provide jobs and employment for new residents.

Submissions to the Amendment raised issues common to heritage amendments, such as impact on development opportunities, building condition, impact on property values and housing affordability. There were also submissions that questioned the heritage significance of the places proposed to be included in the Heritage Overlay.

Noteworthy issues identified by the Panel included:

  • Intactness and integrity
  • Threshold issues and the Victoria Heritage Register (VHR) guidelines
  • The Ringwood Drive-in Shopping Centre Precinct
  • Group listing of contemporary homes.

Intactness and integrity

Many submitters considered changes to their buildings (intactness) had resulted in substantial change to the place to a degree where its integrity (or ability to be understood as a heritage place) was compromised.

The Panel noted that Council seemed to have used ‘intactness’ and ‘structural integrity’ as a means of describing the buildings condition. The Panel considered that integrity is a different concept to intactness. It stated:

Intactness can be described as the degree to which a place retains significant fabric and integrity is whether the heritage values of place can be appreciated or understood. The CHR Guidelines define integrity as:

Integrity: refers to the degree to which the heritage values of the place or object are still evident and can be understood and appreciated (for example, the degree to which the original design or use of a place or object can still be discerned). If considerable change to a place or object has occurred (through encroaching development, changes to the fabric, physical deterioration of the fabric etc) the significant values may not be readily identifiable and the place or object may have low-level integrity.

The level of intactness is a significant part of establishing whether a place has heritage significance or not. Similarly, whether a place can be appreciated or understood for its heritage values is also an important and relevant consideration. Judgement will need to be made on a case-by-case basis or guided by, as is the case with the Contemporary Homes group listing, the filtering criteria to determine whether a building is substantially intact or has a requisite level of integrity.

Threshold issues and the VHR

The critical issue for Council and submitters was whether a threshold had been met for local heritage significance. As noted by the Panel, previous planning panels have commented extensively on this. It considered in the present proceeding it had adopted a consistent approach and notes Criteria A (historical significance), D (representative significance), E (aesthetic significance) and F (technical significance) all require that ‘importance’ is demonstrated. It stated:

The VHR Guidelines are relevant for determination of State heritage significance, not local significance. The Panel concluded the primary consideration is the comparative analysis and PPN01 and references to the VHR Guidelines to reach conclusions for whether local heritage significance has been established should be avoided. The Panel gives greater weight to the level of intactness and the integrity of a building than the use of the exclusion guidelines in the VHR Guidelines.

The Ringwood Drive-in Shopping Centre Precinct

This was the only non-residential precinct considered by the Panel. The Statement of Significance notes it is historically significant as notably early evidence of the post-WW2 boom of new commercial and especially retail architecture that significantly reshaped the Maroondah Highway in the 1950s and ‘60s, when the shopping experience was fundamentally transformed by rising affluence, increased car ownership and changing consumer expectations. The complex is architecturally significant as an early example of a retail development that was specifically conceived for the consumer as a motorist rather than a pedestrian.

In rejecting its inclusion in the Heritage Overlay, the Panel stated:

The Panel does not consider the concept of an early drive-in shopping centre is so important that it meets the threshold for Criteria A and B. The comparative analysis considers rarity has been established as other similar examples have either been demolished or closed in preparation for redevelopment. The Panel accepts this may be a relic of the past, but retailing is one form of land use where there is a constant level of change providing for the needs of the community. Outwardly it presents as an older part of the Ringwood shopping centre and its integrity is questionable as a heritage asset. It is an example of an earlier form of retail development however a level of importance has not been demonstrated.

The Panel does not consider it has been adequately demonstrated that the precinct is:

    • important to the course or pattern of Maroondah’s cultural history
    • rare as it presents as a typical suburban shopping centre that has changed over the years.

Group listing of ‘Contemporary Homes’

The Roslyn estate comprises 143 lots and it is estimated that 65 dwellings were developed by Contemporary Homes Pty Ltd. Initially 24 properties were considered as a precinct control, however following objections it was revised to a group listing. In defining the group listing Council’s heritage consultant developed the following set of filtering criteria to determine whether a dwelling was ‘substantially intact’:

  • original external finish, either vertical timber boards or unpainted brick retained
  • original fenestration, as seen from the public realm, remained largely unaltered
  • only have minor additions to the front (such as trabeated porches or verandahs, timber decks or paved terraces) and/or the side (such as carports or small additions).

The Statement of Significance stated that the Group is historically significant for associations with the emergence of architect-designed project housing in the City of Maroondah and, specifically with the company the effectively pioneered this typology in Victoria. The modern era of project housing, where homebuilding companies erected dwellings to their own standard designs, was introduced in 1955 when Contemporary Homes Pty Ltd unveiled its Peninsula house, a standardised modular dwelling designed by Robin Boyd.

By the time of the Hearing Council proposed to retain eight properties in the Group listing and this was reduced to five in Council’s final position.

The Panel accepted that a Group listing is appropriate for the Contemporary Homes list and noted that the number of properties is important to determine its heritage cohort. Ultimately the Panel supported the inclusion of four properties in the Group listing. It stated:

What is important, is whether there is a shared common history that is important, the sharing of common characteristics and its application to several non-contiguous properties across a geographical area. The Panel considers this is the case with the Contemporary Homes group listing.

See also:

  • Guide to Planning Panels: Heritage > Criteria and thresholds, Intactness of buildings, Serial listings

3. Green light for Portland abalone aquafarm

Following a refusal by VCAT for an abalone farm in Portland (see Matuschka v Glenelg SC [2020] VCAT 1452, editorial comment VCAT Vol 8 No 9), the Priority Projects Standing Advisory Committee (the Committee) has, in Glenelg PSA C109gelg [2023] PPV 15, recommended approval.

The proposal was described by the Committee as a ‘pump ashore abalone farm’ which pumps ocean water to the onshore facility where the abalone are raised over three-years. Water is cycled through the farm 24 hours a day to provide oxygen to the abalone. The abalone are housed in different structures over their lifecycle including ‘grow-out tanks’.

The grow-out tanks are relatively shallow tanks housed in buildings covered by shade-cloth to filter out direct sunlight to reflect the conditions five metres underwater.

The proposal was refused by VCAT because of visual impacts from dwellings that overlook the site and its impact on the surrounding landscape within the Rural Living Zone. The Tribunal found otherwise the proposal to be acceptable. Environmental approvals had granted by the Environment Protection Authority.

Since the Tribunal decision, two biodiversity issues had emerged: firstly, the presence on the site of the recently listed Flora and Fauna Guarantee Act 1988 Portland Burrowing Crayfish; and secondly, the potential for a recently listed seagrass species to be present in the marine environment in the location of the approved inlet and outlet pipes.

The proposal before the Committee has half the abalone throughput of the refused original proposal – 500-tonnes per annum compared to the earlier proposal of 1,000 tonnes per annum. In addition, modifications had been made to reduce its visual impact. The Committee considered the substantive issues to be considered are:

  • impacts of the revised proposal on:
    • visual amenity of the dwellings that overlook the proposal, given that the current proposal is intended to reduce these impacts compared to the original proposal
    • the Portland Burrowing Crayfish
    • the seagrass
  • whether the existing Cultural Heritage Management Plan approves the current proposal
  • whether the proposed conditions on the proposal are appropriate.

Unlike the VCAT proceedings, which considered an application for a planning permit, the Committee considered a proposed planning scheme amendment to:

  • apply the Specific Controls Overlay (SCO) to the subject land to ‘turn off’ the rest of the planning scheme
  • include an Incorporated Document to facilitate the use and development of the subject land for an abalone farm (aquaculture facility).

The Committee made some  interesting observation about the community understanding of the proposal. It stated:

What is before the Committee and what many submitters think is before the Committee are two different things. Not just in terms of the approval that this report will inform, but of the impacts of the Proposal. This report is focussed on the planning approval of the Proposal with critical environmental approvals already in place.

If the Proposal had the impacts many submitters fear it will have, it would clearly deserve refusal – but it will not have these feared impacts, and the impacts it will have can be appropriately managed. In fact, approval for many of these aspects have already been granted.

For many of the submitters the impact will be a broad landscape impact in their neighbourhood. These impacts are important, and a key issue before the Committee is whether these impacts will be acceptable.

The Proposal will have a marked effect on the outlook of a few dwellings, and these most affected submitters have taken the lead in supporting community submissions to the Proposal. Many of the submitters believe that approval of the Proposal would be a catastrophe, with significant impacts on their lifestyle, and some believe on their mental health. It is not clear the basis on which submitters have reached these conclusions, when the actual impacts of the Proposal are examined and when VCAT specifically determined that a wide range of impacts of the previous larger proposal were acceptable. Yumbah might reflect on its community engagement processes.

This is particularly the case in terms of its engagement with the Gunditj Mirring Traditional Owners Aboriginal Corporation in relation to the cultural heritage issues, noting:

    • no further consultation with the Gunditj Mirring Traditional Owners Aboriginal Corporation was considered necessary because of the existing Cultural Heritage Management Plan relating to the Original Proposal, but
    • the existing Cultural Heritage Management Plan was approved by a delegate of the Secretary, Department of Premier and Cabinet, not the Gunditj Mirring Traditional Owners Aboriginal Corporation because, at that time, the corporation was under special administration.

In supporting the proposal, the Committee stated:

Certainly many people (though not all) will not find the facility appealing to look at, at least until the screening landscape grows, but this impact falls far short of the impacts many submitters feared. It will have a direct visual amenity impact of only a few dwellings. Most submitters will see the Proposal as they drive (or walk) past it along Dutton Way and from this view it will be screened by vegetation, including existing vegetation for a significant length.

There is strong policy support for aquaculture in planning policy. This needs to be balanced against other policies including the purpose of the relevant zone, the Rural Living Zone, which has the purposes:

    • To provide for agricultural [which includes aquaculture] land uses which do not adversely affect the amenity of surrounding land uses.
    • To protect and enhance the natural resources, biodiversity and landscape and heritage values of the area.

VCAT reached a view that many of the Original Proposal’s impacts would be acceptable, and where there has not been a change in circumstances or policy, and the impacts of the Proposal will not be greater than the Original Proposal, VCAT’s decision should be accepted.

There is clear policy support for aquaculture and the Committee must assess the Amendment against the principles of net community benefit and sustainable development, as set out in of the Planning Scheme.

In terms of critical impacts:

    • The Proposal will be obliged to meet accepted noise and odour standards.
    • There is a need to manage impacts on the Portland Burrowing Crayfish.
    • The Incorporated Document should include more explicit requirements in respect of landscaping.
    • The Proposal will not have a long term adverse impact on the visual amenity of Dutton way.
    • The Proposal will not have a significant impact on visual amenity from public vantage points along Princes Highway, the Great Southern Walk and the Frank Lodge Scenic Lookout.
    • All guidance in relation to minimisation of visual impacts has been followed.
    • There is no strategic basis for rejecting the Proposal on ‘landscape and visual’ distinct to private amenity issue.
    • The change to the views enjoyed by the escarpment properties will be acceptable in the context.

The Committee concluded the Amendment:

  • is supported by, and implements, the relevant sections of the Planning Policy Framework
  • is consistent with the relevant Ministerial Directions and Practice Notes
  • is well founded and strategically justified
  • should proceed subject to addressing the more specific issues raised in submissions as discussed in the following chapters.

See also:

  • Guide to Planning Panels: Major commercial development

4. Temporary Worker accommodation approved in Warrnambool

Practitioners would be well aware that part of the housing crisis is key worker accommodation in regional and rural areas.

In Priority Projects Standing Advisory Committee Referral 32 (AC) [2023] PPV 57, the Priority Projects Committee (the Committee) considered a Key Worker Accommodation Village (Village), to consist of 221 units to accommodate a maximum of 231 Midfield workers on a temporary basis (up to 2 years). Midfield operates a large meat processing factory in Warrnambool.

The planning scheme amendment proposed applying a Special Controls Overlay and an Incorporated Document. The land is currently in the Farming Zone.

The site is approximately 2.4 hectares with residential, rural residential and rail interfaces.

The 221 units would accommodate a maximum of 231 persons, plus an onsite manager who would provide support for residents 24 hours a day, 7 days a week.

Units will be offered to new employees relocating to Warrnambool as part of their renumeration package. There will be a mix of three different unit types:

  • single occupancy with shared bathroom
  • single occupancy with ensuite bathroom
  • double occupancy with ensuite bathroom.

The units will be in rows, with shared bathrooms and communal kitchen, living and dining areas in most rows. At the centre of the site is the ‘Village Green’ which features shared facilities and open space including a half basketball court, geothermal pool, and further communal kitchen, meals and laundry facilities.

The development will consist of demountable modules that will be constructed off-site and delivered in two stages.

There were seven opposing submissions, mainly from local residents. Concerns raised included traffic and access, density, public safety, amenity, buffer distances (from the meat processing facility) and constriction impacts.

In its overall assessment, the Committee stated although the use of the site for key worker accommodation is not directly consistent with the purposes of the Farming Zone, the proposal supports an industry and employer on which the surrounding agricultural production areas rely. It noted the site is not suitable for farming because of its size and location, and the Amendment will not impact on the State’s supply of land suitable for agricultural production.

Its findings in relation to issues raised in submissions are as follows:

Traffic and parking

There are no traffic or parking reasons to not support the proposed development. Adjustments are needed to the exhibited Incorporated Document to ensure:

    • the Eccles Street upgrades are appropriately designed to ensure safe interactions between Village traffic and vehicles entering and exiting the driveways at 90 and 94 Merrivale Drive, and vehicles entering the Merrivale Drive service road
    • impacts of construction traffic are appropriately managed.

It is unclear whether the proposed parking provision will be sufficient. Parking requirements should be further assessed after Stage 1 is complete and before Stage 2 proceeds, and the plans adjusted to provide more on-site parking if necessary.

Site access

The proposed site access arrangements via Eccles Street are appropriate, subject to some adjustments to the conditions of the exhibited Incorporated Document.

Housing density

On balance, the number of dwellings and density of the proposal is acceptable despite the site not being identified in the Planning Scheme as an area for residential growth. The proposal satisfies a number of other policy objectives in the Planning Scheme, and will deliver a net community benefit.

Public safety

There are no public safety related reasons to not support the proposed development.

Amenity

The internal amenity of the proposed Village, including the units, is acceptable. With mitigation measures, train noise from the adjacent rail line will offer a reasonable level of amenity for future residents of the Village. The Village will have impacts on the amenity of the neighbourhood (primarily due to traffic), but these can be appropriately managed subject to the Committee’s recommended conditions, and will be acceptable.

Buffer distances

Stage 1 of the proposed development meets the recommended separation distances in both clause 53.10 of the Planning Scheme and EPA Publication 1518 Recommended separation distances for industrial residual air emissions. Parts of Stage 2 do not. The proposed approach of only proceeding with Stage 2 subject to a further Buffer Risk Assessment and Odour Risk Assessment is a sensible and balanced approach to address potential amenity impacts on the Village occupants, and the need to protect existing industries from complaints about amenity from Village occupants. A standard secondary consent mechanism for Stage 2 is preferred to a permit trigger.

Construction impacts

The construction impacts of the proposed development can be readily managed with standard construction techniques and existing legislation and guidelines, subject to the Committee’s recommended conditions in the Incorporated Document.

It will be interesting to see whether the Midfield model will be pursued in other regional and rural areas, including whether a number of local businesses may form a consortium to purse such an initiative if housing cannot be found for workers.

See also:

  • Guide to Planning Panels: Major commercial development